Claim Missing Document
Check
Articles

Found 2 Documents
Search

Akibat Hukum Perjanjian Restrukturisasi Kredit Mobil Pada Masa Covid 19 (Studi Pada PT. Adira Dinamika Multi Finance Tbk., Cabang Bengkulu 2 Car) Muhammad Rizky
Iuris Studia: Jurnal Kajian Hukum Vol 2, No 3 (2021): Oktober 2021 - Januari 2022
Publisher : Iuris Studia: Jurnal Kajian Hukum

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55357/is.v2i3.175

Abstract

The COVID-19 pandemic that occurred in Indonesia not only caused infectious diseases that caused many deaths, but also resulted in congestion in the wheels of the people's and country's economy. This research is normative and descriptive analysis. The data collection technique is library research (library research). Data analysis is qualitative. The results of the discussion in this study are the government's appeal and this has been regulated in OJK Regulation No. 14/POJK.05/2020 concerning Countercyclical Policy on the Impact of the 2019 Coronavirus Disease Spread for Non-Bank Financial Services Institutions. The form of restructuring policy carried out by PT Adira Dinamika Multi Finance Tbk Bengkulu 2 Car Branch to debtors is listed in Temporary Decree No.KS-020C/RISKLGL/COLL/V/2021 issued by Adira Finance. PT Adira Dinamika Multifinance Tbk Bengkulu 2 Car Branch carried out a consumer financing restructuring program due to the pandemic factor which resulted in the community's economy declining and experiencing significant changes in income
Analisis Optimasi Penjadwalan dengan Metode Precedence Diagram Method pada Proyek Konstruksi Pembangunan Rumah Sakit Regina Maris Medan Muhammad Rizky; Ahmad Perwira Mulia Tarigan; Gina Cynthia R Hasibuan
Jurnal Syntax Admiration Vol. 5 No. 1 (2024): Jurnal Syntax Admiration
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46799/jsa.v5i1.981

Abstract

Good project management in the process of implementing private residential buildings, private buildings, and infrastructure buildings intended for the public interest, is one of the factors for the progress of a country. The study focused on the construction of the Regina Maris hospital in Medan, which is one of the developments in the complex category. The purpose of this study is to provide the results of an analysis of the development in order to achieve goals or targets that can provide efficient use of time, cost and quality which are considered to be the main supporting factors in a development.The research was carried out with three main activity stages, namely the identification stage, the data compilation stage and problem analysis and the use of the Precedence Diagram Method (PDM) method to analyze the optimization of work implementation schedules. The identification stage was carried out in the study area, beginning with observing the condition of the construction implementation, and deepening the identification of environmental conditions or internal/external factors that could hinder work. The results of the identification stage, accompanied by identification of problems and factors that can hinder work, are then used as initial data from the preparation stage of optimizing work implementation schedules using the Precedence Diagram Method