Claim Missing Document
Check
Articles

Found 4 Documents
Search

PENCEGAHAN OVER HEATING MESIN MOBIL HILUX DOUBLE CABIN Ismael Marjuki; Epriyandi Epriyandi
Injection: Indonesian Journal of Vocational Mechanical Engineering Vol 1 No 1 (2021): Februari 2021
Publisher : Politeknik Negeri Ketapang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (912.562 KB) | DOI: 10.58466/injection.v1i1.78

Abstract

Human needs are increasing in the world of transportation, especially for two-wheeled vehicles or more. In the automotive world, especially cars, there are various kinds of systems that work. These systems work in conjunction with one another so that if one of these systems is damaged, the car will be damaged. such as damage to the cooling system which can cause overheating of the engine. Overheating is the occurrence of excessive heat above the engine's working temperature which is caused by damage to one of the components of the cooling system. The occurrence of overheating in the Hilux double cabin car engine is caused by a lack of coolant, the thermostat is not functioning properly, the radiator cap is leaking, the inlet and outlet hoses are cracked and the water pump is damaged. To avoid damage, preventive maintenance must be carried out.
MODIFIKASI DONGKRAK BOTOL DAN TREKER UNTUK MELEPAS BEARING MOTOR LISTRIK Ismael Marjuki; Helanianto Helanianto; Betti Ses Eka Polonia
Injection: Indonesian Journal of Vocational Mechanical Engineering Vol 2 No 1 (2022): Februari 2022
Publisher : Politeknik Negeri Ketapang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/injection.v2i1.997

Abstract

This research modifies the bottle jack to remove the electric motor bearing of a water pump with a jack capacity of 2 tons. Bottle jacks are generally used to lift vehicles such as cars. The bottle jack can be modified so that it can be used as a bearing removal device. In general, the way to remove the bearing is still manual, namely by hitting it. The purpose of making this tool is to make it easier to remove the water pump electric motor bearing. The specifications of the tool are that it has a height of 16 - 27 cm. The width of the tool is 6 cm and the maximum pressure capacity of the bottle jack is 2 tons. The trial results of the bottle jack modification tool to remove the water pump electric motor bearings obtained an average time of 45 seconds.
Perawatan Dan Perbaikan Fruit Elevator Pabrik Kelapa Sawit Ismael Marjuki; Epriyandi Epriyandi; Rafly Miftakhul Sasti
Journal of Applied Mechanical Engineering and Renewable Energy Vol 6 No 1 (2026)
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/9d081m18

Abstract

The palm oil plantation and processing industry is a key industry for Indonesia's economy. Palm oil exports are an important source of foreign exchange earnings, and this industry provides employment opportunities for millions of Indonesians. According to data from the Indonesian Ministry of Agriculture, the total area of palm oil plantations in Indonesia currently reaches around 8 million hectares, twice the area in the early 2000s, with around 30% located on the island of Kalimantan. In an analysis of the factors affecting Indonesia's palm oil exports (Ditjenbun, 2018). This research method is a qualitative research that emphasizes more on the process and results, how a treatment and care occurs and how to handle it effectively. Conclusion, Preventive maintenance is carried out on bucket bolts, bucket chains, transmission chains, and buckets. Preventive corrective maintenance is carried out on gearboxes, transmission chains, sprocket bearings, buckets, and bucket chains. Preventive breakdown maintenance is carried out during the replacement of bucket chains, sprocket bearings, and transmission gears. There are various types of damage that commonly occur in Fruit Elevators, including: damage to buckets, sprocket bearings, gearboxes, oil seals, and bucket chains. The causes of damage generally come from wear and tear, lack of lubrication, or mechanical wear due to high workload. Daily, weekly, monthly, and annual maintenance has been carried out with respective procedures such as lubrication, component checks, replacement of spare parts, and overhaul. The implementation of this maintenance schedule has proven effective in reducing the frequency of damage. Component replacement history data shows that components such as liners, sprockets, buckets, and gearboxes have the highest damage rates, thus requiring special attention and periodic monitoring to prevent repeated damage.
Revitalisasi Infrastruktur Saluran Air Bersih untuk Mendukung Pelayanan Air Bersih Masyarakat Desa Sukabaru Kabupaten Ketapang Idris Herkan Afandi; Ismael Marjuki; Muh. Anhar; Sy. Indra Septiansyah; Herman; Firman; Sartika; Syarifah Aqla; Syarifah Mastura; Maya Santi; Desyana Ghafarunnisa; Flaminggo Gingga; Angga Kurniawan; Yusuf; Epriyandi; Helanianto; Hairian Rahmadi; Asep Ruchiyat; Dewi Nurmayasari; Firmanilah Kamil
Literasi Jurnal Pengabdian Masyarakat dan Inovasi Vol 6 No 2 (2026)
Publisher : Pengelola Jurnal Politeknik Negeri Ketapang Jl. Rangga Sentap, Dalong Sukaharja, Ketapang 78813. Telp. (0534) 3030686 Kalimantan Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/gdmrdm15

Abstract

The availability of clean water services in Sukabaru Village, Ketapang Regency, has experienced disruption due to leakage in the storage tank, low pump pressure, and blockages and leaks in the pipeline network, causing water distribution to residents to stop for several months. This Community Service Program under the Village Empowerment Scheme of Politeknik Negeri Ketapang aimed to restore the clean water supply and distribution system while supporting the sustainability of service management by the Village-Owned Enterprise (BUMDes). The program was implemented using a participatory approach involving the community service team, village government, BUMDes, and residents. The activities included field identification, technical planning, storage tank repair, installation of two 1.5 HP water pumps, pipeline network normalization, and system testing. The results showed that tank leakage was reduced, the pumping system was restored, and blocked and leaking pipelines were normalized. Following the revitalization, water flow reached households that had previously been without supply. The program directly benefited approximately 80 households. The revitalization successfully restored clean water services and supported BUMDes performance. Routine maintenance and sustainable management are recommended to maintain the functionality of the system.