Ery Prasetyo Hadi Winoto
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

KAJIAN PEMASANGAN GIRDER JEMBATAN TOL PORONG – GEMPOL TERHADAP PENYIMPANGAN NILAI REAKSI DAN JARAK ANTAR GIRDER SESUAI BROSUR PT.WIKA Ery Prasetyo Hadi Winoto; Pujo Priyono; Totok Dwi K
HEXAGON Vol 4, No 2 (2019): HEXAGON
Publisher : Universitas Muhammadiyah Jember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32528/hgn.v4i2.3566

Abstract

The existence of toll roads cannot be separated from the emergence of a need so that road public facility providers have become economically valuable. The prestressed girders built on the Porong - Gempol toll bridge are in fact quite effective because in addition to concrete it can bear a bigger load than before and can reduce its own weight and cross-sectional size. In the next case, the girder of the Porong-Gempol Toll Road is greater than CTC which is contained in the brochure of the company itself