Journal : JURNAL REKAYASA SISTEM INDUSTRI

PENENTUAN STOCK BAHAN BAKU GUNA MEMINIMALISIR BIAYA PENYIMPANAN DAN MENGURANGI KERUSAKAN PADA CV SARANA MITRA SUKSES Putra, Dheni Rahmat; Widiasih, Wiwin
JURNAL REKAYASA SISTEM INDUSTRI Vol 9 No 2 (2024): Mei 2024
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v9i2.8800

Abstract

This research is aimed at finding out the amount of security stock, estimated total cost of inventory, optimal ordering, and reorder point. This study uses quantitative methods and aims to provide proposals for inventory control using continuous review systems and forecast analysis, as well as to determine the root cause of the occurrence of damage to raw materials on CV. Sarana Mitra Sukses is located in Karangnongko, Sukodono, Sidoarjo. In order to obtain the cost of providing glass 102x137 (2 mm), we experienced savings of Rp 18.105.803 with 12 sheet safety stock and re-purchase of raw materials when the raw material remains 55 sheets. For the costs of supplying glass 122x86 (2 mm), we experienced a saving of Rp 17.796.105 with 13 sheet safety stock and re-purchase when the raw material remains 57 sheets. For the supply of glass 122×102 (2 mm), we suffered savings in the amount of Rp 14.265.057 with a safety stock of 15 sheet safety stock and re-purchase when the raw material remains 67 sheets. For the supply cost of glass 88x147 (2 mm), we experienced a reduction in the size of Rp 21.599.803 in the safety stock of 19 sheet safety stock and re-purchase when the raw material remains 87 sheets. For 244x183 (3mm) glass storage costs, there are savings of Rs. 26.150.792 with 13 sheet safety stock and re-purchase when the raw material remains 58 sheets. And for the 305x214 (5mm) glass storage cost, there is a savings amounting to Rs. 20.017.022 with 3 sheet safety stock and re-purchase when the raw material remains 13 sheets. It can be seen that the total cost of inventory using the Continuous Review System method is considered more economical and can also have safety stock reorder point.
PERENCANAAN PENJADWALAN PRODUKSI UNTUK MEMINIMALISIR KETERLAMBATAN PEMESANAN PADA PT XYZ Pitaloka, Dia Ardiana; Widiasih, Wiwin
JURNAL REKAYASA SISTEM INDUSTRI Vol 9 No 2 (2024): Mei 2024
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v9i2.8801

Abstract

PT XYZ is a company operating in the furniture sector which produces tables, chairs and cupboards. This company's ordering system is make to order, both export and local. The production process at this company consists of 7 production process flows including the CPP process, wood process, assembly, sanding, painting, checking, packing. The production process takes place using 20 different types of machines. The problem faced by the company is delays in fulfilling orders that do not comply with the deadline provisions. This problem is caused by inefficient production scheduling, therefore researchers analyze production scheduling using the Campbell Dudeck Smith, Palmer and Dannenbring methods and analyze the costs. However, before scheduling machines, it is necessary to test data uniformity, adequacy, normal time and standard time. The aim of these three methods is to find the minimum makespan value. From the results of these calculations, the minimum Makespan value obtained from the CDS and Dannenbring methods is 813.33 hours in the order GFABCED, GFACBED, GFACEBD, GFBCAED, GFCABED, GFCBAED. If you use the company's calculation method, the makespan value is 1026 hours with details of 840 working hours and 186 overtime hours. The CDS and Dannenbring methods in the order GFABCED, GFACBED, GFACEBD, GFBCAED, GFCABED, GFCBAED require labor costs of Rp. 141,520,058, whereas if you use the company method the labor costs are Rp. 150,253,734 required. If compared, the savings cost is IDR 8,733,676 per worker.