Claim Missing Document
Check
Articles

Found 6 Documents
Search

ANALISA BREAK EVENT POINT (BEP) TERHADAP LABA PERUSAHAAN Muhammad Yusuf
Esensi: Jurnal Bisnis dan Manajemen Vol 4, No 1 (2014): April 2014
Publisher : Faculty of Economic and Business

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15408/ess.v4i1.1955

Abstract

Break event point or the break-even point can be defined as a situation where the operating company does not make a profit and not a loss. The goal is to provide the knowledge to increase knowledge about the break event point (the point of principal) and its relationship with the company profit and to know how the results of the. Analysis break event point is very important for the leadership of the company to determine the production rate how much the cost will be equal to the amount of sales or in other words to determine the break event point we will determine the relationship between sales, production, selling price, cost, loss or profit, making it easier for leaders to take discretion.DOI: 10.15408/ess.v4i1.1955 
Analisis Perawatan Chiller dengan Metode Reliability Centered Maintenance dan Failure Mode Effect Analysis untuk Meningkatkan Kinerja dan Operasional Sistem Chiller di PT. PP Muhammad Yusuf
JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri) Vol 5, No 2 (2022): JITMI
Publisher : Universitas Pamulang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32493/jitmi.v5i2.y2022.p66-74

Abstract

PT. PP merupakan produsen produk rotan sintesis ramah lingkungan. Permasalahan selama ini kegiatan perawatan preventif dijadwalkan selama enam bulan sekali terhadap mesin Chiller, namun masih sering terjadi down saat mesin Chiller digunakan, namun ada kegiatan preventif  kurang yang dilakukan devisi Maintenance. Agar tujuan tersebut dapat tercapai penulis menganalisa secara detail dengan metode Reliability Centered Maintenance (RCM) dimana diapliakasikan awal nya adalah dengan mengetahui fungsi dan menurunnya kinerja mesin serta kerusakan yang sering terjadi atau terdeteksi pada suatu sistem maupun sub-sistem sampai pada level komponen. Tabel Failure Mode Effect Analisys (FMEA) untuk mengetahui resiko komponen kritis terbesar dengan total nilai Risk Priority Number (RPN) 270, nilai RPN Komulatif 34,98%. Hasil yang didapat berupa pemecahan masalah yaitu mengetahui penyebab yang sering mengakibatkan kegagalan atau menurunnya kinerja mesin komponen dan perusahaan melakukan interval waktu perawatan, perbaikan dan pergantian pada komponen Display Monitor 178,78 jam atau 7 hari kerja, guna meningkatnya kinerja mesin Chiller demi mendukung berjalannya proses produksi dan mengurangi gangguan yang menghambat operasional, untuk kegagalan yang lainya hanya dilakukan pemeliharaan korektif.
Analisis Perawatan Chiller dengan Metode Reliability Centered Maintenance dan Failure Mode Effect Analysis untuk Meningkatkan Kinerja dan Operasional Sistem Chiller di PT. PP Muhammad Yusuf
JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri) Vol 5, No 2 (2022): JITMI
Publisher : Universitas Pamulang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32493/jitmi.v5i2.y2022.p66-74

Abstract

PT. PP merupakan produsen produk rotan sintesis ramah lingkungan. Permasalahan selama ini kegiatan perawatan preventif dijadwalkan selama enam bulan sekali terhadap mesin Chiller, namun masih sering terjadi down saat mesin Chiller digunakan, namun ada kegiatan preventif  kurang yang dilakukan devisi Maintenance. Agar tujuan tersebut dapat tercapai penulis menganalisa secara detail dengan metode Reliability Centered Maintenance (RCM) dimana diapliakasikan awal nya adalah dengan mengetahui fungsi dan menurunnya kinerja mesin serta kerusakan yang sering terjadi atau terdeteksi pada suatu sistem maupun sub-sistem sampai pada level komponen. Tabel Failure Mode Effect Analisys (FMEA) untuk mengetahui resiko komponen kritis terbesar dengan total nilai Risk Priority Number (RPN) 270, nilai RPN Komulatif 34,98%. Hasil yang didapat berupa pemecahan masalah yaitu mengetahui penyebab yang sering mengakibatkan kegagalan atau menurunnya kinerja mesin komponen dan perusahaan melakukan interval waktu perawatan, perbaikan dan pergantian pada komponen Display Monitor 178,78 jam atau 7 hari kerja, guna meningkatnya kinerja mesin Chiller demi mendukung berjalannya proses produksi dan mengurangi gangguan yang menghambat operasional, untuk kegagalan yang lainya hanya dilakukan pemeliharaan korektif.
Analisis Total Productive Maintenance (TPM) dengan Metode Overall Equipment Effectiveness (OEE) pada Mesin Ekstrusi di PT. Polymindo Permata Agus Syahabuddin; Muhammad Yusuf; Marjuki Zulziar
JITMI (Jurnal Ilmiah Teknik dan Manajemen Industri) Vol 6, No 1 (2023): JITMI
Publisher : Universitas Pamulang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32493/jitmi.v6i1.y2023.p42-50

