Arfan Bakhtiar
Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro, Jl. Prof. Soedarto, SH, Kampus Undip Tembalang, Semarang, Indonesia 50275

Published : 12 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 12 Documents
Search

PENERAPAN PRINSIP KAIZEN DALAM PEMBUATAN PIPA BAJA PADA MASA PANDEMI COVID-19 DI PT. INDONESIA STEEL TUBE WORKS (Studi Kasus : PT Indonesia Steel Tube Works) Regine Anciella Susantya Permadi; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 11, No 4 (2022): WISUDA PERIODE OKTOBER TAHUN 2022
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT Indonesia Steel Tube Works merupakan perusahaan yang bergerak dibidang industri pipa tabung baja. Pipa baja yang diproduksi ada beragam jenis dan ukurannya salah satunya adalah jenis Rectangular Mechanical Tube dengan dimensi 100.0 x 50.0 mm. Dalam pengendalian kualitas proses produksi pipa, dilakukan pengecekan atau inspeksi produk dan pencatatan jumlah cacatnya. Pada masa pandemi ini terdapat peningkatan defect atau cacat produk cukup tinggi, hal ini dibuktikan dengan meningkatnya angka cacat karena proses produksi, khususnya cacat gores yang menjadi fokusan perusahaan. Bedasarkan data tahun 2019 persentase cacat gores sebesar 0,132% sedangkan tahun 2020 persentase cacatnya sebesar 1,058%. Pada data tersebut mengidentifikasikan adanya peningkatan yang cukup significant. Untuk pengurangan cacat produksi yang ada digunakan analisis prinsip Kaizen sebagai upaya peningkatan secara terus-menerus. Langkah yang dilakukan dalam penelitian ini berdasarkan siklus Plan, Do, Check, Action (PDCA) dan fishbone diagram & 5whys untuk menganalisis. Hasil penelitian menunjukkan bahwa cacat yang paling berpengaruh adalah cacat gores dimana persentase rata-rata cacat produk per tahun paling tinggi diantara cacat proses lainnya. Masalah cacat gores disebabkan oleh beberapa hal seperti, kurang konsistensinya pekerja, suasana pabrik yang tidak mendukung (gelap dan kurang ventilasi). Rekomendasi perbaikan yang telah dianalisis adalah dengan memperbaiki lampu, menambah ventilasi, memperketat system kontrol, memperbaiki layout perusahaan, melakukan pelatihan untuk karyawan.Kata kunci: Kaizen, defect, PDCA, 5 Whys Analysis, Fishbone diagramAbstract PT Indonesia Steel Tube Works is a company that produce pipe with a various size and type, one of them is Rectangular Mechanical Tube (100.0 x 50.0 mm). In terms of quality control, PT Indonesia Steel Tube Works implement inspection process toward the product and have defects report every month. In this pandemic situation, the company analyze the increasing percentage of defect product. The statement is proved based on the data recording for scratch defect has significantly increase from 0,132% in 2019 to 1,058% in 2020. This problem can be solved through the Kaizen principals which having a continuous improvement to reach the aim of “zero defect”. We implement this methods through analyze and create Plan, Do, Check, Action (PDCA) cycle and also utilize Fishbone diagram and 5 Whys to help us analyze the problem. The results of our observation shows the most significant defect is scratch defect which have a higher percentage. This problem has done because of unconsistency of workers, unsupported environment ( less light in the factory and need more ventilation). We create a recommendation to fix the problem by adding more lamp and ventilation inside the factory, controlling system fixed, renew and analyze the factory layout, and create a scheduled training for employees and workers.Kata kunci: Kaizen, defect, PDCA, 5 Whys Analysis, Fishbone diagram
USULAN PERBAIKAN LAYANAN PADA APLIKASI MYORBIT MENGGUNAKAN INTEGRASI MODEL UNDEFIED THEORY OF ACCEPTANCE AND USE OF TECHNOLOGY (UTAUT) DAN TASKTECHNOLOGY FIT (TTF) Dheva Aulia Pratama; Susatyo Nugroho Widyo Pramono; Arfan Bakhtiar; Aries Susanty
Industrial Engineering Online Journal Vol 11, No 4 (2022): WISUDA PERIODE OKTOBER TAHUN 2022
