Claim Missing Document
Check
Articles

Found 6 Documents
Search
Journal : INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY

Management Optimization of Cipanunjang-Cileunca Reservoir in Bandung Regency Using Discrete Markov Methods Mariana Marselina; Arwin Sabar; Iin Pratama Sari
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY Volume 2, Number 1, October 2018
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1382.935 KB) | DOI: 10.25105/urbanenvirotech.v2i1.3555

Abstract

This research discusses about intake Cikalong as water resource infrastructure supplying water for PDAM Bandung City and PDAM Bandung Regency that depend on the operational of Cipanunjang Dam-Cileunca Dam, Plengan Hydropower, Lamajan Hydropower, Cikalong Hydropower and water from Cisangkuy River. Nowdays, capacity of PDAM Bandung city is 1800 L/sec and capacity of PDAM Bandung Regency is 500 L/sec. However, the amount of water that could be provided by PDAM Bandung City is 1400 L/sec while PDAM Bandung Regency is 200 L/sec. Aim: Optimization on upstream infrastructure is needed to make sure the quantity of water being supplied sufficient. Methodology and Result: There are some methods that can be used to fulfill that aim, on this research use Stochastic Markov Method. The optimization of the reservoir is achieved by the condition of the guideline track and the actual trajectory approaching 1, which means the absence of wasted water through the spillway but through the reservoir utility function for turbine demand, irrigation raw water and raw drinking water in the downstream. The comparison between trajectory and actual trajectory of Cipanunjang Reservoir is 0.861 while for optimization of Cileunca Reservoir is 0.827. Conclusion, significance and impact study: The correlation between the actual (historical) discharge and the Markov estimation discharge on the Cipanunjang-Cileunca Reservoir is closed to 1, so it can be show that the discharge estimation is conceptual because it corresponds to the actual condition (actual discharge).
ENVIRONMENTAL AND HEALTH RISK ASSESSMENT (EHRA) APPROACHES IN THE STRATEGIC ENVIRONMENTAL RISK ASSESSMENT (SEA) : A METAANALYSIS Anindrya Nastiti; Siska Widya D Kusumah; Mariana Marselina; Karina Nursyafira; Astrid Monica; Dharmawan Phan
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY VOLUME 4, NUMBER 1, OCTOBER 2020
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (810.122 KB) | DOI: 10.25105/urbanenvirotech.v4i1.7191

Abstract

Aim: This paper aims to understand how the concept of risk and riskgovernance can be best articulated and integrated into Indonesia’s SEA.Attention regarding health risks emerging from human interactions withthe physical environment has increased in Sustainable Development andPlanning (SDP). Methodology and Results: Strategic EnvironmentAssessment (SEA) is the current context-based methodology addressingenvironmental and health risks of development planning in manycountries. Environmental and health risk assessment (EHRA) is anintegrated part of the SEA. EHRA, as a field of science, has evolved towardsspecific needs in many sectors, e.g. dose-response, quantitative microbialrisk assessment, ecological risk assessment. The main challenge is how todetermine the suitable EHRA approaches and translate the fact-basedEHRA into risk-informed strategies in SDP. In Indonesia, the SEA is mandatory for regional planning documents. However, there is limitedguidelines and application on EHRA in SEA. Through a meta-analysis, wereviewed scholarly articles published from 2009 to 2019 available inGoogle Scholar that report the concepts and implementation of EHRA andSEA in various countries. Conclusion, significance and study impact: Thisstudy has significant implications for the understanding of risk governancein SDP.
THE POTENTIAL CIBERANG RIVER ANALYSIS FOR DRINKING WATER SUPPLY DEVELOPMENT OF BANTEN PROVINCE Ira Mulyawati; Indah Rachmatiah Siti Salami; Arwin Sabar; Mariana Marselina; Hernita Nasir
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY VOLUME 5, NUMBER 2, APRIL 2022
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1353.541 KB) | DOI: 10.25105/urbanenvirotech.v5i2.12589

Abstract

Aim: This study was aimed to analyze the potential of water sources in the Ciberang River to support drinking water supply system of Banten Province. Methodology and results: The method use to analyze the potential of Ciberang river is a hydrological statistical analysis. The results of the hydrological statistical analysis show that the water resources of the Ciberang River are not sufficient to meet domestic and industrial water needs in Banten Province. Domestic and industrial water demand in Banten Province in 2025 is estimated at 14.64 m3/s and 10.46 m3/s, respectively, while the mainstay discharge with the return period of 10 and 20 year for all durations does not meet these water needs. The mainstay discharge of the Ciberang River with a 10-year return period of 1, 2, 7, 15 and 30 day respectively was 0.08 m3/s, 0.1 m3/s, 0.19 m3/s, 0.36 m3/s, and 0.87 m3/s. The mainstays of the 20-year return period of 1,2,7,15 and 30 day respectively are 0.04 m3/s, 0.06 m3/s, 0.11 m3/s, 0.23 m3/s and 0.59 m3/s. Conclusion, significance, and impact study: Based on this, it is necessary to conserve water resources to increase the main flow of the Ciberang River. One of the strategic policies to increase the river's mainstay discharge is constructing the reservoir.
Management Optimization of Cipanunjang-Cileunca Reservoir in Bandung Regency Using Discrete Markov Methods Mariana Marselina; Arwin Sabar; Iin Pratama Sari
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY Volume 2, Number 1, October 2018
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/urbanenvirotech.v2i1.3555

