Claim Missing Document
Check
Articles

Found 6 Documents
Search
Journal : Semesta Teknika

Dampak Parkir Khusus Wisata Terhadap Simpang Bersinyal Jalan Perkotaan: Studi Kasus Persimpangan Ngabean, Yogyakarta Mahmudah, Noor; Tubagus, Adhytia
Semesta Teknika Vol 18, No 1 (2015): MEI 2015
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of Special Region of Yogyakarta has been occuring rapidly due to this region is well known as student city and the primary tourism destination in Indonesia. One of the transportation problems related to the tourism activities is traffic conflict due to parking area of tourism bus in Ngabean, Yogyakarta City. Therefore it is needed to evaluate signalized junction around the parking area in order to reach the optimal performance. The study carried out among other by conducting field survey to the existing condition (performance) of signalized junction either in the weekend (Saturday) and weekday (Monday), especially by evaluating the degree of saturation (ds). The analysis results showed that the degree of saturation in the weekend is 0,89, which is higher than the allowed one (ds=0,85). Since the degree of saturation in the weekday is 0,76 so it is relatively good. The scenarios (model) applied to improve the overall junction performance are by estricting (prohibiting) left turning on red (LTOR) and by carrying out road widening. The final result obtained from the scenario (model) is the degree of saturation (ds) becomes lower than the allowed value (0,83<0,85) for all approaches in the signalized junction. 
Analisis Panjang Runway untuk Pendaratan dan Take-off Pesawat Airbus A330-200 dan A330-300 Setiawan, Dian M; Mahmudah, Noor; Putra, Edo Laksmana
Semesta Teknika Vol 22, No 1 (2019): MEI 2019
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.221233

Abstract

AbstrakOtoritas Bandara Radin Inten II merenovasi bandara mulai dari memperpanjang landasan pacu serta memperluas apron dan bangunan terminalnya. Landasan pacu diperpanjang dari sebelumnya 2.500 m menjadi 3.000 m. Pengembangan ini dilakukan karena Bandara Radin Inten II dipilih menjadi embarkasi haji penuh dan juga karena adanya potensi peningkatan aktivitas bandara setiap tahunnya. Bandara juga harus mampu mengakomodasi pesawat Airbus A330-200 dan A330-300 untuk meningkatkan kapasitas penumpang. Penelitian ini dilakukan dengan mengevaluasi kondisi yang ada dari Bandara Radin Inten II dan menganalisis apakah landasan pacu di Bandara Radin Inten II dapat mengakomodasi Airbus A330-200 dan A330-300. Hasil analisis menunjukkan bahwa terdapat peningkatan yang signifikan dalam kegiatan penumpang dan kargo. Selanjutnya, Bandara Radin Inten II dapat melayani jenis pesawat Airbus A330-200 dengan panjang landasan pacu yang dibutuhkan 2.753 m untuk pesawat tersebut, sedangkan pesawat A330-300 tidak dapat dilayani karena pesawat ini membutuhkan panjang landasan 3100 m untuk lepas landas dan mendarat dengan aman.AbstractThe 2nd Radin Inten Airport authorities renovate its airport starting from extending the runway as well as expanding the apron and its terminal building. The runway was extended from previously 2,500 m to 3,000 m. The development was due to the 2nd Radin Inten Airport was chosen to become a full hajj embarkation and also due to a potential increase in airport activity every year. The airport also must be able to accommodate the Airbus A330-200 and A330-300 aircraft to increase passenger capacity. The study was conducted by evaluate the existing conditions of the 