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAKPerusahaan berlomba lomba memberikan inovasi terkait kemajuan teknologi yang mereka berikan. Seluruh kegiatan yang dilakukan saat ini terhubung menggunakan sistem informasi. Hal ini yang mendorong Telkomsel memberikan sebuah inovasi bahwa wifi dapat dibawa kemanapun dan diatur melalui sistem informasi. Dalam kenyataannya, masih terdapat beberapa kekurangan dalam sistem layanan yang diberikan. Adopsi pengguna ditentukan tidak hanya oleh persepsi mereka tentang teknologi tetapi juga oleh kesesuaian antara teknologi dan tugas. Dengan kata lain, meskipun suatu teknologi dapat dianggap maju, jika tidak sesuai dengan persyaratan tugas pengguna, mereka mungkin tidak mengadopsinya. Dengan mengintegrasikan model UTAUT dan TTF, penelitian ini bertujuan untuk mengetahui faktor apa yang menyebabkan pengguna memilih untuk menggunakan sistem layanan saat ini. Penelitian ini menggunakan SEM untuk menguji pengaruh variabel-variabel tersebut. Pengujian hipotesis menunjukkan bahwa variabel Facilitating Conditions dan Social Influence memiliki pengaruh terhadap User Adoption, dan Technology Characteristics memiliki pengaruh terhadap Effort Expectancy dan Task-Technology Fit, serta Effort Expectancy yang berpengaruh terhadap Performance Expectancy.Kata Kunci : Wifi, UTAUT, TTF, SEM.ABSTRACTProposed Service Improvement On Myorbit Application Using The Integration Of The Undefied Theory Of Acceptance And Use Of Technology (UTAUT) And Task-Technology Fit (TTF) Model Companies are competing to provide innovations related to the technological advances they provide. All activities carried out are currently connected using an information system. This has prompted Telkomsel to provide an innovation that wifi can be carried anywhere and managed through an information system. In reality, there are still some shortcomings in the service system provided. User adoption is determined not only by their perception of the technology but also by the fit between the technology and the task. In other words, although a technology may be considered advanced, if it does not meet the requirements of the user's task, they may not adopt it. By integrating the UTAUT and TTF models, this study aims to find out what factors cause users to choose to use the current service system. This study uses SEM to test the effect of these variables. Hypothesis testing shows that Facilitating Conditions and Social Influence variables have an influence on User Adoption, and Technology Characteristics have an influence on Effort Expectancy and Task-Technology Fit, and Effort Expectancy which affects Performance Expectancy. Keywords : Wifi, UTAUT, TTF, SEM.
USULAN PERENCANAAN FORECASTING BAHAN BAKU GULA PASIR PEMBUATAN MINUMAN SARSAPARILLA DENGAN MENGGUNAKAN METODE TIME SERIES DAN PERENCANAAN SAFETY STOCK (Studi Kasus : PT. Pabrik Es Siantar) Kristin Florens Purba; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 11, No 4 (2022): WISUDA PERIODE OKTOBER TAHUN 2022
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT. Pabrik Es Siantar merupakan perusahaan yang bergerak di bidang manufaktur yang memproduksi es batangan dan minuman berkarbornasi. Bahan baku pembuatan minuman sarsaparilla terdiri dari 2 komponen yaitu bahan baku utama dan bahan tambahan. Salah satu bahan baku terpenting dalam pembuatan badak sarsaparilla yang termasuk dalam minuman berkarbonasi adalah gula pasir. Gula pasir merupakan bahan baku tambahan yang paling banyak digunakan dalam proses pembuatan badak sarsaparilaa saat ini dikarenakan berfungsi untuk sebagai pemanis alami dan pengawet pada minuman botol Badak. Permintaan pada minuman badak sarsaparilla semakin meningkat dari waktu ke waktu. Hal ini jelas akan berdampak pada jumlah inventory bahan baku yang sangat sulit dikendalikan dan juga kejadian overstock maupun stockout sangat sering terjadi maka diperlukan pengendalian dari bahan baku seperti peramalan dan penentuan safety stock. Jumlah pemesanan didasarkan pada pola permintaan dari data masa lalu. Dari permasalahan tersebut maka diperlukan adanya perencanaan pemesanan bahan baku gula pasir yang sesuai. Untuk melakukan perencanaan pemesanan gula pasir yang sesuai diperlukan adanya peramalan kebutuhan