Claim Missing Document
Check
Articles

Found 2 Documents
Search

Evaluasi Arus Asut Υ-Δ dengan Kapasitor Tambahan pada Motor Listrik Pompa Re-injeksi di Area Panas Bumi Lahendong Monika S. Mumu; Martinus Pakiding; A. F. Nelwan; Filman Lisi
Jurnal Teknik Elektro dan Komputer Vol. 3 No. 2 (2014): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v3i2.4495

Abstract

Abstract-- One of the matter about operation of induction motor is starting motor. Starting motor usually is the big problem on operation of motor because its starting current. Hence, to reduce starting current, so used method of reduced voltage. In this research using Υ-Δ starter infuse capacitor. Purpose of this thesis is to evaluate behavior of induction motor when starting and running, to show current and voltage rate when starting and running, and to explain about impact of capacitor on Υ-Δ starter infuse capacitor. The result of this measurement showed that capacitor gives impact to reduce starting current. On Υ–Δ starter (without capacitor), staring current is 278 [A], whereas on Υ–Δ starter infuse capacitor (70 [kVAr]), staring current is 243.4 [A] Keywords   : Capacitor, Induction motor, Infuse capacitor, Starting current. Abstrak-- Salah satu hal yang harus dipertimbangkan dalam pengoperasian motor induksi yaitu pengasutan (starting) motor. Pengasutan motor ini yang biasanya menjadi masalah besar dalam pengoperasian motor. Oleh karena itu untuk mengurangi arus asut maka digunakan metode penurunan tegangan. Pada penelitian ini metode yang digunakan yaitu pengasutan Υ-Δ infuse capacitor. Penelitian ini bertujuan untuk mengevaluasi perilaku motor pada saat pengasutan dan pengoperasional motor induksi, memperlihatkan besar arus dan tegangan pada saat pengasutan dan pengoperasian motor induksi, dan menjelaskan bagaimana pengaruh penambahan kapasitor pada rangkaian pengasutan Υ–Δ. Hasil pengukuran menunjukkan bahwa kapasitor memberi pengaruh dalam penurunan besar arus asut. Pada pengasutan Υ–Δ tanpa kapasitor, besar arus asut yang diukur adalah 278 [A], sedangkan pada pengasutan Υ–Δ infuse capacitor (70 [kVAr]), besar arus asut yang diukur adalah 243,4 [A]. Kata kunci : Arus asut, Infuse capacitor, Kapasitor, Motor induksi.
Redesain Instalasi Listrik Dikantor Pusat Universitas Sam Ratulangi Alfano B.C. Dien; Vecky C. Poekoel; Martinus Pakiding
Jurnal Teknik Elektro dan Komputer Vol. 7 No. 3 (2018): Jurnal Teknik Elektro dan Komputer
Publisher : Universitas Sam Ratulangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35793/jtek.v7i3.23635

Abstract

Abstract—Problems in electrical installation are still widely found in the field, in the Rektorat Building of UNSRAT found probles in the installation of electrical installation, such as the neatness of the electrical installation path and the setting in the Rektorat building. This problems can not be shared, so the power obtained can not be utilized as it should be. Recognized with the problems of electric power installation in the faculty of engineering I took the title oft thesis “Redesing Electric Power installation in the Rektorat Building Sam Ratulangi University”. From my research on electrical installation in the main buildings of Rektorat, found the division in the main building Rektorat not per floor erratic. Keywords : Development; Electric Power Installation; Rektorat building UNSRAT; Structuring.Abstrak—Masalah dalam instalasi tenaga listrik masih banyak ditemukan dilapangan, di gedung rektorat unsrat ditemukan masalah dalam pemasangan instalasi listrik yang dilakukan, antara lain masalah kerapihan jalur instalasi listrik, dan pengaturan pembagian beban di gedung Rektorat, masalah ini mengakitbatkan pembagian tiap fasa tidak seimbang sehingga daya yang didapat tidak dapat di manfaatkan sebagai mana mestinya. Berdasarkan dengan masalah instalasi tenaga listrik di Rektorat saya mengambil judul skripsi “ Redesain Instalasi Listrik Dikantor Pusat Universitas Sam Ratulangi”. Dari penelitian yang saya lakukan terhadap masalah instalasi listrik.Kata kunci— Gedung Rektorat  UNSRAT; Instalasi Tenaga Listrik; Penataan; Pengembangan.