ANALISIS PERBANDINGAN BIAYA PELAKSANAAN PEKERJAAN BALOK METODE KONVENSIONAL DAN PRECAST PADA PROYEK ASPENA RESIDENCE BATUCEPER Brian Alvandi; Ria Rosyati; Muhamad Abdu
Structure Vol 3, No 1 (2021): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2047.827 KB) | DOI: 10.31000/civil.v3i1.7156

Abstract

Proyek kontruksi adalah salah satu satu sektor terkuat yang mendukung pertumbuhan ekonomi di Indonesia, Indonesia sebagai negara berkembang pun gencar melakukan aktivitas pembangunan disegala bidang seperti pembangunan infrastruktur, gedung bertingkat, perumahan untuk pemukiman warga, gelanggang olahraga bertaraf internasional, bahkan lokasi baru untuk lokasi rencana perpindahan ibukota baru, maupun bangunan penyangga kebutuhan lainnya. Dalam proses implementasi pembangunan setiap proyek berbeda sesuai dengan kondisi alam maupun kondisi sosial, untuk pembangunan gedung bertingkat dalam pelaksanaannya ada dua metode fabrikasi balok yaitu metode konvensional dan metode pracetak/precast yang dimana dua metode tersebut mempengaruhi anggaran biaya dan waktu pelaksanaan proyek. Perbandingan biaya disini dilakukan untuk mengetahui selisih antra kedua metode tersebut dan dapat menyimpulkan efektivitas salah satu metode tersebut, serta kekurangan maupun kekurangan kedua metode dalam proyek apartemen Aspena residence Batuceper. Pada penelitian kali ini dilakukan perbandingan antara metode konvensional dan metode pracetak untuk menentukan perbandingan biaya fabrikasi balok dalam proyek apartemen Aspena residence Batuceper.Kata kunci:  Balok Precast, Balok Konvensional, Perbandingan Biaya
KAJIAN TERHADAP HUBUNGAN ANTARA PENGELOLAAN SISA MATERIAL DENGAN BIAYA DAN WAKTU PENYELESAIAN PROYEK KONSTRUKSI Sugeng Purwanto; Ria Rosyati; Sudrajat Sudrajat
Structure Vol 2, No 1 (2020): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (944.076 KB) | DOI: 10.31000/civil.v2i1.6990

Abstract

Pada suatu proses pelaksanaan proyek konstruksi bangunan, tidak bisa dihindari adanya sisa material konstruksi atau biasa disebut dengan Construction Waste.Pada proyek konstruksi sisa material merupakan salah satu masalah yang pasti ada dan butuh perhatian khusus. Jenis sisa - sisa material yang ada di proyek konstruksi berdasarkan tiap kategori pekerjaan menghasilkan kuantitas sisa material yang berbeda, dan juga pengelolaan terhadap sisa material yang berbeda. Oleh sebab itu untuk mengetahui prosentase kuantitas sisa material dan untuk mengetahui sisa material apa saja pada proyek konstruksi, pengelolaan sisa material dan pengaruh pengelolaan sisa material terhadap biaya dan waktu penyelesaian proyek, harus dilakukan penelitian mengenai persepsi pelaku konstruksi pada proyek konstruksi. Metode pelaksanaan penelitian yaitu dengan tinjauan pustaka yang bersumber pada jurnal, buku dan media internet, sedangkan metode pengumpulan data dengan cara pengumpulan hasi] kuesioner yang ditujukan kepada pelaku konstruksi seperti Project Manager, Site Manager, Site Engineer, Supervisor, Pelaksana Lapangan dan Pengawas Lapangan. Data hasil kuisoner yang telahdianilisis disajikan dalam bentuk table dan grafik, sedangkan analisa data perhitungannya menggunakan prosentase, mean, SD, validitas, realiabilitas, dan korelasi untuk mengetahui adanya hubungan antara pengelolaan sisa material terhadap biaya dan waktu penyelesaian proyek kontruksi.Kata kunci: Sisa material, Pengelolaan sisa material, Hubungan, Waktu dan Biaya Penyelesaian Proyek kontruksi
PRODUKTIVITAS TENAGA KERJA TERHADAP BIAYA DAN WAKTU PELAKSANAAN PADA PEMBANGUNAN RUKO 2 LANTAI Siti Abadiyah; Ria Rosyati; Qori Nurjanah
Structure Vol 3, No 2 (2021): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (564.482 KB) | DOI: 10.31000/civil.v3i2.7165