gula pasir di masa yang akan datang dengan metode time series. Berdasarkan perbandingan nilai MAPE, maka metode yang terpilih ialah metode Holt Winter Multiplikatif dengan hasil peramalan sebesar 417286,5 ton dan MAPE sebesar 25. Usulan yang diberikan yaitu pemesanan bahan baku Gula Pasir kembali dilakukan ketika kuantitas persediaan telah mencapai level 8512 kg dengan service level 90% dan 13255 kg dengan service level 95% untuk menghindari kondisi bahan baku gula pasir tidak mencukupi kebutuhan produksi untuk periode kedepannya atau bahkan kelebihan stock.Kata Kunci : Peramalan, pasir silika, time series, inventory, safety stockAbstractPT. Siantar Ice Factory is a company engaged in manufacturing that produces ice bars and carbonated drinks. The raw material for making Sarsaparilla drink consists of 2 components, namely the main raw material and additional ingredients. One of the most important raw materials in the manufacture of rhino sarsaparilla which is included in carbonated drinks is sugar. Granulated sugar is the most widely used additional raw material in the process of making rhino sarsaparilla at this time because it functions as a natural sweetener and preservative in Rhino bottled drinks. The demand for sarsaparilla rhino drinks is increasing from time to time. This will have an impact on the amount of raw material inventory which is very difficult to control also the occurrence of overstock and stockouts is very frequent, so it is necessary to control raw materials such as forecasting and determining safety stock. The number of orders is based on demand patterns from past data. From these problems, it is necessary to have an appropriate ordering plan for raw sugar. In order to plan an appropriate order of granulated sugar, it is necessary to forecast the demand for granulated sugar in the future using the time series method. Based on the comparison of MAPE values, the method chosen is the Holt Winter Multiplicative method with forecasting results of 417286.5 tons and MAPE of 25. The suggestion given is to order granulated sugar raw materials again when the inventory quantity has reached the level of 8512 kg with a service level 90 % and 13255 kg with a service level of 95% to avoid the condition that the raw material for granulated sugar is not sufficient for production needs for the future period or even excess stock.Keywords: Forecasting, silica sand, time series, inventory, safety stock
PERANCANGAN DAN STUDI KELAYAKAN PEMBANGUNAN PERUSAHAAN PENGELOLAAN SAMPAH PLASTIK DI KABUPATEN TEMANGGUNG Sindu Wahyu Purnomo; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 11, No 4 (2022): WISUDA PERIODE OKTOBER TAHUN 2022
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakSalah satu masalah besar yang dihadapi Temanggung saat ini adalah masalah sampah dikarenakan tingginya produksi sampah dihadapkan dengan pengelolaan sampah yang belum baik. Untuk mengatasi masalah tersebut Pemerintah Daerah Kabupaten Temanggung sedang membangun sistem pengelolaan sampah terpadu dari hulu ke hilir. Program tersebut telah dilaksanakan dengan pembangunan Tempat Penampungan Sementara (TPS) sampah di setiap Desa di Kabupaten Temanggung. Untuk melengkapi sistem tersebut direncanakan adanya pembangunan perusahaan pengelolaan sampah plastik. Pembangunan fasilitas yang melayanani satu wilayah Kabupaten memerlukan alokasi sumber daya dan sumber dana yang tidak sedikit. Oleh karena itu penelitian ini dilakukan untuk merancang dan menganalisa kelayakan rencana tersebut. Data acuan yang didapatkan dari PT Majestic selaku pengelola sampah plastik yang sudah berjalan digunakan untuk merancang perusahaan. Analisa kelayakan finansial dilakukan menggunakan software COMFAR III Expert dengan parameter kelayakan Net Present Value (NPV), Payback Period (PP), Internal Rate of Return (IRR), dan Benefit Cost Ratio (BCR), sedangkan kelayakan non-finansial menggunakan analisis kelayakan pasar, teknis dan teknologi, manajemen organisasi, serta operasional. Dari perhitungan didapatkan nilai NPV Rp. 1.348.190.862, nilai PP 4 tahun, nilai IRR 34,26% dan nilai