Claim Missing Document
Check
Articles

Found 1 Documents
Search

Evaluation Study of Power Requirements Planning in Electrical Installations in the Construction of the Pagedangan Tangerang Overpass Bridge Akbar, Januar; Ramza, Harry; Machdi, Agustini Rodiah; Sofwan, Agus
TIME in Physics Vol. 2 No. 2 (2024): September
Publisher : Universitas Mandiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11594/timeinphys.2024.v2i2p111-117

Abstract

The Pagedangan Tangerang Overpass Bridge is one of the transportation infrastructure in the Tangerang area. The installed electrical loads include lighting loads (lamps) and power loads (which of course require a fairly large electrical power supply. The electrical power installed on the Pagedangan Overpass Bridge is 20,300 W. The power supplied from PLN is 33,000 VA from PLN and the total power capacity of the transformer is 37,500 VA. The results of the drop voltage analysis calculation for the PJU lighting load are 5,530 VA. For the analysis results of the drop voltage of 2.00 V, the voltage drop percentage is 0.42% and the conductor power loss is 12.12 W, the power loss percentage is 0.27%.