2nd Radin Inten Airport and analyse whether the runway at the 2nd Radin Inten Airport can accomodate the Airbus A330-200 and A330-300. The results of the analysis showed that there were significant increases in the passenger and cargo activities. Furthermore, 2nd Radin Inten Airport can serve Airbus A330-200 aircraft types with the required runway length of 2,753 m for such aircraft, while the A330 aircraft -300 unable to be served because this aircraft requires 3,100 m runway length in order to take-off and landing safely.
PELAKSANAAN INSPEKSI KESELAMATAN PADA PERLINTASAN SEBIDANG JPL 349 KM 163+758, JALAN TIMOHO, YOGYAKARTA Mahmudah, Noor; Setiawan, Dian M; Ramanti, Ristacya Devi
Semesta Teknika Vol 22, No 2 (2019): NOVEMBER 2019
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Kecelakaan yang terjadi antara kendaraan jalan raya dan kereta api dapat terjadi di perlintasan sebidang walaupun sudah dilengkapi dengan prasarana yang telah ditentukan. Penelitian ini bertujuan untuk menginspeksi keselamatan perlintasan sebidang di JPL 349, Jalan Timoho, Yogyakarta, karena lokasi perlintaasan sebidang ini berdekatan dengan pusat kegiatan masyarakat. Metode penelitian ini diawali dengan studi pustaka dan pengumpulan data primer dan data sekunder. Data primer terdiri dari data kelengkapan infrastruktur, data geometrik, volume lalulintas, tundaan lalulintas, panjang antrian kendaraan, dan indeks kondisi struktur perkerasan (Pavement Condition Index). Sementara itu, data sekunder berupa jadwal kedatangan dan keberangkatan kereta api. Hasil penelitian ini menunjukkan bahwa perlintasan sebidang JPL 349 tidak memenuhi persyaratan yang berlaku terkait dengan rambu, marka, interval waktu kedatangan kereta api, sudut perpotongan perlintasan, jarak antara perlintasan sebidang yang berdekatan, dan alinemen horizontal. Tundaan lalulintas terlama ialah sebesar 194 detik dan antrian kendaraan terpanjang ialah 210 meter. Selain itu, disimpulkan bahwa nilai indeks kondisi struktur perkerasan ialah sebesar 72.9% (sangat bagus).Accidents between motorized vehicles and trains may occur at level crossings even though it has been maintained and given an adequate infrastructure. This study aims to conduct a safety inspections at JPL 349, Timoho Street, Yogyakarta since the level crossing location close to the center of human activity. This research method begins with a literature study and primary and secondary data collection. The primary data consisted of infrastructure completeness data, highway and rail track geometric, traffic volume, traffic delay, vehicles queue length, and pavement condition index (PCI). While secondary data was in the form of train departure and arrival schedules. The conclusions of this study stated that the JPL 349 level crossing do not meet the applicable regulatory standards in terms of signs, markers, train travel time intervals, intersection angles between highway and rail track, and the distance between level crossings. In terms of geometric, the horizontal alignment of the highway was also not in accordance with the applicable regulations. The longest traffic delay was 194 seconds and the longest queue of vehicles was 210 m. In addition, it was known that the average PCI was 72.9% (very good). 
Dampak Parkir Khusus Wisata Terhadap Simpang Bersinyal Jalan Perkotaan: Studi Kasus Persimpangan Ngabean, Yogyakarta Noor Mahmudah; Adhytia Tubagus
Semesta Teknika Vol 18, No 1 (2015): MEI 2015
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.v18i1.705

