Analisa Perhitungan Pembangkit Listrik Tenaga Surya (PLTS) untuk Homestay di Negeri Rutong, Kota Ambon Wattimena, Sefnath J.; Tupalessy, Johanis; Pellu, Deny Ismail; Mbitu, Elisabeth Tansiana; Salamoni, Thenny Daus
SAINTIFIK Vol 11 No 1 (2025): Saintifik: Jurnal Matematika, Sains, dan Pembelajarannya
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/saintifik.v11i1.584

Abstract

Pemanfaatan energi surya sebagai energi alternatif pengganti energi konevensional yang berasal dari fosil semakin berkembang. Hal ini terjadi karena terjadinya pertumbuhan penduduk yang diiringi dengan peningkatan konsumsi listrik. Pembangkit Listrik Tenaga Surya (PLTS) adalah sistem yang dapat menghasilkan listrik dengan menyerap matahari melalui konversi sel surya. Sistem ini memiliki keunggulan yakni ramah lingkungan dan tidak memerlukan biaya tambahan. PLTS terbagi menjadi dua sistem yakni sistem on grid dan off grid. Terkait dengan hal tersebut, PLTS off grid dapat diimplementasikan pada homestay di negeri Rutong, kota Ambon. Homestay ini adalah salah satu fasilitas bagi wisatawan yang berkunjung ke negeri Rutong. Permasalahan yang terjadi saat ini adalah suplai listrik hanya berasal dari listrik PLN. Ketika terjadi pemadaman maka peralatan listrik tidak dapat digunakan. Oleh karena itu, tujuan penelitian ini untuk menghitung sistem kelistrikan PLTS Off Grid untuk homestay di negeri Rutong agar nantinya dapat mengatasi permasalahan kelistrikan yang terjadi. Metode yang digunakan adalah metode kuantitatif dengan menggunakan sumber data pustaka dan hasil pengukuran. Berdasarkan hasil perhitungan diperoleh data sebagai berikut (1) Total daya beban per hari homestay negeri Rutong sebesar 2890 Wh; (2) Untuk memenuhi kebutuhan energi di homestay negeri Rutong diperlukan total panel surya sebanyak 8 panel, inverter sebanyak 1 (satu) unit dengan daya 3500 Watt, 2 (dua) unit baterai dengan tegangan 24 V dan arus 100 Ah; dan (3) Pada instalasi pemasangan panel surya digunakan konfigurasi 2 (dua) array dengan masing-masing 4 (empat) panel surya.
Integration of Website, RSS Feed, and Digital Signage to Support Public Information Relay Between Villages in Nusalaut District Salamoni, Thenny; Suatkab, Syukri Gazali; Tupalessy, Johanis; Ismail Pellu, Deny
International Journal of Science, Technology & Management Vol. 7 No. 1 (2026): January 2026
Publisher : Publisher Cv. Inara Colaboration with www.stie-sampit.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46729/ijstm.v7i1.1417

Abstract

The rapid development of information technology has significantly influenced how information is distributed and accessed by communities. However, many rural areas still rely on conventional information media such as bulletin boards and printed announcements, which are inefficient and difficult to update. This research aims to design and implement an integrated public information system using websites, RSS feeds, and digital signage in Nusalaut District, Central Maluku Regency, Indonesia. The study uses a Research and Development (R&D) approach consisting of requirement analysis, system design, implementation, and system testing. The developed system integrates multiple village websites with RSS feed technology and cloud-based digital signage using Raspberry Pi as the media player. The results show that three digital signage units were successfully implemented in Nusalaut District Office, Ameth Village, and Nalahia Village. In addition, seven village websites and one district portal website were developed to support information distribution. The integration of RSS feed technology allows real-time relay of information from the district portal to digital signage and village websites. The proposed system improves the efficiency, accessibility, and timeliness of public information dissemination in rural areas.
Peramalan Beban Listrik Kota Ambon Tahun 2016 – 2022 Kastanja, Arnold J; Tupalessy, Johanis
JURNAL SIMETRIK Vol 7 No 1 (2017): Jurnal Simetrik (Sipil, Mesin, Listrik)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v7i1.177

Abstract

Permintaan kebutuhan energi listrik di Kota Ambon cenderung terus meningkat karena peningkatan jumlahpenduduknya dan pertumbuhan ekonomi setiap tahunnya yang terus bertambah. Setiap sektor baik itu sektorresidensial, komersial, publik, maupun industri akan terus membutuhkan pertambahan pasokan energi listrik untukkelangsungan aktifitasnya. Sehubungan dengan permintaan (demand) energi listrik yang terus meningkat, PT. PLN(Persero) Wilayah Maluku sebagai pemegang kuasa usaha ketenagalistrikan berkewajiban untuk memenuhi setiappermintaan energi listrik yang ada. Pemenuhan kebutuhan energi listrik di kota Ambon saat ini dilakukan denganmemanfaatkan dua sistem yang saling terintekoneksi, yaitu PLTD Poka (RumahTiga) dengan kapasitas daya yangterpasang sebesar 53,6 MW dan mempunyai daya mampu sebesar 38,1 MW dan PLTD Hative Kecil (Galala) dengankapasitas daya terpasang sebesar 27,6 MW dan daya mampu sebesar 12,9 MW. Jadi keseluruhan kapasitas dayaterpasang di kota Ambon sebesar 81 MW dan daya mampu sebesar 50 MW. Dengan menggunakan metode AnalisisRegresi Linear untuk peramalan beban listrik Kota Ambon Tahun 2016-2022, Hasil prediksi yang dilakukan denganmenggunakan metode regresi tahun 2016 sampai tahun 2022 prosentase lebih kecil dari beban listrik aktual tahun2016 sebesar 48,503 MW.