Abstract

Productivity is the quantity of work a workforce achieves per day. The amount of productivity can be seen from the large quantity of work divided by the time it takes for labor to complete the job. One of the factors that influence the amount of work productivity is the number of workers. One of the factors affecting the amount of work productivity is the number of workers, however the number of workers per day needs to be limited based on the quantity of work and the cost of the project work. Therefore, it is necessary to know the estimated cost of work from the number of workers working on a job. Estimates of work costs are known from the number of workers and the wages of workers per day. From the research results, it is known that the cost of the productivity of the structure construction spent Rp. 223,492,785.00.Keywords: Productivity, labor, time and cost.
EFEKTIVITAS JARINGAN IRIGASI DI DESA GUNUNG SARI KABUPATEN TANGERANG Siti Abadiyah; ria Rosyati; MURTADO MURTADO
Structure Vol 1, No 2 (2019): Structure (Jurnal Sipil)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3710.043 KB) | DOI: 10.31000/civil.v1i2.6932

Abstract

Untuk masa tanam padi-padi per tahun jaringan irigasi di Desa Gunung Sari membutuhkan debit air yang cukup besar guna memenuhi kebutuhan air di persawahan demi menjaga kualitas tanaman padi agar tetap stabil dari masa tanam hingga masa panen. Untuk masa tanam tahap pertama (MT 1) yang jatuh pada bulan Oktober – Maret dengan intensitas tanam 100% dari luas area sawah yang ada + 284 Ha. Pada musim garap periode MT 1 membutuhkan pasokan air sebanyak 250-260 l/dt guna mencukupi kebutuhan pengolahan lahan, sedangkan pada musim panen periode MT 1 kebutuhan pasokan air lebih sedikit dari musim garap yaitu 150 – 175 l/dt. Pada masa tanam periode dua ( MT 2 ) yang jatuh pada bulan April – September dengan intesitas tanam 60% dengan luas area + 170 Ha. Pada musim garap MT 2 membutuhkan pasokan air sebanyak 120 l/dt, sedangkan pada musim panen membutuhkan pasokan air sebanyak 80 l/dt. Pengaturan alokasi air untuk masa tanam dua ( MT 2 ) yang berasal dari pintu bagi BM 4 ( Desa Sasak ) dialirkan melalui saluran sekunder BRKL 2 yang mengatur pasokan air agar sesuai dengan kebutuhan area seluas 60% atau 170 Ha.Kata kunci: Imbangan Air (Neraca Air), Kebutuhan Air, Pembagian, Pengembangan Air.
EVALUASI PROYEK MENGGUNAKAN METODE EARNED VALUE ANALYSIS STUDI KASUIS PADA PROYEK PEMBANGUNAN TAMBAH RUANG KELAS SMPN 17 TANGERANG SELATAN Ria Rosyati; Jeri Sudarmanta
Structure Vol 2, No 2 (2020): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (936.59 KB) | DOI: 10.31000/civil.v2i2.7000

Abstract

Pengendalian  waktu yang baik  dapat membantu  pelaksanaan  proyek  agar dapat mencapai  waktu  yang direncanakan.  Salah satu cara untuk pengendalian  waktu yang baik adalah dengan menggunakan  metode Earned  Value Analysis. Digunakanya Earned  Value Analysis   bertujuan agar dapat memperkirakan  sejauh mana proyek  dilaksanakan  sesuai  dengan  rencana  kerja.  Tujuan  dari penelitian adalah   untuk   mengetahui   bagaimana   cara   penerapan   EVA   (Earned   Value Analysis)  dalam memperkirakan  waktu  akhir penyelesaian  proyek  pada minggu ke-4.  Dalam  penelitian  ini  menggunakan  metode  deskriptif  kualitatif    dengan durasi  pengerjaan  proyek  selama  20 minggu.  Pada  penelitian  ini  mendapatkan hasil, waktu penyelesaian  proyek yang tidak sesuai dengan rencana awal jadwal proyek.  Pada minggu ke -4 proyek mengalami  keterlambatan  dari rencana  awal proyek apabila proyek tidak melakukan evaluasi, proyek akan mengalami keterlambatan selama 413 hari dari rencana awal proyek yang hanya 140 hari.Kata kunci :   pengendalian waktu ,  Earned Value Analysis