Claim Missing Document
Check
Articles

Found 17 Documents
Search

PENGARUH PENGGUNAAN CETAKAN SPASI TERHADAP KEBUTUHAN BAHAN PADA PEKERJAAN PASANGAN BATA Albani Musyafa
TEKNISIA Vol. XX, No. 2, November 2015
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

For construction of million houses needed by Indonesians, material efficiency should be prioritized. This is because so many wasted materials in the process. For example, much mortar is wested on a masonry work. To minimize the waste, a mortar mold should be used. The objective of this study was to determine the efficiency that could be got by using a mortar mold in a masonry work. The reseach method was experiments. The result was determined by comparing the mortar needs between the two ways, i.e. with and without the masonry mold tool. Twenty-one experiments have been conducted for each way. The results of this study indicate that using of the tool could save about 23% of mortar or 23% of the material cost.
PENERAPAN KONSEP ECO-SETTLEMENT PADA SARANA PRASARANA INFRASTRUKTUR PENDUKUNG PERMUKIMAN HUNTAP (STUDI KASUS : HUNTAP PAGERJURANG DAN HUNTAP KARANGKENDAL KECAMATAN CANGKRINGAN) Hanindya Kusuma Artati; Albani Musyafa
TEKNISIA Vol. XX, No. 2, November 2015
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Eco-settlement infrastructure planning is a concept that puts the balance of the ecosystem at a settlement. This concept is urged to apply to residential areas, especially in the area of the catchment. Huntap as a settlement area also need to apply the concept of eco-settlement. After the eruption of Merapi, Huntap development is mostly done in the area of Cangkringan which is the catchment area that supplies water in the city of Jogjakarta. The purpose of this study was to report the results of the application of eco-settlement planning on huntap in Cangkringan area. The method used in this research are: 1) Identification of the condition of settlement infrastructure that had been built 2) comparative analysis of results of this identification with the concept of eco-settlement, 3) to formulate the results of the analysis. From the analysis, we can conclude that the development of infrastructure in the dwelling in accordance with the concept of eco-settlement.
PENGEMBANGAN MODEL UNTUK MEMPREDIKSI BIAYA PEMBANGUNAN RUMAH LAYAK HUNI BERDASARKAN HARGA BAHAN Albani Musyafa
TEKNISIA Vol. XXI, No. 2, November 2016
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cost estimate is very important for all parties involved in a construction, such as owners, contractors, consultants, investors. A method for calculation of cost estimate is Budget Plan (RAB). However, the calculation requires some competencies and time. The objective of this study is to develop a easier method to calculate the cost estimation, i.e. by developing formulations of RAB based on the price of some materials. This research was carried out on simple house projects, which was built in 2014 in regions of Magelang, Bantul, Sleman and Yogyakarta. The data were collected by observation and interviews in the fields. The interviews were conducted to collect information of material prices and labor costs used as the independent variables. While, the observation aimed to calculate the value of RAB used as the dependent variable. Analysis of data used the correlation and regression techniques. Based on the analysis, the variables with strong correlation with RAB is prices of the brick (0.907), while the correlation between employee wage and RAB is quite low. The regression analysis resulted that the cost of house construction can be predicted by equations: RAB = 66,823 X1 - 1.277.771 or RAB = 53,244 X1+ 26,423 X2 -1.826.152, with X1 is the price of standard brick per hundred pieces expressed in rupiah and X2 is a prices of floor covering material per square meter  stated in rupiah. Based on the validation, the accuracy of the formulations is over 97%. Estimasi biaya memiliki fungsi yang sangat penting dalam dunia konstruksi bagi semua pihak yang terlibat di dalam konstruksi seperti owner dan investor. Salah satu cara membuat estimasi harga tersebut adalah dengan menggunakan Rencana Anggaran Biaya (RAB).   Bagaimanapun, cara perhitungan tersebut memerlukan kompetensi, ketelitian dan membutuhkan waktu yang cukup lama. Penelitian ini bertujuan mencari cara yang lebih mudah dan cepat untuk menghitung estimasi biaya, yaitu dengan mencari formulasi yang bisa digunakan untuk menghitung nilai RAB dengan variabel bebas harga bahan dan upah tenaga kerja. Penelitian ini dilakukan pada proyek-proyek rumah sederhana tipe 45, yang dibangun pada tahun 2014 di komplek perumahan yang ada di Kabupaten Magelang, Kabupaten Bantul, Kabupaten Sleman dan kota Yogyakarta. Pengumpulan data dilakukan dengan cara observasi dan wawancara langsung di lapangan. Wawancara dilakukan untuk mendapatkkan informasi harga bahan dan upah tenaga kerja yang digunakan sebagai variabel bebas. Sedangkan observasi dilakukan untuk menghitung nilai RAB yang digunakan sebagai variabel terikat. Analisis data penelitian menggunakan teknik korelasi dan regresi. Dari hasil analisis korelasi dan regresi, variabel yang memiliki hubungan paling tinggi dengan nilai rencana anggaran biaya bata merah dengan nilai koefisien korelasi 0,907 yang berarti variabel bebas tersebut memiliki korelasi yang sangat kuat terhadap variabel terikat. Sementara itu korelasi upah tenaga kerja dan RAB cukup rendah. Dari hasil analisis regresi untuk semua variabel bebas didapat persamaan yang dapat digunakan untuk menghitung nilai RAB yaitu, RAB = 66,823 X1 - 1.277.771 atau RAB = 53,244 X1+ 26,423 X2 -1.826.152, dengan X1  adalah harga batu bata ukuran 22 x 11 x 5,5 per seratus buah yang dinyatakan dalam rupiah dan X2 adalah harga material penutup lantai per meter persegi yang dinyatakan dalam rupiah. Formulasi tersebut memberikan tingkat akurasi yang cukup baik, yaitu diatas 97 %.
ANALISIS SISA MATERIAL PEKERJAAN STRUKTUR PADA PROYEK KONSTRUKSI rizky sudiro; Albani Musyafa
TEKNISIA Vol. XXIII, No. 1, Mei 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pada pelaksanaan suatu proyek konstruksi, tidak akan dapat dihindari munculnya sisa material konstruksi. Oleh karena itu, dibutuhkan mekanisme pengelolaan, teknologi, sistem penilaian dan pengelolaan limbah yang komprehensif dan terpadu. Penelitian ini bertujuan untuk mengetahui sisa material konstruksi yang memiliki banyaknya sisa pada pekerjaan struktur, faktor-faktor penyebab sisa material serta solusi efektif dalam mengatasi sisa material konstruksi yang terjadi.Penelitian ini dilakukan pada proyek pembangunan di beberapa gedung tingkat tinggi. Data penelitian diperoleh dengan survei menggunakan kuisioner. Narasumbernya adalah orang-orang yang berhubungan dengan penggunaan material pada pekerjaan struktur seperti pelaksana, cost control engineer, logistik serta gudang. Data diolah dengan analisis perbandingan dan keselarasan data dengan uji konkordansi kendall, serta penjelasan korelasi antara persentase sisa material pekerjaan struktur dan tindakan pencegahannya dengan uji spearman.Hasil penelitian ini menunjukkan bahwa Triplek memiliki kuantitas sisa material yang terbesar pada pekerjaan struktur, karena triplek merupakan material pada pekerjaan bekisting, kejadian penyebab terjadinya sisa material pekerjaan struktur yang paling tinggi adalah perubahan desain, tindakan pencegahan dalam mengatasi sisa material pekerjaan struktur yang terjadi yaitu melakukan monitoring pekerjaan.
Harapan dan Penilaian Industri Konstruksi terhadap Ketrampilan Lulusan Teknik Sipil Albani Musyafa
Unisia Vol. 32 No. 71 (2009): Jurnal Unisia
Publisher : Universitas Islam Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20885/unisia.vol32.iss71.art4

