Pengendalian Persediaan Bahan Baku Pada Industri Tenun Ikat “Medali Mas” Kediri M Ayub Ardhirakmanto; Sri Rahayuningsih; Ana Komari
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol 2, No 2 (2020): August
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v2i2.949

Abstract

Tenun Ikat Medali Mas Industry has long been producing woven cloth in various models and patterns. Problems faced by researchers regarding the supply of raw materials, due to the absence of controlling the amount of inventory of raw materials needed specifically, while the company is faced with demand uncertainty which is very influential on the procurement of raw material supplies. So the holding of research with forecasting methods to calculate the needs in one production period. The variable in this research is about controlling raw material inventory. The first is to collect raw material needs data. Perform forecasting with the Exponential smoothing  method α = 0.15, and Moving average N = 2. Next, the forecast results determine the smallest error value with indicators MAD, MSE, and MAPE. After the chosen method will be used as a reference for forecasting in the next period. Then perform efficient safety stock and reorder point calculations for one production period. From the results of calculations on the raw material yarn produces Maximum Inventory = 4287 kg; Safety Stock = 53 kg; Reorder Point = 128 kg while on the raw material paint Maximum Inventory = 304 kg; Safety Stock = 7 kg; Reorder Point = 12 kg.Industri Tenun Ikat Medali Mas sudah lama memproduksi kain tenun dalam berbagai model maupun corak. Permasalahan yang dihadapi oleh peneliti mengenai persediaan bahan baku, dikarenakan belum adanya pengendalian jumlah persediaan bahan baku yang dibutuhkan secara spesifik, sedangkan perusahaan dihadapkan pada ketidakpastian permintaan yang sangat berpengaruh pada pengadaan persediaan bahan baku. Sehingga diadakannya penelitian dengan metode forecasting untuk memperhitungkan kebutuhan dalam satu periode produksi. Variabel dalam penelitian ini tentang pengendalian persediaan bahan baku. Pertama dilakukan pengumpulan data kebutuhan bahn baku. Melakukan peramalan dengan metode Exponential smoothing  α = 0,15, dan Moving average N = 2. Berikutnya dari hasil peramalan ditentukan nilai eror terkecil dengan indikator MAD, MSE, dan MAPE. Setelah metode terpilih nantinya akan dijadikan acuan untuk melakukan peramalan pada periode selanjutnya. Kemudian melakukan perhitungan safety stock dan reorder point yang efisien untuk satu periode produksi. Dari hasil perhitungan pada bahan baku benang menghasilkan Maximum Inventory = 4287 kg; Safety Stock = 53 kg; Reorder Point = 128 kg sedangkan pada bahan baku cat Maximum Inventory = 304 kg; Safety Stock = 7 kg; Reorder Point = 12 kg.
Analisis Pengendalian Ketersediaan Bahan Baku Di PT. Akasha Wira Internasional, Tbk Menggunakan Metode EOQ Sandi Wardani; Sri Rahayuningsih; Ana Komari
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol 2, No 1 (2020): January
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v2i1.860

Abstract

This study aims to analyze the availability of raw materials at PT. Akasha Wira Internasional Tbk analyzes the total cost of raw material inventories, analyzes to reorder point raw materials, analyzes the amount of raw materials' safety stock, and explores raw material inventory control. The analytical method used is the Economic Order Quantity method to determine the optimal order or purchase quantity to minimize inventory costs consisting of ordering fees and storage costs. The results showed that the purchase of optimal Ades 1500 ML label raw materials according to the Economic Order Quantity method during the 2017 period for each message was more significant than what the company did. The company's optimal purchase of raw materials in 2017 is 397 m with the frequency of orders that must be done as much as 2 times. According to the Economic Order Quantity, the safety stock quantity that must be available in the warehouse is 480.15 m, and the Re-Order Point is at the time of the inventory in the warehouse is 512.91 m. The total inventory cost for the production process incurred according to the Economic Order Quantity method is smaller than the company's total inventory cost. Penelitian ini bertujuan untuk menganalisis ketersediaan bahan baku di PT. Akasha Wira Internasional Tbk, menganalisis total biaya persediaan bahan baku, menganalisis untuk melakukan pemesanan kembali (reorder point) bahan baku, menganalisis jumlah persediaan pengamanan barang  (safety stock) bahan baku, menganalisis pengendalian persediaan bahan baku. Penggunaan pendekatan yaitu metode Economic Order Quantity sebagai cara menyimpan bahan baku untuk ketersediaan biaya pesan dan biaya simpan bahan baku. Data yang diperoleh adalah data primer dan data sekunder. Pada bahan baku  ades 1500 ML tahun 2017 memiliki tingkat pemesanan yang lebih tinggi. Pembelian bahan baku optimal yang harus dilakukan perusahaan pada tahun 2017 adalah sebesar 397 m dengan frekuensi pemesanan yang harus dilakukan adalah sebanyak 2 kali. Kuantitas persediaan pengaman yang harus tersedia digudang adalah sebesar 480,15 m dan titik pemesanan kembali menurut Economic Order Quantity yaitu saat persediaan digudang tinggal 512,91 m. Maka dalam proses produksi menurut EOQ lebih kecil diabnding dengan total pembiayaan dari perusahaan. 
Analisis Rejected Produk Dalam Proses Return Di PT. Gunawan Fajar Menggunakan Metode FMEA Dyan Putra Pradana; Sri Rahayuningsih; Heribertus Budi Santoso
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol 2, No 1 (2020): January
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v2i1.863

