Analisis Waktu dan Biaya Menggunakan Metode Time Cost Trade Off Rehabilitasi Gedung Kantor Inspektorat Daerah Kabupaten Tuban Susilo Susilo; Hammam Rofiqi Agustapraja; Samsul Arif
Jurnal Talenta Sipil Vol 9, No 1 (2026): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i1.1043

Abstract

Delays in construction projects often lead to cost increases, reduced quality, and even the risk of penalties. This was the case in the Rehabilitation Project of the Regional Inspectorate Office Building of Tuban Regency, which experienced a 4.735% progress deviation in the 14th week. Such delays could affect the overall completion and increase project costs. This research aims to analyze the relationship between project time and cost using the Time Cost Trade Off method to find an efficient way to speed up the project. The study was carried out by collecting field data, analyzing the S-curve, identifying the critical path with the Critical Path Method , and simulating different overtime scenarios. From the three overtime options tested, adding 3 extra hours per day turned out to be the most effective choice. This scenario successfully shortened the project duration and achieved a 0.207% cost efficiency without causing significant changes to the work structure. This means that the application of the Time Cost Trade Off method is effective in optimizing resources, reducing the negative impact of delays, and maintaining a balance between time and cost in similar construction projects
Kelayakan Investasi pada Pengembangan Perumahan Permata Regency Lamongan Cahyo Indra Irawan; Hammam Rofiqi Agustapraja; Samsul Arif
Jurnal Teknik Vol 24 No 1 (2026): Jurnal Teknik
Publisher : Universitas Negeri Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37031/jt.v24i1.483

Abstract

The growth in housing demand drives residential development, including Permata Regency Lamongan Housing, which faces location constraints in suburban areas and high investment costs. This study aims to analyze investment feasibility using Net Present Value (NPV), Internal Rate of Return (IRR), and Benefit-Cost Ratio (BCR) methods, as well as to determine the influence of location on consumer purchasing decisions. The study employs a quantitative approach utilizing primary data from questionnaires distributed to 33 respondents and secondary data from project documents. Analysis was conducted using NPV, IRR, BCR, simple linear regression, and t-tests. The financial analysis results indicate a contradiction in the 1-year period; while the IRR of 7.59% exceeds the 6% MARR, the NPV of -IDR 483,410,632 and a BCR of 0.85 indicate that the project is not yet feasible in the short term. Therefore, feasibility decision-making must be evaluated over the medium term; within a minimum 2-year projection, the investment demonstrates fulfillment of all feasibility criteria with a positive NPV of IDR 1,995,928,211. Additionally, location has a positive and significant effect on purchasing decisions, with a calculated $t_{\text{value}}$ of 9.52 > $t_{\text{table}}$ of 2.03951 and a coefficient of determination of 74.52%. Consequently, the investment is declared comprehensively feasible in the medium term, and the location factor serves as a vital determinant in enhancing consumer purchasing decisions.
Structural Analysis of The UMY Admissions Building Vertical Expansion Using Special Moment Resisting Frames Hendro Susilo; Nur Huda; Iin Ernawati Ernawati; Linda Fatikha Wulandari; Muhammad Koderi H.W.; Muhammad Gunawan Perdana; Samsul Arif; Zahira Afsahinniswah; Fatchur Roehman; Satrio Adi Wahyu Nugroho; Alfin Sahila
Jurnal Civil Engineering Study Vol. 6 No. 02 (2026): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Admission Building of Universitas Muhammadiyah Yogyakarta is a three-story structure developed into four stories due to increasing space demands. This vertical expansion increases gravity and lateral loads, necessitating a superstructure redesign to ensure structural safety. The design complies with SNI 1729:2020 (steel), SNI 2847:2019 (concrete), SNI 1727:2020 (loading), and SNI 1726:2019 (seismic). Structural analysis via SAP2000 v22 utilized 25 MPa concrete, BJ 37 steel, and 400 MPa deformed reinforcement. Results indicate the roof structure employs IWF 300.150.6,5.9 mm, HWF 400.200.8.13 mm, and regel 250.125.6.9 steel trusses with CNP 150.75.20.4,5 mm purlins. Floor slabs are designed with a thickness of 130 mm, standard roof slabs at 100 mm, and water tank slabs at 150 mm. The building implements a Special Moment Resisting Frame (SMRF) system. The main beam (B1) dimension is 300×700 mm, while main columns utilize 600×600 mm (K1) and 400×600 mm (K2) sections. All analytical outcomes demonstrate that the proposed superstructure satisfies the strength, ductile stiffness, and functional stability criteria in accordance with applicable standards.