Abstract

This research proposes to explore the quality of graduates of higher education in civilengineering in Australia. The result of the research can be used to help civil engineeringeducation providers to apply a strategy to improve the quality of their graduates. The studyuses primary data from the personal of construction industry, the data of which are analyzedstatistically. This study reveals about the evaluation of the skill of civil engineeringgraduates by construction industry; the expectation of construction industry toward theskill which has to be mastered by graduates of civil engineering; and the gap between theevaluation and the expectation.Keywords: construction industry, skill of graduates, quality of graduates, civil engineering.
Success Factor Management Analysis of Self-Management System For Building Projects Jamal; Albani Musyafa; Faisol AM; Fitri Nugraheni
Jurnal Internasional Teknik, Teknologi dan Ilmu Pengetahuan Alam Vol 4 No 2 (2022): International Journal of Engineering, Technology and Natural Sciences
Publisher : University of Technology Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (331.495 KB) | DOI: 10.46923/ijets.v4i2.176

Abstract

The requirement of project management in construction is needed to be able to set priority aspects of implementation from the beginning to the end, to make it succeed and happen as a plan. Self-management is one of the managements to the owner and some scope is to universities that have resources qualified as self-management. Success factor analysis of self-management aims to determine the priority success factors and characteristics of buildings that can be used for self-management. The analytical method used in this research is Analytical Hierarchy Project or AHP. Based on the results of the study, it was obtained 4 respondents who met the criteria for self-management and 10 factors of success, namely quality with 21.33%, leadership / managerial 16.94%, cost 16.89%, 15.68% customer satisfaction, administration 8%, human resources 7.40%, and the other factors such as time with 4.79%, suppliers 3.24%, labor 3.17%, and place characteristics 1.99%. The characteristics of buildings can be done independently, namely; having location or place of development that is owned by the community in a certain area, possessing the development that empowers human resources belonging to mass organizations and community groups, and owning a team of consultants and supervisors to improve planning, scheduling, and increased supervision.
PENGEMBANGAN MODEL PENYEDIAAN RUMAH UNTUK MEMENUHI PERMINTAAN DI INDONESIA Albani Musyafa
Structure Vol 5, No 1 (2023): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/civil.v5i1.8267