Abstract

Business is an activity carried out by individuals or organizations that involve production, marketing, or service activities intending to make a profit or profit. In business-related activities, product defects will also occur due to human error and faulty production equipment used. Product defects that occur at PT. Gunawan Fajar has product defect codes determined by the company with RPN assumptions from the FMEA method, which is used to find out product defects by identifying and carrying out preventive activities against production failures to errors in raw materials and equipment, including machines used. From the research using this method, the results showed that on average, there were 14.3742 pieces of defects during the study with a total production per month of 44,943,473 sheets, while for RPN 294 ≥200 in number one printing block while for RPN 150 <200 at number one that is, the Weight does not match. From the Pareto diagram that occurs at the highest defect according to the measurement of the Severity, Occurrence and Detection values for PN (Printing Block), BU (Under Weight), KKC (Defective Sack Condition), KR (Renggang Sack) reaches the Risk Number Priority (RPN).   Bisnis merupakan kegiatan yang dilakukan individu maupun organisasi yang melibatkan aktivitas produksi, marketing, atau jasa dengan tujuan mendapat keuntungan atau laba. Dalam kegiatan terkait bisnis, juga akan terjadi kecacatan produk dikarenakan kesalahan faktor manusia, maupun faktor kesalahan peralatan produksi yang digunakan. Kecacatan produk yang terjadi pada PT. Gunawan fajar, memiliki kode- kode cacat produk yang sudah ditentukan oleh perusahaan dengan asumsi – asumsi RPN dari penggunaan metode FMEA, yang digunakan untuk mengetahui kecacatan produk dengan cara mengidentifikasi dan melakukan aktivitas pencegahan terhadap kegagalan produksi dikarenakan kesalahan bahan baku maupun peralatan termasuk mesin yang digunakan. Dari penelitian menggunakan metode tersebut didapat hasil bahwa dimana rata-rata terjadi cacat 14.3742 lembar selama penelitian berlangsung dengan total produksi tiap bulan sebesar 44.943.473 lembar, sedangkan untuk RPN 294 ≥200 pada nomor satu printing ngeblock sedangkan untuk RPN 150 <200 pada nomor satu yaitu berat tidak sesuai. Dari diagram pareto yang terjadi pada cacat tertinggi sesuai dengan pengukuran pada nilai Severity, Occurrence dan Detection untuk PN (Printing ngeblock), BU (Berat Under), KKC (Kondisi Karung Cacat), KR (Karung Renggang) mencapai Risk Number Priority (RPN). 
PERENCANAAN DAN PENGENDALIAN BIAYA PRODUKSI UNTUK MENINGKATKAN EFISIENSI BIAYA PRODUKSI Abilio De Jesus Martin; Sri Rahayuningsih; Imam Safi&#039;i
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol 2, No 1 (2020): January
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v2i1.864

Abstract

To maximize the optimization of production costs in planning and control production costs, namely by reducing costs as much as possible to provide maximum profit. Therefore, the sugar factory must regulate all its production activities as effectively and efficiently as possible. This activity intends to describe the planning and management of production costs as an objective that aims to increase the efficiency of production prices at PT. PG Pesantren Baru Keiri. The research method used in this research is to explain the case approach at PT. PG Pesantren Baru, taking samples by interview and taking pictures or recording. From the research results or thoughts that have been carried out, it can be concluded that the production cost budget is still inefficient. The factor that causes this is the weakness in securing production costs globally. It cannot minimize the things that cause the loss of production costs carried out by irresponsible individuals. Usaha untuk yang digunakan pada proses produksi akan berkaitan dengan perencanaan yang berasumsi pada pengendalian bahan baku yang berguna mengurangi biaya produksi untuk menambah laba pada produksi di pabrik PT. PG Pesantren Baru Kediri. Pada penelitian yang saat ini sudah mencapai hasil dengan asumsi bahwa aktivitas produksi harus bias dilakukan agar efektif serta dapat mencapai efisiensi.Metode penelitian yang dipakai pada riset ini yaitu menjelaskan dengan pendekatan kasus pada PT. PG Pesantren baru, pengambilan sampel dengan interview dan pengambilan gambar atau rekaman. Dari hasil riset atau pemikiran yang telah dilaksanakan dapat di ambil kesimpulan bahwa budget biaya produksi masih tidak efisien. Yang terjadi pada sarana kelemahan pengamanan pada biaya produksi harus diglobalkan supaya terjadi kehilangan biaya prduksi yang minimal. 
Penentuan Waktu Standar dam Jumlah Tenaga Kerja Optimal pada Bagian Winding Primercurrent Transformer (Travo Arus) Mohammad Farid Ismail; Sri Rahayuningsih; Ana Komari
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol 2, No 1 (2020): January
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v2i1.854

