Claim Missing Document
Check
Articles

Found 14 Documents
Search

Risk Assessment of Onshore Pipeline in Area Gresik Daniel Mohammad Rosyid; Muhammad Yusuf Jamil; Wahyudi Citrosiswoyo
International Journal of Offshore and Coastal Engineering Vol. 1 No. 1 (2017)
Publisher : Department of Ocean Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j2580-0914.v1i1.2872

Abstract

Pipeline is a transport means to distribute the fluid in the form of liquid or gas. Meanwhile, risk is defined as the combination of the likelihood of failure and the consequences of failure. In this reseĀ­arch, the implementation of risk assessment using the index or scoring models as developed by Muhlbauer is made. Pipeline used for the analysis was located in Legundi - Cerme, Gresik Area. The pipeline has a diameter of 12 inches which distribute gas. Scoring method is based on a sum index composed of damage indices caused by a third party with a score averagely 57.71, with a score of corrosion index averagely 68, index design with a score averagely 75, and the index operation errors with a score averagely 90. Furthermore, leak impact factor calculation is made by considering leak impact factor consisting of product hazard, leak volume, and dispersion, receptors. Estimates for product hazard criteria score is 7, leak or spill volume is 0.4, the dispersion score is 0.8,and score in receptor variation value of between 10.8 up to 15.9. Relative risk score average obtained from the calculation is 9.87, which is the result of dividing the sum by the leak index impact factor.This low value indicates the pipeline to be classified in the low risk level, or has a sufficiently high safety.
Risk Analysis on Leakage Failures of Pipelines Using Hybrid Risk Analysis Method Daniel Mohammad Rosyid; Bassam Muhammad Drehem; Agro Wisudawan
International Journal of Offshore and Coastal Engineering Vol. 1 No. 2 (2017)
Publisher : Department of Ocean Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j2580-0914.v1i2.7057

Abstract

In this final project has been conducted a study on risk analysis on subsea pipeline leakage by using hybrid risk analysis method. The study begins by determining the scope of the analysis using fault tree analysis which can be determined the main event of the leakage failure of subsea pipeline until the basic event. After determining the scope of the analysis then proceeded to calculate the frequency of each event using the quantitative method. In this calculation is known the frequency of basic event through data from scientific paper programming and scientific research and then calculated the frequency result of top event using Boolean Equation until we get the frequency of failure due to leakage pipelines for 0.0141213. After knowing how big the probability of failure, followed by determining how much impact or consequence of the failure. The consequences of failure are determined based on their impact on safety, environment, and business. In the determination of the impact with the qualitative method using questionnaires interviews to some respondents. After obtaining the result of questionnaire interview then calculated the mean of the questionnaire result to determine how big impact of the failure is based on safety, environment, and business. After knowing how big the probability and consequences of the failure, then determine the position of the risk zone on the risk matrix that refers to DNV RP-G101. After knowing the position of the risk zone, it can be determined how to control risk based on cause-effect.
Analysis of Inspection Scheduling on Free Spanning Subsea Pipeline Using Risk Based Inspection (RBI) Method Daniel Mohammad Rosyid; Yoyok Setyo Hadiwidodo; Abizar Giffari
International Journal of Offshore and Coastal Engineering Vol. 4 No. 1 (2020)
Publisher : Department of Ocean Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j2580-0914.v4i1.8703

Abstract

The subsea pipeline system of PT. X located at north of West Java transports natural gas with 19 kilometers long and 16 inches standard pipe size. The rough seabed causes free span problem. The system will be threatened by a structural failure of fatigue due to Vortex Induced Vibration (VIV) and local buckling as the effects of free span. In this Final Project, a total of 136 free spans on subsea pipeline system due to the uneven seabed are analyzed. The screening will be done for spans with length and diameter ratio more than 30 to figure out the free span which pass the screening and know the risk level of the subsea pipeline due to free span. The result for fatigue screening due to VIV, spans with a length more than 25 meters did not pass the screening. Local buckling occurred at the longest free span with a length of 62 meters. The level of risk to structural failure caused fatigue due to VIV has the highest level in terms of business and the environment, namely in the medium category. The level of risk to local buckling failures for safety, environmental, and business terms was in low category.
Risk Analysis of Decommissioning Process: Case Studies of Lima-Compresor Platform Daniel Mohammad Rosyid; Murdjito Murdjito; Arif Windiargo
International Journal of Offshore and Coastal Engineering Vol. 4 No. 1 (2020)
Publisher : Department of Ocean Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/j2580-0914.v4i1.8705

Abstract

The process of petroleum exploration and exploitation is a crucial activity in the fulfillment of energy needs in the world. The process of petroleum exploration and exploitation is currently centred on shallow water regions in the continental shelf. In the process of petroleum exploration and exploitation in shallow waters, the structure of which is commonly used is the jacket structure. In Southeast Asia there are about 1300 platforms, of which 80% is over 20 years old. When the platform has reached its operational limit, according to the ministerial regulation of ESDM number 1 year 2011 The platform must be decommissioning in accordance with existing technical standards. In the process of demolition, there are certainly risks and hazards that can interfere with the process of decommissioning. It is necessary to do a risk analysis to map the risks that can occur while preparing the mitigation steps. In this study, risk analysis arel conducted by determining the activity that has a significant degree of hazard where it is concluded that activities that have a significant risk level are activities related to construction, lifting, maintenance, well service, and maintenance. From each activity that has a significant hazard level, there was a process of determining the cause of risk using the Fault Tree Analysis (FTA) method while determining the barrier that serves to prevent a risk occurring. The next is to determine the impact that can be inflicted from risk by using the Event Tree Analyis (ETA) method while determining the barrier that serves to prevent and reduce the impact that occurs when there is a peril. These two FTA and ETA diagrams are combined to create a Bowtie diagram to explain in detail the risk management performed at each stage of the decommisiioning process.