Herby Calvin Pascal Tiyouw
Universitas Kristen Indonesia Paulus

Published : 8 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 8 Documents
Search

Analisis Produktivitas Tenaga Kerja Pemasangan Ubin Keramik Pada Proyek Makassar New Port Acen Patanduk; Josefine Ernestine Latupeirissa; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol 3 No 2 (2021): Paulus Civil Engineering Journal Volume 3, Nomor 2, Juni, 2021
Publisher : Program Studi Teknik Sipil UKI Paulus-Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (225.269 KB) | DOI: 10.52722/pcej.v3i2.246

Abstract

The aim of this study is to investigate the productivity capacity of the ceramic tile installation workforce at the Makassar New Port project, based on field data and the Indonesian National Standard (SNI). This research was conducted for ± 10 days in the Makassar New Port project. The objects to be studied as a source of data in this research are workmen who work on ceramic tile installation, regarding the factors that affect the performance of human resources in the field, especially on their work skills, speed, and accuracy. The observations were made per square meter of ceramic tile installation for each work item on 1 working day, while data recording was carried out per day for 6 working days. The research method used in this research is the work study method, which is a research conducted by collecting data directly from observations in the field. This research was conducted by collecting primary data which is directly examined in the field related to the research carried out as secondary data, which is called the work study method because the observational data is taken while conducting the field work. The result of this research is that the production capacity in the ceramic tile installation of the Makassar New Port project is bigger than the Indonesian National Standard (SNI), this shows that the hired workmen in the work of the retaining stone installation work is very productive.
Analisis Produktivitas Alat Hydraulic Static Pile Driver Pada Pembangunan Delft Apartemen Makassar Dewo Mangiri; Junus Mara; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol 4 No 1 (2022): Volume 4 No.1, Maret 2022
Publisher : Program Studi Teknik Sipil UKI Paulus-Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (191.291 KB) | DOI: 10.52722/pcej.v4i1.379

Abstract

This study aims to find out productivity Hydraulic Static Pile Driver (HSPD) tool in Delft Apartment construction project and also to find out the impact of productivity pilling tool Hydraulic Static Pile Driver on the duration of pilling activities in the Delft Apartement construction project. This study was conducted by direct observation method on project area to get data depth of pilling and duration of work. Then analyzed to get productivity value on Hydraulic Static Pile Driver. The result of this study is the productivity resulting from pilling with Hydraulic Static Pile Driver 15,732 m/hour and the highest productivity value is 21,631 m/hour and the lowest productivity value is 14,933 m/hour. Productivity of Hydraulic Static Pile Driver tool is very impactful to the duration of work pilling. The higher the production value, the shorter the pilling duration, conversely the lower the production value, the longer the pilling duration.
Analisis Faktor Penyebab Keterlambatan Pelaksanaan Proyek Pembangunan Gedung Apartemen 31 Sudirman Suites Makassar Sonaigh Bano Ongan; Josefine Ernestine Latupeirissa; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol 4 No 2 (2022): Paulus Civil Engineering Journal Volume 4 No.2
Publisher : Program Studi Teknik Sipil UKI Paulus-Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (457.086 KB) | DOI: 10.52722/pcej.v4i2.447

Abstract

Problems occur in construction projects that arise from inconsistencies in plans that have been made with actual facts, so that the impact that often occurs is a matter of project implementation time. The construction project of the 31 Sudirman Suites Apartment Building, located in the city of Makassar, South Sulawesi, will be underway starting March 24, 2020 and the contract completion plan is July 2021 with an initial schedule of 16 months. In the process of structural work has occurred, the project (project schedule delay) is approximately 10 months drawn from July 2020 to April 2021, where the final condition at the review stage of the S-curve data is known that the planned development (planned progress) is 82.695% of the actual progress (actual progress) of 47.449% so there was a project incidence of 35.246%, namely the difference between the actual / realization time schedule and the initial plan. This study aims to determine the factors causing the implementation of the 31 Sudirman Suites Makassar Apartment building project. The method used in this research is by means of a questionnaire to the relevant agencies as many as 20 responsibilities. Data analysis used descriptive statistics, validation and reliability tests, Relative Rank Index (RRI). From the research results, the dominant factor that caused the implementation of the 31 Sudirman Suites Apartment Building construction project was unexpected events (force majeure), such as the corona virus pandemic (COVID 19) with an RRI value of 0.892.
Analisis Risiko Dalam Sistem Rantai Pasok Pada Proyek Upgrade Trans Studio Mall Makassar Anggun L. Sandangan; Josefine Ernestine Latupeirissa; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol 4 No 2 (2022): Paulus Civil Engineering Journal Volume 4 No.2
Publisher : Program Studi Teknik Sipil UKI Paulus-Makassar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (403.916 KB) | DOI: 10.52722/pcej.v4i2.453

Abstract

The supply chain system is the relationship between the parties from the vertical structure to the horizontal structure in the system of a project being implemented. In the supply chain system, there may be uncertainties that pose risks. Construction project risk management needs to be implemented in the supply chain system to determine the success and objectives of project procurement. Thus, the purpose of this research is to determine the risks that occur in the supply chain system in the Makassar Trans Studio Mall upgrade project. Data collection was carried out by direct observation in the field, interviews, and distributing questionnaires to be filled out by the parties to the project according to their respective work experiences. Respondents amounted to 13 people. Data analysis for this study used the Likert scale method using the severity index (SI) formula. From the results of this study after collecting data, it can be concluded that there are 22 risk factors identified. These risks occur with various types of risks, namely 2 risks that are categorized as high, 19 risks that are categorized as moderate, and 1 risk that is categorized as low.
Identifikasi Risiko yang Berpengaruh Pada Kinerja Waktu Pelaksanaan Konstrusi Apartemen Bandaraya Anugrah Mangaruk; Josefine Ernestine Latupeirissa; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol. 7 No. 1 (2025): PCEJ Vol.7, No.1, Maret 2025
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/zeye5650