Abstract

Procurement of residential buildings or houses in a region requires a standard calculation method. In reality, such planning for housing in Indonesia has not been calculated based on a standard. With such standard, the development stage can be carried out with measurable resource requirements. The purpose of this research is to develop a method for calculating housing needs for an area so that this method can be used as a basis for procurement of housing in regions in Indonesia. The methodology used in this research is drafting the concept, trial and error based on the concept, discussing with experts and validating the results. The result of this research indicated that this calculation method could be used at various levels of the regions in Indonesia.Keywords: planning, procurement, housing, region
STUDI DEVIASI PENERAPAN ASPEK HUKUM PENGADAAN KONSTRUKSI Erdin Fahlefi; Akhmad Suraji; Albani Musyafa
JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI Vol. 1 No. 3 (2023): Juli
Publisher : CV. ALIM'SPUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59024/jisi.v1i3.288

Abstract

In construction procurement in Indonesia there are still deviations in the tender process. The deviation is caused by an opportunity during the construction bidding process. The service providers are mutually looking for opportunities to seek personal or group benefits or from the working group that makes these deviations. This causes state losses due to deviations in the construction bidding process. This research was conducted by collecting data from institutions that have the authority to decide whether or not deviations occur in the auction process. The institution authorized to decide whether or not a deviation occurs is the Commission for the Supervision of Business Competition of the Republic of Indonesia (KPPU RI). This study uses a questionnaire to find out how much the causes and impacts on state losses are caused by deviations in the auction process and uses the Probability and Impact Matrix method to determine the level of implication values of the causes and impacts of deviations in each case using a case base analysis approach. The results obtained based on the decision are as many as 12 types of deviation based on the case decision. The impact of deviations that occur in construction procurement is material and immaterial losses. The causes of deviation in construction procurement are caused by four factors, namely the factor of wanting to obtain personal or group benefits, opportunities, pressure and business climate. The most contributing factor to the occurrence of deviation is the combined conspiracy and vertical conspiracy resulting in a value of 11.38%.
Perencanaan Pengadaan Rumah Layak Huni dalam Time Series untuk Keseimbangan Supply-Demand Albani Musyafa
Jurnal Permukiman Vol 18 No 1 (2023)
Publisher : Direktorat Bina Teknik Permukiman dan Perumahan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31815/jp.2023.18.16-24

Abstract

Idealnya pasokan (supply) dan permintaan (demand) dari suatu barang atau jasa harus memenuhi prinsip keseimbangan, termasuk pengadaan rumah layak huni untuk masyarakat luas. Pengadaan rumah layak huni untuk masyarakat umum di Indonesia dilakukan oleh Pemerintah, pengembang (developer) dan masyarakat. Saat ini, masyarakat mengalami kekurangan (backlog) rumah layak huni yang sangat besar. Supply yang ada diharapkan dapat mengurangi atau membereskan backlog tersebut. Tujuan dari tulisan ini adalah melakukan perhitungan kebutuhan dan pengadaan dalam time series sehingga tercapai keseimbangan supply-demand dari rumah layak huni. Metode yang digunakan dalam perhitungan ini adalah: a. menyusun konsep dan variabel perhitungan kebutuhan rumah layak huni dan perhitungan pengadaan rumah layak huni yang realistis, b. mencari data yang relevan yang tersedia secara online dan valid untuk perhitungan-perhitungan tersebut, dan c. melakukan coba-coba sehingga terjadi keseimbangan supply-demand pada waktu yang realistis berdasarkan besarnya nilai backlog dan kapasitas bangun yang ada. Hasil yang didapat dari penelitian ini adalah bahwa keseimbangan antara supply dan demand akan terjadi pada tahun akhir 2048 jika terjadi supply sekitar 2,7 juta unit rumah layak huni per tahun dimulai tahun 2023.
Pentingnya Penerapan Etika Profesi Teknik Sipil dalam Pengambilan Keputusan Resiko Keselamatan dan Kesehatan Kerja & Lingkungan (K3L) Aditya Imam Wibisono; Albani Musyafa
Jurnal Teknik Mesin, Industri, Elektro dan Informatika Vol. 3 No. 3 (2024): September : JURNAL TEKNIK MESIN, INDUSTRI, ELEKTRO DAN INFORMATIKA
Publisher : Pusat Riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jtmei.v3i3.4225

Abstract

This study aims to analyze the importance of applying professional ethics in civil engineering for decision-making related to safety, health, and environmental risks (K3L). This is crucial because, like other professions, civil engineering is a complex and intricate field that requires not only engineers with good technical skills but also sound decision-making abilities. The decision-making process significantly impacts the execution of infrastructure projects. Professional ethics serve as a guideline for engineers in making decisions that consider K3L. The issue is that decision-making is not solely based on technical skills but also on other soft skills such as emotional control. This study found that emotional intelligence (EQ) can influence the decision-making process of engineers. The higher an engineer's emotional intelligence, the better their decision-making regarding K3L risks. This is also related to engineers adhering to the professional code of ethics. Furthermore, good decision-making processes are expected to promote sustainable infrastructure development.