BCR 1,16. Rancangan tersebut juga dinyatakan layak pada analisis kelayakan pasar, teknis dan teknologi, manajeman organisasi, serta operasional.Kata kunci: Analisa Kelayakan; Comfar; Perancangan; Plastik; SampahAbstract[Design and Feasibility Study of Plastic Waste Processing Company in Temanggung District] One of the bigest problems facing Temanggung District today is the waste problem because the high waste production is faced with poor waste management. To solving this problem, the Temanggung Regency Government is building an integrated waste management system. The program has been implemented with the construction of Temporary Shelters (TPS) for waste in every village in Temanggung Regency. To complete the system, it is planned to build a plastic waste processing company. But, it is requires a large allocation of resources and funding sources. Therefore, this research was conducted to design and analyze the feasibility of the plan. Reference data obtained from PT Majestic Bekasi as a plastic waste company that has been running is used to design the company. Financial feasibility analysis was calculated using COMFAR III Expert software that using feasibility parameters of Net Present Value (NPV), Payback Period (PP), Internal Rate of Return (IRR), and Benefit Cost Ratio (BCR). In the other hand non-financial feasibility is using market, technical and technological, management organization, and operations feasibility analysis. From the calculation, the NPV value is Rp. 1,348,190,862, PP value is 4 years, IRR value is 34.26% and BCR value is 1.16. The design was also declared feasible in non-financial feasibility studies. Keywords: Comfar; Design; Feasibility Studies; Plastic Waste; Waste
PENILAIAN RISIKO KESELAMATAN KERJA PADA PEKERJA REPERASI KAPAL DENGAN METODE JSA (Studi Kasus: PT. Janata Marina Indah) Corri Crusita Wati; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 12, No 2 (2023): WISUDA PERIODE APRIL TAHUN 2023
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakSeiring dengan meningkatnya perindustrian dunia, keperluan akan mengidentifikasi risiko terjadinya kecelakaan kerja semakin meningkat. Hal ini dikarenakan dampak yang disebabkan oleh kecelakaan kerja ini sangat besar terutama untuk perusahaan. Berdasarkan penelitian yang dilakukan Fran Mahendar dan Darminto 2013 dalam jurnal (Job et al. 2017) dapat diidentifikasi bahaya risiko kecelakaan kerja pada PT. Janata Marina Indah Unit 1 Semarang dibengkel Perbaikan galangan kapal pada 6 kegiatannya dimana diketahui bahwa PT. Janata Marina Indah belum menerapakan K3 secara optimal bagi para pekerjanya.Berangkat dari hal tersebut maka dilakukan penelitian mengenai Penilaian Risiko Keselamatan Kerja pada bagian Reparasi Kapal dengan Metode JSA pada perusahaan tersebut. Kemungkinan terjadinya kecelakaan industri pada saat pekerjaan reparasi kapal PT. Janata Marina Indah Semarang dapat dikenali dari Job Safety Analysis (JSA). Untuk mengetahui nilai tingkat risiko yang ada pada perusahaan penelitin dan bagian safety perusahaan mengidentifikasi sumber bahaya dari setiap kegiatan dan tahapan proses serta menilai indeks kemungkinan dan indeks risiko lalu dilakukan pengolahan menggunakan metode Job Safety Analysis (JSA) di dapatkanlah nilai dan dilanjutkan rating risiko. Pada penilaian risiko pada 5 tahapan proses, 11 kegiatan dalam pekerja di perusahaan reparasi kapal, 81 sumber bahaya, dan rating risiko yang berbeda. Pada rating risiko terdapat 5 kemungkinan yang terjadi sangat tinggi, tinggi, menengah, rendah, dan sangat rendah. Dengan 5 kemungkinan tersebut terdapat data hasil indeks akhir risiko yaitu Tinggi 4, menengah 12, sangat rendah 24, dan rendah 41. Berbagai tindakan pencegahan yang dapat disarankan dengan metode JSA antara lain penggunaan alat pelindung diri, melakukan pemeriksaan rutin terhadap peralatan kerja, melakukan pemeriksaan kesehatan karyawan secara berkala, dan menyeleksi karyawan berdasarkan keahliannya.Kata kunci: Keselamatan Kerja,Reparasi Kapal, Manajemen Resiko, Job Safety AnalysisAbstractThe Growth of Industrial forced us to identified