Abstract

This research discusses about intake Cikalong as water resource infrastructure supplying water for PDAM Bandung City and PDAM Bandung Regency that depend on the operational of Cipanunjang Dam-Cileunca Dam, Plengan Hydropower, Lamajan Hydropower, Cikalong Hydropower and water from Cisangkuy River. Nowdays, capacity of PDAM Bandung city is 1800 L/sec and capacity of PDAM Bandung Regency is 500 L/sec. However, the amount of water that could be provided by PDAM Bandung City is 1400 L/sec while PDAM Bandung Regency is 200 L/sec. Aim: Optimization on upstream infrastructure is needed to make sure the quantity of water being supplied sufficient. Methodology and Result: There are some methods that can be used to fulfill that aim, on this research use Stochastic Markov Method. The optimization of the reservoir is achieved by the condition of the guideline track and the actual trajectory approaching 1, which means the absence of wasted water through the spillway but through the reservoir utility function for turbine demand, irrigation raw water and raw drinking water in the downstream. The comparison between trajectory and actual trajectory of Cipanunjang Reservoir is 0.861 while for optimization of Cileunca Reservoir is 0.827. Conclusion, significance and impact study: The correlation between the actual (historical) discharge and the Markov estimation discharge on the Cipanunjang-Cileunca Reservoir is closed to 1, so it can be show that the discharge estimation is conceptual because it corresponds to the actual condition (actual discharge).
ENVIRONMENTAL AND HEALTH RISK ASSESSMENT (EHRA) APPROACHES IN THE STRATEGIC ENVIRONMENTAL RISK ASSESSMENT (SEA) : A METAANALYSIS Anindrya Nastiti; Siska Widya D Kusumah; Mariana Marselina; Karina Nursyafira; Astrid Monica; Dharmawan Phan
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY VOLUME 4, NUMBER 1, OCTOBER 2020
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/urbanenvirotech.v4i1.7191

Abstract

Aim: This paper aims to understand how the concept of risk and riskgovernance can be best articulated and integrated into Indonesia’s SEA.Attention regarding health risks emerging from human interactions withthe physical environment has increased in Sustainable Development andPlanning (SDP). Methodology and Results: Strategic EnvironmentAssessment (SEA) is the current context-based methodology addressingenvironmental and health risks of development planning in manycountries. Environmental and health risk assessment (EHRA) is anintegrated part of the SEA. EHRA, as a field of science, has evolved towardsspecific needs in many sectors, e.g. dose-response, quantitative microbialrisk assessment, ecological risk assessment. The main challenge is how todetermine the suitable EHRA approaches and translate the fact-basedEHRA into risk-informed strategies in SDP. In Indonesia, the SEA is mandatory for regional planning documents. However, there is limitedguidelines and application on EHRA in SEA. Through a meta-analysis, wereviewed scholarly articles published from 2009 to 2019 available inGoogle Scholar that report the concepts and implementation of EHRA andSEA in various countries. Conclusion, significance and study impact: Thisstudy has significant implications for the understanding of risk governancein SDP.
THE POTENTIAL CIBERANG RIVER ANALYSIS FOR DRINKING WATER SUPPLY DEVELOPMENT OF BANTEN PROVINCE Ira Mulyawati; Indah Rachmatiah Siti Salami; Arwin Sabar; Mariana Marselina; Hernita Nasir
INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY VOLUME 5, NUMBER 2, APRIL 2022
Publisher : Universitas Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25105/urbanenvirotech.v5i2.12589

Abstract

Aim: This study was aimed to analyze the potential of water sources in the Ciberang River to support drinking water supply system of Banten Province. Methodology and results: The method use to analyze the potential of Ciberang river is a hydrological statistical analysis. The results of the hydrological statistical analysis show that the water resources of the Ciberang River are not sufficient to meet domestic and industrial water needs in Banten Province. Domestic and industrial water demand in Banten Province in 2025 is estimated at 14.64 m3/s and 10.46 m3/s, respectively, while the mainstay discharge with the return period of 10 and 20 year for all durations does not meet these water needs. The mainstay discharge of the Ciberang River with a 10-year return period of 1, 2, 7, 15 and 30 day respectively was 0.08 m3/s, 0.1 m3/s, 0.19 m3/s, 0.36 m3/s, and 0.87 m3/s. The mainstays of the 20-year return period of 1,2,7,15 and 30 day respectively are 0.04 m3/s, 0.06 m3/s, 0.11 m3/s, 0.23 m3/s and 0.59 m3/s. Conclusion, significance, and impact study: Based on this, it is necessary to conserve water resources to increase the main flow of the Ciberang River. One of the strategic policies to increase the river's mainstay discharge is constructing the reservoir.