Abstract

The development of Special Region of Yogyakarta has been occuring rapidly due to this region is well known as student city and the primary tourism destination in Indonesia. One of the transportation problems related to the tourism activities is traffic conflict due to parking area of tourism bus in Ngabean, Yogyakarta City. Therefore it is needed to evaluate signalized junction around the parking area in order to reach the optimal performance. The study carried out among other by conducting field survey to the existing condition (performance) of signalized junction either in the weekend (Saturday) and weekday (Monday), especially by evaluating the degree of saturation (ds). The analysis results showed that the degree of saturation in the weekend is 0,89, which is higher than the allowed one (ds=0,85). Since the degree of saturation in the weekday is 0,76 so it is relatively good. The scenarios (model) applied to improve the overall junction performance are by estricting (prohibiting) left turning on red (LTOR) and by carrying out road widening. The final result obtained from the scenario (model) is the degree of saturation (ds) becomes lower than the allowed value (0,830,85) for all approaches in the signalized junction. 
Analisis Panjang Runway untuk Pendaratan dan Take-off Pesawat Airbus A330-200 dan A330-300 Dian M Setiawan; Noor Mahmudah; Edo Laksmana Putra
Semesta Teknika Vol 22, No 1 (2019): MEI 2019
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.221233

Abstract

AbstrakOtoritas Bandara Radin Inten II merenovasi bandara mulai dari memperpanjang landasan pacu serta memperluas apron dan bangunan terminalnya. Landasan pacu diperpanjang dari sebelumnya 2.500 m menjadi 3.000 m. Pengembangan ini dilakukan karena Bandara Radin Inten II dipilih menjadi embarkasi haji penuh dan juga karena adanya potensi peningkatan aktivitas bandara setiap tahunnya. Bandara juga harus mampu mengakomodasi pesawat Airbus A330-200 dan A330-300 untuk meningkatkan kapasitas penumpang. Penelitian ini dilakukan dengan mengevaluasi kondisi yang ada dari Bandara Radin Inten II dan menganalisis apakah landasan pacu di Bandara Radin Inten II dapat mengakomodasi Airbus A330-200 dan A330-300. Hasil analisis menunjukkan bahwa terdapat peningkatan yang signifikan dalam kegiatan penumpang dan kargo. Selanjutnya, Bandara Radin Inten II dapat melayani jenis pesawat Airbus A330-200 dengan panjang landasan pacu yang dibutuhkan 2.753 m untuk pesawat tersebut, sedangkan pesawat A330-300 tidak dapat dilayani karena pesawat ini membutuhkan panjang landasan 3100 m untuk lepas landas dan mendarat dengan aman.AbstractThe 2nd Radin Inten Airport authorities renovate its airport starting from extending the runway as well as expanding the apron and its terminal building. The runway was extended from previously 2,500 m to 3,000 m. The development was due to the 2nd Radin Inten Airport was chosen to become a full hajj embarkation and also due to a potential increase in airport activity every year. The airport also must be able to accommodate the Airbus A330-200 and A330-300 aircraft to increase passenger capacity. The study was conducted by evaluate the existing conditions of the 2nd Radin Inten Airport and analyse whether the runway at the 2nd Radin Inten Airport can accomodate the Airbus A330-200 and A330-300. The results of the analysis showed that there were significant increases in the passenger and cargo activities. Furthermore, 2nd Radin Inten Airport can serve Airbus A330-200 aircraft types with the required runway length of 2,753 m for such aircraft, while the A330 aircraft -300 unable to be served because this aircraft requires 3,100 m runway length in order to take-off and landing safely.
Pelaksanaan Inspeksi Keselamatan pada Perlintasan Sebidang JPL 349 KM 163+758, Jalan Timoho, Yogyakarta Noor Mahmudah; Dian M Setiawan; Ristacya Devi Ramanti
Semesta Teknika Vol 22, No 2 (2019): NOVEMBER 2019
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/st.222242

Abstract

Kecelakaan yang terjadi antara kendaraan jalan raya dan kereta api dapat terjadi di perlintasan sebidang walaupun sudah dilengkapi dengan prasarana yang telah ditentukan. Penelitian ini bertujuan untuk menginspeksi keselamatan perlintasan sebidang di JPL 349, Jalan Timoho, Yogyakarta, karena lokasi perlintaasan sebidang ini berdekatan dengan pusat kegiatan masyarakat. Metode penelitian ini diawali dengan studi pustaka dan pengumpulan data primer dan data sekunder. Data primer terdiri dari data kelengkapan infrastruktur, data geometrik, volume lalulintas, tundaan lalulintas, panjang antrian kendaraan, dan indeks kondisi struktur perkerasan (Pavement Condition Index). Sementara itu, data sekunder berupa jadwal kedatangan dan keberangkatan kereta api. Hasil penelitian ini menunjukkan bahwa perlintasan sebidang JPL 349 tidak memenuhi persyaratan yang berlaku terkait dengan rambu, marka, interval waktu kedatangan kereta api, sudut perpotongan perlintasan, jarak antara perlintasan sebidang yang berdekatan, dan alinemen horizontal. Tundaan lalulintas terlama ialah sebesar 194 detik dan antrian kendaraan terpanjang ialah 210 meter. Selain itu, disimpulkan bahwa nilai indeks kondisi struktur perkerasan ialah sebesar 72.9% (sangat bagus).Accidents between motorized vehicles and trains may occur at level crossings even though it has been maintained and given an adequate infrastructure. This study aims to conduct a safety inspections at JPL 349, Timoho Street, Yogyakarta since the level crossing location close to the center of human activity. This research method begins with a literature study and primary and secondary data collection. The primary data consisted of infrastructure completeness data, highway and rail track geometric, traffic volume, traffic delay, vehicles queue length, and pavement condition index (PCI). While secondary data was in the form of train departure and arrival schedules. The conclusions of this study stated that the JPL 349 level crossing do not meet the applicable regulatory standards in terms of signs, markers, train travel time intervals, intersection angles between highway and rail track, and the distance between level crossings. In terms of geometric, the horizontal alignment of the highway was also not in accordance with the applicable regulations. The longest traffic delay was 194 seconds and the longest queue of vehicles was 210 m. In addition, it was known that the average PCI was 72.9% (very good).