IMPLEMENTATION OF THE CPM METHOD IN THE CONSTRUCTION PROJECT OF THE SURABAYA “X” HOSPITAL HEALTH CHECKUP Hendry Apriyanto; I made Jiwa Astika; Eko Krisdiono
STTAL POSTGRADUATE - INTERNATIONAL CONFERENCE Vol 6 No 1 (2022): Indonesia Naval Technology College STTAL Postgraduate International Conference -
Publisher : Indonesian Naval Technology College STTAL

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The process of planning to project control during the execution of construction work is an important activity of aproject. A project can be said to be a success or a failure caused by ineffective planning and control, so projectactivities fail. so there will be a delays, decreased quality, and increased implementation costs. A project is limitedby a predetermined time and cost so management in the project must be able to anticipate changing conditionsthat occur. The Critical Path Method abbreviated CPM method can be applied to manage project completion timemore efficiently and effectively. To be able to reduce the impact of project delays and cost overruns through acrash calculation mechanism with three alternative controls; additional labor or overtime work. Durationacceleration is carried out on jobs that are on the critical path and with the cheapest costs. In this study, the totalproject age was 277 calendar days, while the project deadline was 284 calendar days, thus the project wasdelayed for 7 calendar days with a total fine of Rp 25.242.944.400 and penalty cost is 1/1.000 for sum of contract.In this study the CPM method is intended to shorten the life of the project so that it can be completed in accordancewith the predetermined time limit and determine the age of project in accordance with the existing contract, usingCPM the project life can be shortened to 257 working days with an budget efficiency Rp. 176,700,611Keywords: Scheduling, CPM, Critical Path, Crashing, Time Acceleration
RISK ASSESSMENT OF SAFETY AND SECURITY OF BALI COASTAL AND ASSIGNMENT OF DENPASAR NAVAL BASE ELEMENTS Nyoman Astawa; Iwan Vanany; Eko Krisdiono; Mukhlis Mukhlis
STTAL POSTGRADUATE - INTERNATIONAL CONFERENCE Vol 7 No 01 (2023): Indonesia Naval Technology College STTAL Postgraduate International Conference -
Publisher : Indonesian Naval Technology College STTAL

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The management of Bali's coastal waters is one of the priorities of the Bali provincial government as one of the drivers of the community's economy. The aspect of marine security and safety is one of the important factors that must be maintained to support the effective management of a waters. Therefore, mitigation measures are needed in dealing with various types of threats with the level of risk posed in the management of the Bali Coastal Sea waters. Denpasar Naval Base as one of the institutions tasked with maintaining security and safety in the territorial waters of Bali. The title of marine security operations element of the Denpasar Lanal is one of the main forces in maintaining security and safety stability in Bali's waters. In this research, identification of the types of threats and measurement of the risks posed will be carried out, which are measured from the perspective of maritime security and safety. From the results of the risk analysis, optimization modeling for the assignment of Denpasar Naval Base elements was carried out as a mitigation measure for various types of threats to be assigned to several Naval Post located in the coastal area of Bali. Identification of the types of threats is carried out by involving several experts in the field of maritime security and safety, measuring the value of risk is carried out using the Relative Comparison method. The assignment of Denpasar Naval Base elements is carried out using the Hungarian assignment method with the risk cost as a minimized aspect. The results of the risk assessment measurement show that the biggest risk faced in the management of the Bali Coastal is on the safety aspect of 67% and the security aspect with a proportion of 33%. The Assignment Optimization Model succeeded in optimizing the assignment of 6 (six) elements of the Denpasar Naval Base to 6 (six) Naval Post in the Bali Coastal Area. Keywords: Maritime Security and Safety, Risk Assessment, Hungarian Methods Assignment Model