the risk of accident in work. It happens because the impact of working accident is quite massive especially for industries. Based on Fran Mahendar and Darminto (2013) in Job et al.Journal (2017), the research was able to identified the risk of working accident in PT. Janata Marina Indah Unit 1 Semarang in their 6 activities and was concluding their implementation of Safe and Health protocol hasn’t optimalize yet. This research was held to assess the risk of Health and Safety at Ship Reparation section using JSA method in PT. Janata Marina Indah. The probability of working accident can be identified using Job Safety Analysis (JSA). In order to cathegorized the lebel of hazardous activity, Safety section is analyzing the source of hazard in every activities then they will scoring and ratting the risk using Job Safety Analysis (JSA) methods. Based on the assessment, there are 11 work activities in ship reparation, 81 source of hazard, and different risk rating. In risk rating there are 5 level which is very high, high, medium, low, very low. From the assessment, there are 4 activities which cathegoriezed as high, 12 activities are medium, 41 activities are low, and 24 activities are very low. Several mitigation which can be implemented as a prevention such as the usage of APD, Suspection in their factory tools and machine, general check up in their employee and placing the right person based on their skills. Keywords: Work Safety, Ship Reparation, Risk Management, Job Safety Analysis
ANALISIS BEBAN KERJA FISIOLOGIS DAN PSIKOLOGIS PADA TENAGA KERJA BONGKAR MUAT BAHAN PELEDAK MENGGUNAKAN METODE CARDIOVASKULAR LOAD (CVL) DAN NATIONAL AERONAUTICS AND SPACE ADMINISTRATION – TASK LOAD INDEX (NASA- TLX) (Studi Kasus PT Semen Padang) Amelia Rosalina Putri; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 12, No 2 (2023): WISUDA PERIODE APRIL TAHUN 2023
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAKProses bongkar muat merupakan salah satu kegiatan dalam sistem penerimaan barang yang melibatkan tenaga manusia dan mesin dalam proses pemindahan barang dari container menuju gudang. Namun pada PT Semen Padang proses penerimaan barang khususnya bahan peledak yang digunakan sebagai bahan untuk meledakkan bukit kapur yang merupakan bahan baku pembuatan semen masih menggunakan tenaga manusia secara manual dalam proses bongkar muatnya. Hal ini mengakibatkan operator bongkar muat harus menggunakan punggung mereka sebagai media pemindahan barang. Sehingga perlu dilakukan pengukuran dan evaluasi terhadap beban kerja yang dialami oleh operator bongkar muat, agar tidak menimbulkan efek negative terhadap tubuh setelah melakukan pekerjaannya. Studi ini dilakukan dengan menggunakan metode Cardiovaskular Load (CVL) untuk mengukur beban kerja fisiologis dan National Aeronautics And Space Administration – Task Load Index (NASA- TLX) untuk mengukur beban kerja psikologis.Kata kunci : Beban Kerja, Cardiovaskular Load (CVL), National Aeronautics And Space Administration – Task Load Index (NASA- TLX).ABSTRACTThe loading and unloading process is one of the activities in the goods receiving system which involves human and machine power in the process of moving goods from containers to warehouses. However, at PT Semen Padang, the process of receiving goods, especially explosives used as materials to blow up limestone hills which are the raw material for making cement, still uses manual labor in the loading and unloading process. This resulted in loading and unloading operators having to use their backs as a medium for moving goods. So it is necessary to measure and evaluate the workload experienced by loading and unloading operators, so as not to cause negative effects on the body after carrying out their work. This study was conducted using the Cardiovascular Load (CVL) method to measure physiological workload and the National Aeronautics And Space Administration – Task Load Index (NASA-TLX) to measure psychological workload. Keyword : Workload, Cardiovaskular Load (CVL), National Aeronautics And Space Administration – Task Load Index (NASA- TLX).
