PENERAPAN LINE OF BALANCE DENGAN TARGET WAKTU PENYELESAIAN PROYEK UNTUK OPTIMASI PENJADWALAN PROYEK RUMAH TINGGAL Sean Adrian Lythio; Onnyxiforus Gondokusumo
JMTS: Jurnal Mitra Teknik Sipil Volume 5, Nomor 4, November 2022
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v5i4.20607

Abstract

Scheduling is one of the most important and determines the success of a project, including construction projects that are repetitive. Choosing the right scheduling method based on project characteristic can increase the efficiency of the project itself, both in terms of cost and time. This study will examine the application of the optimization of Line of Balance (LoB) scheduling using the deadline completion target. This optimization is applied with the concept of linear programming, by entering some several linear constraints, such as start time in the first and last unit, deadlines completion target, and using the linear objective function to minimizing the crew employment cost for each activity, such that the crews and workers employed can be minimize. This study use a housing project in East Jakarta with a total of 10 housing units. The result of this optimization shows that a total of 37 crews and 164 workers were employed for this project. Those result are smaller than the existing method have done, which was 39 crews and 172 workers were employed for this project. The results show that using the objective function to minimizing the crew employment cost can reduce the amount of crews and workers employed. Abstrak Penjadwalan merupakan salah satu hal yang sangat penting dan menentukan keberhasilan suatu proyek, termasuk proyek konstruksi yang bersifat berulang (repetitif). Pemilihan metode penjadwalan yang sesuai dengan sifat dari suatu proyek dapat menambah efisiensi dari suatu proyek, baik itu dari segi biaya dan waktu. Penelitian ini akan mengkaji penerapan optimasi penjadwalan Line of Balance (LoB) dengan target waktu penyelesaian proyek. Optimasi ini diterapkan dengan konsep pemrograman linier, yaitu dengan cara memasukkan beberapa batasan linier, seperti hubungan keterkaitan antara waktu mulai untuk unit pertama dan terakhir, target waktu penyelesaian proyek, dan menggunakan fungsi objektif linier untuk memperkecil jumlah biaya yang dikeluarkan untuk setiap kegiatan, sehingga jumlah crew dan pekerja yang dipekerjakan dapat menjadi lebih sedikit. Penelitian ini menggunakan proyek rumah tinggal di Jakarta Timur untuk dijadikan objek penelitian dengan jumlah unit sebanyak 10 unit rumah. Hasil dari optimasi ini menunjukkan sebanyak 37 crew dan 164 pekerja dapat dipekerjakan. Hasil tersebut lebih sedikit jika menggunakan metode optimasi yang telah ada sebelumnya, yaitu sebanyak 39 crew dan 172 pekerja dapat dipekerjakan. Hal ini membuktikan bahwa dengan menggunakan fungsi objektif memperkecil jumlah biaya dapat mengurangi jumlah crew serta pekerja yang dipekerjakan.
MERUBAH RANGKAIAN KEGIATAN PARALEL MENJADI BERURUTAN DENGAN METODE ALOKASI SUMBER DAYA YANG TERBATAS Jason Felix; Onnyxiforus Gondokusumo
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 1, Februari 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Project work requires scheduling as a reference in the process. Scheduling has work carried out in parallel to shorten project work time, but sometimes parallel work can experience a shortage of resources, so that it can affect the duration of the project. One way to deal with this problem is by using the Resources-Constraint Project Scheduling Problem and Generalized Precedence Relations methods with the concept of Resource Allocation. The resource allocation method helps in converting parallel work into sequences with minimum increase in project duration, and also with limited resources. The results obtained after using the method listed, the most optimal addition of time due to this method is 14 days and with this additional time there is an equal distribution of resources in the 3rd to 9th week of the raft work on the Tokyo RiverSide. The final duration of project completion went from 71 days to 84 days, with a more stable histogram of workers adding workers. ABSTRAK Pekerjaan proyek membutuhkan penjadwalan sebagai acuan dalam pengerjaannya. Penjadwalan memiliki pekerjaan yang dilakukan secara paralel untuk mempersingkat waktu pekerjaan proyek, namun terkadang pekerjaan paralel dapat mengalami kekurangan sumber daya, sehingga dapat berpengaruh kepada durasi proyek. Salah satu cara untuk menghadapi permasalahan ini dengan penggunaan metode Resources-Constraint Project Scheduling Problem dan Generalized Precedence Relations dengan konsep Alokasi Sumber Daya. Metode alokasi sumber daya membantu dalam mengubah pekerjaan paralel menjadi berurutan dengan penambahan durasi proyek secara minimum, dan juga dengan sumber daya yang terbatas. Hasil yang didapat setelah menggunakan metode yang tertera, penambahan waktu akibat metode tersebut yang paling optimal adalah sebanyak 14 hari dan dengan penambahan waktu tersebut terjadi pemerataan sumber daya pada minggu ke-3 hingga minggu ke-9 pada pekerjaan raft di Tokyo RiverSide. Durasi akhir dari penyelesaian proyeknya dari 71 hari menjadi 84 hari, dengan histogram pekerja yang lebih stabil penambahan pekerjanya.