Abstract

Proyek konstruksi selalu dikaitkan dengan bahaya atau rintangan selama fase konstruksi di era globalisasi saat ini. Tujuan dari penelitian ini adalah untuk menentukan faktor risiko yang berdampak pada seberapa cepat Apartemen Bandara FKS Makassar akan dibangun. Penelitian ini dilakukan selama 20 hari pada proyek pembangunan Apartemen    Bandaraya FKS Makassar. Analisis kinerja waktu yang dilakukan pada proyek Apartement Bandaraya. menunjukan bahwa telah terjadi keterlambatan pelaksanaan pada pengecoran pelat lantai 5 proyek dibanding pelaksanaan rencana  proyek. kesimpulan dari hasil penelitian yaitu Faktor risiko tingkat tinggi membutuhkan respon yang cepat, antara lain penyelesaian pekerjaan yang memakan waktu lebih lama dari perkiraan, menggunakan informasi prakiraan cuaca BMKG, dan mengambil tindakan preventif jika terjadi perubahan cuaca.
Analisis Pengaruh Penggunaan Metode BIM Terhadap Perencanaan Bangunan Konstruksi pada Renovasi Gereja XXX Aldi O. Resa Makkan; Helen Adry Irene Sopacua; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol. 7 No. 1 (2025): PCEJ Vol.7, No.1, Maret 2025
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/gqn92816

Abstract

Penelitian ini dilatarbelakangi dengan konstruksi, yang dimana penggunaan Building Information Modeling (BIM) menawarkan potensi untuk meningkatkan efisiensi, mengurangi kesalahan, dan mempercepat proses pembangunan. Namun, tantangan seperti kurangnya sumber daya manusia terampil dalam BIM dan pemahaman terbatas tentang manfaatnya perlu diatasi melalui pelatihan. Penelitian ini bertujuan mengevaluasi pengaruh penerapan BIM dalam proyek renovasi Gereja XXX di Jalan Gunung Latimojong, yang menunjukkan bahwa BIM dapat mempercepat perencanaan dan mengurangi kesalahan di lapangan. Penelitian ini menggunakan metode kuantitatif dan kualitatif, dikumpulkan dengan membagikan kuesioner. Dengan Data dari uji validitas, reliabilitas, dan regresi linear berganda menunjukkan bahwa pelatihan dan implementasi BIM secara signifikan mempengaruhi perencanaan konstruksi. Dengan nilai F hitung yang lebih besar dari F tabel dan tingkat signifikansi di bawah 0,05, penelitian ini menunjukan bahwa perencanaan dengan penggunaan metode BIM berpengaruh positif pada efisiensi perencanaan. BIM meningkatkan kolaborasi tim, deteksi kesalahan lebih awal, serta integrasi data proyek, yang pada tujuannya mengurangi biaya dan meningkatkan efisiensi keseluruhan dalam renovasi Gereja XXX.
Penerapan Sistem Manajemen Iso 9001:2015 Pada Proyek Pembangunan Gedung Parkir Mall Panakkukang Hendrika Benyamin; Helen Adry Irene Sopacua; Herby Calvin Pascal Tiyouw
Paulus Civil Engineering Journal Vol. 7 No. 2 (2025): Paulus Civil Engineering Journal V7N2 2025
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/a72m8109

Abstract

This study examines the implementation of ISO 9001:2015 in quality management for the construction project of the Panakkukang Mall parking building. The primary objective of this research is to evaluate the effectiveness of applying this quality management standard in enhancing project quality and customer satisfaction. The method used is a descriptive approach, with data collected through observation, interviews, and documentation. The findings indicate that the implementation of ISO 9001:2015 significantly contributes to improvements in managerial processes, quality control, and communication among all parties involved in the project. The involvement of all team members in applying this standard has also proven to enhance their understanding, awareness of responsibilities, and the quality of their work. However, challenges remain in implementation, such as staff training and the provision of adequate resources. This study aims to provide recommendations to developers and contractors to further optimize the application of quality management systems for achieving better outcomes in future construction projects.
Analisis Produktivtas Alat Berat Pada Proyek Pembangunan Jalan Akses dan Fasilitas Pendukung Stasiun Maros Herby Calvin Pascal Tiyouw; Helen Adry Irene Sopacua; Alvone Feldian Sampe Kondoallo
Paulus Civil Engineering Journal Vol. 7 No. 4 (2025): Paulus Civil Engineering Journal, Vol.7, No.4
Publisher : Universitas Kristen Indonesia Paulus

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52722/p6c92381

Abstract

Road construction as  access and connection to an area is beneficial, among other things,  to facilitate the mobilization of goods and services, improve the economy and connectivity between regions. The Maros district government is constructing a new road to connect Maros Train Station with the main road, with a length of 2.5 km. The work carried out is land leveling. This work uses heavy equipment to achieve high productivity so that the work can be completed on time, on budget, and with high quality. Four units of construction equipment were used according to their functions, including dump trucks to transport material from the quarry to the project site, excavators to spread the material, bulldozers to level it, and vibration rollers to compact it. Research was conducted to determine the productivity of each tool according to its function and characteristics.  The results of the research on the productivity of each tool showed that the productivity of the dump truck was 14.78 m3/hour, the excavator was 337.62 m3/hour, the bulldozer was 91.12 m3/hour, and the vibration roller was 110.67 m3/hour.