PERBAIKAN PROSES PRODUKSI COCONUT SHELL BRIQUETE CHARCOAL DENGAN METODE COST INTEGRATED VALUE STREAM MAPPING Evanda Ryan Prakoso; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 12, No 3 (2023): WISUDA PERIODE JULI TAHUN 2023
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakIndustri arang kelapa di Indonesia merupakan sektor indutri yang saat ini sedang meningkat. Menurut data Badan Pusat Statistik (BPS), ekspor arang kelapa mengalami peningkatan 4,69% dari USD 145,1 juta pada tahun 2019 menjadi USD 151,9 juta pada tahun 2020. CV. XYZ merupakan salah satu industri yang mengolah batok kelapa menjadi briket arang kelapa. Perusahaan ini khusus memproduksi coconut shell briquete charcoal (briket arang kelapa) untuk rokok shisha atau hookah. Penelitian ini bertujuan untuk mengidentifikasi proses produksi briket arang kelapa pada CV. XYZ menggunakan pendekatan lean manufacturing dengan metode cost integrated value stream mapping. Setelah itu dilakukan identifikasi waste dan penyebabnya menggunakan analisis fishbone sehingga dapat diberikan rekomendasi perbaikan yang tepat. Waste yang ditemukan pada penelitian ini adalah waiting, transportation, overprocessing, dan inventory. Hasil dari rekomendasi perbaikan yang diberikan dapat menurunkan 21% total waktu produksi dan menurunkan total biaya produksi sebanyak 1%.Kata kunci : Lean manufacturing, cost integrated value stream mapping, fishbone diagramAbstractIn Indonesia, one economic sector that currently growing is the production of coconut charcoal. According from the Central Statistics Agency (BPS), coconut charcoal exports increased by 4.69% from USD 145.1 million in 2019 to USD 151.9 million in 2020. CV. XYZ is one of the industries that processes coconut shells into coconut charcoal briquettes. This company specifically produces coconut shell briquete charcoal (coconut charcoal briquettes) for shisha or hookah cigarettes. This study aims to identify the production process of coconut charcoal briquettes at CV. XYZ uses a lean manufacturing approach with a cost integrated value stream mapping method. After that, identify the waste and its causes using fishbone analysis so that appropriate recommendations for improvement can be given. The waste found in this research is waiting, transportation, overprocessing, and inventory. Improvement suggestions made can result in a 21% reduction in overall production time and an 1% reduction in overall production costs.Keywords: Lean manufacturing, cost integrated value stream mapping, fishbone diagram
PENGENDALIAN PERSEDIAAN BAHAN BAKU HOPPER SEBAGAI KOMPONEN UTAMA WHEELBARROW DENGAN PENDEKATAN METODE MIN-MAX STOCK (STUDI KASUS : PT CAHAYA MAJU BAHAGIA) Ananda Shafy Pradia; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 12, No 3 (2023): WISUDA PERIODE JULI TAHUN 2023
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT Cahaya Maju Bahagia adalah suatu perusahaan yang memproduksi wheelbarrow di Indonesia. Tidak adanya divisi PPIC pada PT Cahaya Maju Bahagia yang dapat melakukan metode peramalan dan pengendalian bahan baku dengan metode yang tepat sehinngga beberapa kali terjadi overstock dan stockout pada bahan baku komponen Hopper sebagai komponen utama yang berfungsi sebagai wadah untuk mengangkut bahan baku. Berdasarjan permasalah tersebut maka dilakukan perhitungan menggunakan beberapa metode peramalan yaitu metode 3 Double Moving Average, Double Exponential Smoothing, dan Additive Decomposition untuk mengetahui seberapa besar pemakaian pada periode selanjutnya. Setelah itu, dilakukan perhitungan safety stock kemudian dilakukan perhitungan menggunakan metode min-max yang bertujuan untuk mengetahui berapa batas stok minimum dan maximum bahan baku yang akan disimpan digudang nantinya. Berdasarkan hasil pengolahan data didaptkan bahwa metode peramalan terbaik menggunakan metode Additive Decomposition dan didapatkan minimum inventory bahan baku plat hopper untuk periode Januari-Desember 2022 adalah sebesar 157.214 kg untuk service level 90% dan 163.695 kg untuk service level 95%. Sedangkan maximum inventory bahan baku plat hopper adalah sebesar 291.569 kg untuk service level 90% dan 298.050 kg untuk service level 95%..Kata kunci: forecasting; metode