Claim Missing Document
Check
Articles

Found 3 Documents
Search

ANALISIS RENCANA ANGGARAN BIAYA PADA PENGGANTIAN JEMBATAN WAI-WEI KABUPATEN SERAM BAGIAN BARAT Remita Melinda Pesiwarissa; Vera Theresia Siahaya; Edison Hukom
JURNAL SIMETRIK Vol. 12 No. 1 (2022)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v12i1.1065

Abstract

Kinerja manajemen sangat di perlukan di Indonesia dengan semakin bertambah tingkat kesulitan dan kebutuhan perencanaan serta pelaksanaan proyek pembangunan . Perencanaan manajemen konstruksi perlu dilakukan dengan tepat dan efisien diawali dengan perencanaan desain, estimasi biaya merupakan Salah satu sisi pekerjaan pada manajemen konstruksi yaitu perhitungan rencana anggaran biaya (RAB), yaitu merupakan langkah suatu proses perhitungan biaya estimasi kebutuhan material, bahan alat dan tenaga kerja yang dibutuhkan berdasarkan gambar kerja dan spesifikasi teknis dengan di syaratkan dalam rencana kerja Proyek jembatan wai – wei memiliki fungsi yang strategis dari segi ekonomis akan sangat menunjang kegiatan masyarakat luas khususnya di daerah mornateng-taniwel , secara structural juga akan sangat menarik untuk diteliti dalam pelaksanaan dan secara anggaran perencanaan serta dengan bentang jembatan sepanjang 60m.
ANALISIS PARKIR KENDARAAN RODA EMPAT PADA RUAS JALAN A.Y. PATTY DI KOTA AMBON Rally Victor Salhuteru; Anthoneta Maitimu; Edison Hukom
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1408

Abstract

On the A. Y. Patty road the length of the road is ± 425 meters, the width of the road is 8.75 meters and the road median is 1.9 meters. For this road, the availability of insufficient parking space makes road users misuse road sections that should not be used as parking lots. This is caused by misuse of land use because there are many along this road. So it is necessary to examine the analysis to detemine the performance of traffic and parking space available for four-wheelend vehicles. What are the characteristics of the parking space and the capacity of the available parking spaces on the A. Y. Patty road in Ambon City, which are still sufficient to accommodate four-wheeled vehicles? The method used is the direct approach method, where the calculation of parking space capacity is by calculating directly used for parking SRP Passenger cars score I. The highest parking volume was on Monday 12 September 2022 as many as 639 vehicles with the highest accumulation of 78 vehicles. The capacity of the parking space for 78 vehicles is 969,54 which is smaller than the available land which is 1.305,158, which means it still fulfills or accommodates parked vehicles.  
ANALISA PENATAAN PARKIR KENDARAAN RODA 4 DAN RODA 2 TERHADAP KAPASITAS RUANG PARKIR PADA RUAS JALAN DIPONEGORO KOTA AMBON Christo Balriyanan; Anthoneta Maitimu; Edison Hukom
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1422

Abstract

Parking is a state of immobile vehicles that are temporary. Circulation is the movement of poepole or objects that are neede to k through a site, Diponegoro street Ambon City, whose road length is 700 meters , is filled with parking vichles , 4-wheeled and 2-wheeled. On this street, there are also many shooping  facilities and banks. In fact because as vehicles increase in front of the self-service planet 2000 in the afternoon until late evening the volume of perfomance of the traffic and available parking lots and anticipate the growth of vehcles that are increasing year. What are the characteristics of parking spaces on Diponegoro road sections in Ambon City and is the available parking space capacity on Diponegoro road sections still sufficient to accommodate 2-wheeled and 4-wheeled vehicle