ANALISA TINGKAT PREFERENSI PEGAWAI NEGERI SIPIL PEMERINTAH KABUPATEN BADUNG TERHADAP PERUMAHAN MENYONGSONG PUSPEM BARU I Putu Swihendra; I W. Yansen; I Gde Astawa Diputra
Jurnal Ilmiah Teknik Sipil Vol. 11, No. 2 Juli 2007
Publisher : Department of Civil Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (95.398 KB)

Abstract

Seiring dengan meningkatnya penduduk, kebutuhan masyarakat akan perumahan juga semakin meningkat. Demikian juga dengan Pegawai Negeri Sipil (PNS) Pemerintah Kabupaten Badung Propinsi Bali. Kebutuhannya terhadap perumahan memiliki berbagai motivasi. Dibuatnya Pusat Pemerintahan (Puspem) Kabupaten Badung di Sempidi - Dalung, akan memindahkan sebagian besar dinas dan instansi menjadi berada pada satu area, dengan harapan dapat melayani masyarakat secara maksimal. Akibat terjadinya perubahan tersebut akan mempengaruhi kehidupan PNS Badung. Tujuan penelitian ini adalah untuk mengetahui bagaimana tingkat preferensi PNS Badung terhadap perumahan, faktor apa yang dipertimbangkan, dan faktor apa yang lebih dominan serta apa keinginan PNS Badung untuk memenuhi preferensinya terhadap perumahan. Penelitian ini dilakukan dengan menggunakan metode Proportionate Stratified Random Sampling dalam pengambilan sampel, serta brainstorming dan wawancara dengan menggunakan kuisioner kepada PNS Badung dalam pengumpulan data, yang kemudian dianalisa deskriptif, uji normalitas data, uji Chi Square, dan uji Konkordansi Kendall’s. Analisa data menunjukkan bahwa tingkat preferensi PNS Badung terhadap perumahan sangat tinggi yaitu 92% yang tidak memiliki hambatan. Urutan faktor – faktor yang mempengaruhi tingkat preferensi adalah Faktor Lokasi, Harga, Sistem Pembayaran, Sarana Prasarana, dan Disain Bangunan. Perumahan yang diharapkan PNS Badung adalah di sekitar lokasi Puspem Pemkab Badung kurang lebih 2-5 km,memiliki jaringan infrastruktur dan fasilitas sosial berupa balai untuk olahraga, tipe bangunan 45 m2, luas lahan 100 – 125 m2, non finishing , kisaran harga 76 – 175 juta rupiah dengan sistem pembayaran kredit uang muka 20 – 35 %. Abstract: Along with the increasing of society’s total, the need of housing is also increasing. It is also happened to the Civil Servants of Badung Regency. The necessaries of the house have some motivations. By the making of Badung Regency Civic Center in Sempidi – Dalung, it will remove most of the instances to be located in the same area, which aim to give a maximal service to the society. The effect of this changing, there will be a changed the Civil Servants life. The purpose of this observation is to know about the preference level of them to the housing, what are the factors to be compared and which factor is more dominant to fill the Civil Servants preference to the housing. The method of the observation used by Proportionate Stratified Random Sampling, and for collecting the data brainstorming and interview method are used by giving the questionnaires to Civil Servants. Then those data is analyzed descriptively. After that, the test of data normality, Chi Square test, and Kendall’s Concordat ion test The data analysis shows that the preference level of Civil Servants in Badung Regency to the housing was very high ( 92 % ) which does not find any obstacles. The factors which influence the preference level are about location, cost, the payment system, tools, and building design. The expectation of housing location of the Civil Servants is around the Badung Regency Civic Center (about 2-5 km), having infrastructure network, and social facilities ( i.e. Sport Building ), building type 45 m2, with 100 – 125 m2 area’s spacious non finishing, and the cost is about 76-175 million rupiah by the down payment credit system is about 20-35%.
ANALISIS FAKTOR – FAKTOR YANG MEMPENGARUHI KETERLAMBATAN PROYEK JALAN LINGKUNGAN PERMUKIMAN DI KABUPATEN BADUNG Ni Luh Yuli Ekawati; GAP. Candra Dharmayanti; I W. Yansen
JURNAL SPEKTRAN Vol. 3, No. 2, Juli 2015
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (478.453 KB) | DOI: 10.24843/SPEKTRAN.2015.v03.i02.p07

Abstract

In reality, the construction of local roads for housing in Badung Regency has faced barriers, which causes delay to the projects. Therefore, the projects cannot run based on the schedule. Although the constructions has been done on different road and by different contractors, the delay is still repeatedly occurred in every stage of the construction, started from the tender, constructions and post constructions stage. This study purposed to identify factors and the main factors that influence the delay of the construction of local roads for housing area. The identification was determined based on three stages of constructions. Data collection was conducted using questionnaires, involved 54 respondents those are participated in the construction of local roads for housing area in Badung Regency in 2012 and 2013.  Data analysis covered factor analysis. The result shows that there are six factors that influence delay of the construction of local roads for housing in Badung Regency. This covers: one factor at the tender stage which is the unpreparedness of the contractor’s employees; four factors at the constructions stage, which are material and time schedule, alteration and controlling, lack of labour and equipment, and financial and weather; and one factor at the post construction stage, which is the penalty for the contractors. Among these six, the main factors that cause delays are: the unpreparedness of the contractor’s employees for submitting documents to the electronic procurement (at the tender stage); lack of paving block supply (at the construction stage); and the unclear penalty for the contractors (at the post construction stage).
HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG Ida Ayu Ari Brahmantariguna; GAP. Candra Dharmayanti; I W. Yansen
JURNAL SPEKTRAN Vol 4 No 2 (2016): Vol. 4, No. 2, Juli 2016
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (419.152 KB) | DOI: 10.24843/SPEKTRAN.2016.v04.i02.p07

Abstract

Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude) and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.
ANALISIS FAKTOR – FAKTOR PEMILIHAN PEMENANG LELANG JASA KONSTRUKSI PADA PROYEK PEMERINTAH DI KABUPATEN SIKKA Gaudensius Nong Pio; I N. Sutarja; I W. Yansen
JURNAL SPEKTRAN Vol. 3, No. 2, Juli 2015
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (586.848 KB) | DOI: 10.24843/SPEKTRAN.2015.v03.i02.p08

Abstract

This study aims to determine the factors that influence the selection of the winning bidder in the construction of government projects in Sikka district and determine the most dominant factors. The sample in this study was 57 respondents. Sampling was conducted using a non-probability sampling technique with purposive sampling. Data analysis was performed by factor analysis.   The results of the study obtained 4 factors that influenced the selection of the winning bidder with 84.004% cumulative variance. Factors that influenced were the dominant factor I from 15 variables namely, completeness and suitability of substantial terms requested in the bidding documents; the experience of the company/contractor; bank reference/support of banks; completeness and availability as well as the number of different types of tools/equipment/construction equipment; the availability of education and experience of personnel/field project staff; relationship/ proximity to the project owner; the validity and completeness of the offer letter; the validity of a business license; a contractor offers had to be the lowest prices and the detailed points were competitively priced; meeting tax obligations; the company was not in the custody of the court and was not included in the black list; the contractor would follow and respond quickly to requests; instructions and orders of the project owner for the repair/construction design changes; originality, suitability and validity of bid security letters; methods and strategies for the use and control of the work; the contractor completed the work in accordance with the quality required and in accordance with the specifications of the contract price.