min-max; safety stock; time series.Abstract[Title: Control Of Hopper Raw Material Inventory As The Main Component Of Wheelbarrow With MinMax Stock Method Approach(Case Study : Pt Cahaya Maju Bahagia)] PT Cahaya Maju Bahagia is a company that produces wheelbarrows in Indonesia. There is no PPIC division at PT Cahaya Maju Bahagia that can perform forecasting and control methods for raw materials with the right method so that several times overstock and stockout occur on the Hopper component raw material as the main component that functions as a container for transporting raw materials. Based on these problems, calculations are carried out using several forecasting methods, namely the 3 Double Moving Average, Double Exponential Smoothing, and Additive Decomposition methods to find out how much usage in the next period. After that, the safety stock calculation is carried out and then the calculation is carried out using the min-max method which aims to find out what the minimum and maximum stock limits for raw materials will be stored in the warehouse later. Based on the results of data processing, it is found that the best forecasting method uses the Additive Decomposition method and the minimum inventory of hopper plate raw materials for the period January-December 2022 is 157,214 kg for service level 90% and 163,695 kg for service level 95%. While the maximum inventory of hopper plate raw materials is 291,569 kg for service level 90% and 298,050 kg for service level 95%.Keywords: forecasting; metode min-max; safety stock; time series.
ANALISIS BEBAN KERJA MENTAL DENGAN MENGGUNAKAN METODE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION TASK LOAD INDEX (NASA- TLX) PADA DIVISI MAINTENANCE (Studi Kasus: Rumah Sakit Premier Bintaro) Mario Parhan; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 12, No 4 (2023): WISUDA PERIODE OKTOBER TAHUN 2023
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakRumah Sakit Premier Bintaro merupakan salah layanan publik yang menyelenggarakan jasa pelayanan kesehatan yang berada di wilayah Bintaro Sektor 7 Tangerang Selatan. Dalam melakukan aktivitasnya, karyawan maintenance umum RS Premier Bintaro tidak jarang mendapat tekanan yang cukup tinggi sehingga terjadi peningkatan beban kerja mental. Untuk itu, perlu dilakukan analisis seberapa besar beban kerja mental yang dialami dan faktor apa yang mempengaruhinya, sehingga pihak Rumah Sakit dapat menentukan langkah yang tepat untuk memperbaiki kondisi tersebut. Metode yang digunakan untuk mengukur beban kerja mental para karyawan adalah NASA-TLX. Berdasarkan hasil pengolahan data, ditemukan bahwa dari 20 orang responden, 5 orang diantaranya memiliki beban kerja mental tergolong berat, 5 orang memiliki beban kerja mental tergolong sedang, dan 10 orang memiliki beban kerja tergolong ringan. Diketahui juga bahwa urutan elemen-elemen beban kerja mental mulai dari yang paling berpengaruh terhadap beban kerja mental karyawan maintenance yaitu elemen Own Performance (OP), Effort (EF), Temporal Demand (TD), Physical Demand (PD), Mental Demand (MD), dan yang terakhir Frustration (FR). Dari hasil analisis hasil pengolahan data tersebut, diberikan rekomendasi perbaikan yang mencakup aspek Kebijakan dan Tata Kerja, Karyawan, Lingkungan Kerja, serta Keringanan Beban Kerja Mental Karyawan.Kata Kunci: Beban Kerja Mental; NASA-TLXAbstract[Mental Workload Analysis Using National Aeronautics And Space Administration Task Load Index (NASA-TLX) Method In Maintenance Division (Case Study: Premier Bintaro Hospital)] Premier Bintaro Hospital is a public service that provides health services in the Bintaro Sector 7 area, South Tangerang. In carrying out their activities, general maintenance employees of Premier Bintaro Hospital often get high enough pressure which causes an increase in mental workload. For this reason, it is necessary to analyze how much mental workload is experienced and what factors influence it, so that the company can determine the right steps to solve this condition. The method used to measure the mental workload of employees is NASA-TLX. Based on the results of data processing, it was found that from 20 respondents, 5 of them had a heavy mental workload, 5 people had a moderate mental workload, and 10 people had a light workload. It is also known that the order of mental workload elements starts from the most influential on the employees’ mental workload, namely the elements of Own Performance (OP), Effort (EF), Temporal Demand (TD), Physical Demand (PD), Mental Demand (MD). ), and finally Frustration (FR). From the analysis results of the data processiing, recommendations for improvement are given which include aspects of Policies and Work Procedures, Employees, Work Environment, and The Employees’ Light Mental Workload.Keywords: Mental Workload; NASA-TLX