Abstract

The smooth running of a system or a production process requires support from several aspects, including machine maintenance and machine availability in the production system. Maintenance includes the efforts made to ensure the machine works well, effectively, efficiently, economically, functionally and optimally. Therefore we need a good maintenance management in order to support maintenance activities, this study aims to determine the effectiveness and the biggest problem that causes downtime on the extrusion machine. The steps taken to implement it are measuring Overall Equipment Effectiveness (OEE) and knowing the biggest factors that affect the calculation of the six big losses. The world class productivity standard formulated by the Japan Institute of Plant Maintenance (JIPM), is 85%. The results of the current OEE measurement show that the productivity of the extrusion machine is 76.18%. This value indicates that it does not reach the worldclass standard value.
Pengenalan Microsoft Word Pada Usia Dini Kepada Yayasan Roemah Tawon Muhammad Faisal; Ahya Mahfuzi; Nisan Yedidiya Sorayana Mendrofa; Azis Saputro; Muzakki Hafizh; Muhammad Ikhwal; Annis Syifa; Rizky Prasetyo; Muhammad Yusuf; Abdul Majid; Perani Rosyani
AMMA : Jurnal Pengabdian Masyarakat Vol. 1 No. 09 (2022): AMMA : Jurnal Pengabdian Masyarakat
Publisher : CV. Multi Kreasi Media

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Manage data and store information (data storage) practically and efficiently. In today's digital era, computer-based information and communication technology has influenced various aspects of life, including education, it is undeniable. This community service activity aims to provide assistance to participants of the ROEMAH TAWON Foundation in applying Microsoft Word. With this activity, it is hoped that it will make it easier for students to do word processing and make useful presentation media to facilitate the learning process. The method used in an effort to achieve the planned target or goal is the explanation of the material, practice (performance) and question and answer. The trainees are divided into groups. Each group was accompanied by one of the university students. To find out the success of the program activities that have been carried out, an evaluation is carried out. Evaluation is done by giving practical exams to determine the level of understanding of students regarding the material and training that has been provided. The conclusion of this activity is that community service has succeeded in increasing students' knowledge in the application of Microsoft Word. The students of the ROEMAH TAWON Foundation felt helped by the training that was carried out so that they could use computers or laptops in doing school assignments well, such as making papers to facilitate activities. Students gave a very positive response to the activities carried out and considered this activity very useful
Analisa Keselamatan dan Kesehatan Kerja Proyek Gedung WWTP Dengan Metode Hirarc Di PT. Huathai Construction Indonesia Shandynavia Arji Nandi Tami; Agus Syahabuddin; Muhammad Yusuf
Jurnal Industri dan Teknologi Samawa Vol 5 No 2 (2024): JITSA
Publisher : Program Studi Teknik Industri Universitas Teknologi Sumbawa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36761/jitsa.v5i2.4708

Abstract

The WWTP Building Construction Project is one of the projects engaged in the construction sector, where in the process there are various potential hazards that have an impact on work accidents and even occupational diseases (PAK). Therefore, with the Hazard Identification, Risk Assessment And Risk Control (HIRARC) method is a worksheet that is appropriate or can be applied to the construction of the WWTP Building. The purpose of this study is to determine the potential hazards and assess the K3 risk in the construction of the WWTP Building. This type of research uses a quantitative method with a descriptive-observational approach and a survey study design because it provides an overview of the potential hazards and risks in the construction of the WWTP Building using the HIRARC method. The results of the study showed that in the lightweight brick installation process, 20 potential hazards were identified, while the highest risk category was high risk 52% and the highest risk category was extreme risk 14%. In the plaster and cement wall work, 4 potential hazards were identified, while the highest risk category was moderate risk 60% and the highest risk category was high risk 40%. In ceramic work, 10 potential hazards were identified, while the highest and most risk categories were high risk 67%. In the gypsum partition wall work, 11 potential hazards were identified, while the highest risk category was moderate risk 56% and the highest risk category was extreme risk 22%. In the ladder work, 28 potential hazards were identified, while the highest risk category was moderate risk 47% and the highest risk category was extreme risk 24%.