This Author published in this journals
All Journal Jurnal Transportasi
Alfiyah Alif
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

DESAIN AWAL DAN BIAYA PEMBUATAN KAPAL OPERASIONAL KAMPUS USN KOLAKA BERBAHAN FIBERGLASS Azhar Aras Mubarak; Samaluddin Samaluddin; Rahmawati Djunuda; Alfiyah Alif
Jurnal Transportasi Vol. 21 No. 2 (2021)
Publisher : Forum Studi Transportasi antar Perguruan Tinggi (FSTPT)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26593/jtrans.v21i2.5161.133-142

Abstract

Abstract Universitas Sembilanbelas November Kolaka is a university located in Kolaka Regency. This university has another campus, namely Campus B, which is located in Central Buton Regency and is separated by the sea. To increase access to these campuses, an operational ship is needed. This study aims to design an operational ship to serve the two campuses of the Universitas Sembilanbelas November Kolaka. The ship is designed using fiberglass. This study resulted in an operational ship design made of fiberglass, which has a capacity of 20 people with a maximum speed of 25 knots. The university's operational ship is 14.5 m long, 3.2 m wide, and has a draft of 0.5 m. The cost to build the ship is estimated at Rp1,526,820,000 including Value Added Tax. Keywords: operational ship; fiberglass; fiberglass ship; shipbuilding costs. Abstrak Universitas Sembilanbelas November Kolaka yang berkedudukan di Kabupaten Kolaka mempunyai Kampus B, yang berlokasi di Kabupaten Buton Tengah, dan dipisahkan oleh laut. Untuk meningkatkan akses ke kampus-kampus tersebut diperlukan kapal operasional. Studi ini bertujuan untuk merancang kapal operasional untuk melayani kedua kampus Universitas Sembilanbelas November Kolaka. Kapal dirancang menggunakan bahan fiberglass. Studi ini menghasilkan rancangan kapal operasional yang terbuat dari fiberglass, yang mempunyai kapasitas 20 orang dengan kecepatan maksimum 25 knot. Kapal operasional universitas ini mempunyai panjang 14,5 m, lebar 3,2 m, dan sarat 0,5 m. Biaya untuk membuat kapal diperkirakan sebesar Rp1.526.820.000 termasuk Pajak Pertambahan Nilai. Kata-kata kunci: kapal operasional; fiberglass; kapal fiberglass; biaya pembuatan kapal.