PERANCANGAN SISTEM PENGUKURAN KINERJA RANTAI PASOK DENGAN PENDEKATAN SCOR PADA PT. XYZ Feby Indah Kesuma; Arfan Bakhtiar
Industrial Engineering Online Journal Vol 12, No 3 (2023): WISUDA PERIODE JULI TAHUN 2023
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

AbstrakPT. XYZ merupakan perusahaan manufaktur yang bergerak dalam bidang otomotif. Dalam proses bisnisnya perusahaan ini menghadapi masalah pada rantai pasok perusahaan. Permasalahan tersebut terjadi pada bagian hilir dan hulu perusahaan yaitu pada proses pengadaan bahan baku masih terjadi keterlambatan hingga masih terjadi keterlambatan delivery produk ke customer. Selain itu, perusahaan juga belum memiliki sistem pengukuran kinerja rantai pasok. Oleh karena itu perlu dilakukan penelitian untuk merancang sistem pengukuran kinerja rantai pasok sekaligus mengukur kinerja rantai pasok perusahaan. Metode yang digunakan pada penelitian ini dengan pendekatan Supply Chain Operation Reference (SCOR) 12.0. Hasil dari penelitian ini diperoleh 16 indikator kinerja yang dapat digunakan sebagai alat ukur kinerja rantai pasok dengan nilai kinerja rantai pasok sebesar 85.4 yang termasuk kategori Good. Setelah dilakukan pemetaan kinerja indikator dengan menggunakan diagram Importance Performance Analysis (IPA) diketahui bahwa terdapat 2 indikator yang termasuk dalam kuadran A dan menjadi prioritas perbaikan antara lain % Orders Received On-Time to Demand Requirement dan Schedule Achievement. Maka dari itu diberikan strategi rekomendasi perbaikan untuk meningkatkan kinerja antara lain Coordination and Communication, dan Monitoring and Evaluation, serta Information Management untuk indikator % Orders Received On-Time to Demand Requirment dan strategi Coordination and Communication, Scheduling for Condition Monitoring dan Human Resource Training untuk indikator Schedule Achievement.Kata kunci: Rantai Pasok; Pengukuran Kinerja Rantai Pasok; SCORAbstractPT. XYZ is a manufacturing company engaged in the automotive sector. In its business process, this company faces problems in the company's supply chain. This problem occurs in the downstream and upstream parts of the company, namely in the raw material procurement process which is still experiencing delays so that there are still delays in product delivery to customers. In addition, the company also does not have a company supply chain performance measurement system. Therefore, it is necessary to conduct research to design a supply chain performance measurement system while measuring the company's supply chain performance. The method used in this study is the Supply Chain Operation Reference (SCOR) 12.0 approach. The results of this study obtained 16 performance indicators that can be used as a supply chain performance measurement tool with a supply chain performance value of 85.4 which is included in the Good category. After mapping the performance indicators using the Importance Performance Analysis (IPA) diagram, it is known that there are 2 indicators that are included in quadrant A and become priority improvements, including % Orders Received On-Time to Demand Requirements and Schedule Achievement. Therefore recommendations for improvement strategies are given to improve performance, including Coordination and Communication, and Monitoring and Evaluation, as well as Information Management for the % Orders Received On-Time to Demand Requirement indicator and Coordination and Communication strategies, Scheduling for Condition Monitoring and Human Resource Training for Schedule Achievement indicator.Keywords: Supply Chain; Supply Chain Performace Measurement; SCOR