Abstract

In the production process using this work sampling method aims to determine whether a job is fast or not so that workers work in typical conditions that are needed in the production of primary current transformer winding based on standard time. The sampling method was developed based on the low probability. By using a degree of the confidence level of 95% and a level of accuracy of 5%, and the adjustment factor with the westing house method. The results of this study indicate the standard time required by worker 1 to complete the work is 128.4 minutes/unit; worker 2 is 125.7 minutes/unit, worker 3 is 121.9 minutes/unit and standard time of worker 4 is 123.3 minutes/unit. And the optimal number of workers that should be employed is 5.1 people, while the number of workers available in the primary winding current transformers is 4 people, so there is a need to add 1 new workforce so that the products produced according to the specified time. It is also known that the average productivity of all operators is 89.37% with the percentage of idle (idle time) of 10.62%.Kegiatan dalam proses produksi divisi winding primer current transformer dilakukan penelitian yang berkaitan dengan produktivitas menggunakan metode work sampling. Didalam metode tersebut, digunakan tingkat kepercayaan sebesar 95% dan tingkat ketelitian sebesar 5% dengan penyesuaian yang menggunakan metode westing house. Didalam perhitungannya dihasilkan nilai standar pada pekerja 1 ketika selesai tiap project dengan waktu sebesar 128,4 menit/ unit, kemudian pada pekerja 2 sebesar 125,7 menit/ unit, pada pekerja 3 sebesar 121,9 menit/ unit dan untuk pekerja 4 dapat menyelesaikan per project winding current transformer sebesar 123,3 menit/ unit. Dalam penggunaan tenaga kerja yang optimal didapat hasil bahwa dibutuhkan 5,1 atau 5 orang yang digunakan untuk melakukan proses produksi. Sehingga, pada awalnya ada 4 pekerja maka harus ditambah sebanyak 1 orang agar produk yang dihasilkan sesuai waktu yang sudah ditentukan. Disini diketahui juga produktivitas rata-rata semua operator sebesar 89,37 % dengan prosentase idle (waktu menganggur) sebesar 10,62 %. 
Pengendalian Persediaan Bahan Baku Pada Industri Tenun Ikat “Medali Mas” Kediri M Ayub Ardhirakmanto; Sri Rahayuningsih; Ana Komari
JURMATIS (Jurnal Manajemen Teknologi dan Teknik Industri) Vol. 2 No. 2 (2020): August
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmatis.v2i2.949

Abstract

Tenun Ikat Medali Mas Industry has long been producing woven cloth in various models and patterns. Problems faced by researchers regarding the supply of raw materials, due to the absence of controlling the amount of inventory of raw materials needed specifically, while the company is faced with demand uncertainty which is very influential on the procurement of raw material supplies. So the holding of research with forecasting methods to calculate the needs in one production period. The variable in this research is about controlling raw material inventory. The first is to collect raw material needs data. Perform forecasting with the Exponential smoothing  method α = 0.15, and Moving average N = 2. Next, the forecast results determine the smallest error value with indicators MAD, MSE, and MAPE. After the chosen method will be used as a reference for forecasting in the next period. Then perform efficient safety stock and reorder point calculations for one production period. From the results of calculations on the raw material yarn produces Maximum Inventory = 4287 kg; Safety Stock = 53 kg; Reorder Point = 128 kg while on the raw material paint Maximum Inventory = 304 kg; Safety Stock = 7 kg; Reorder Point = 12 kg.Industri Tenun Ikat Medali Mas sudah lama memproduksi kain tenun dalam berbagai model maupun corak. Permasalahan yang dihadapi oleh peneliti mengenai persediaan bahan baku, dikarenakan belum adanya pengendalian jumlah persediaan bahan baku yang dibutuhkan secara spesifik, sedangkan perusahaan dihadapkan pada ketidakpastian permintaan yang sangat berpengaruh pada pengadaan persediaan bahan baku. Sehingga diadakannya penelitian dengan metode forecasting untuk memperhitungkan kebutuhan dalam satu periode produksi. Variabel dalam penelitian ini tentang pengendalian persediaan bahan baku. Pertama dilakukan pengumpulan data kebutuhan bahn baku. Melakukan peramalan dengan metode Exponential smoothing  α = 0,15, dan Moving average N = 2. Berikutnya dari hasil peramalan ditentukan nilai eror terkecil dengan indikator MAD, MSE, dan MAPE. Setelah metode terpilih nantinya akan dijadikan acuan untuk melakukan peramalan pada periode selanjutnya. Kemudian melakukan perhitungan safety stock dan reorder point yang efisien untuk satu periode produksi. Dari hasil perhitungan pada bahan baku benang menghasilkan Maximum Inventory = 4287 kg; Safety Stock = 53 kg; Reorder Point = 128 kg sedangkan pada bahan baku cat Maximum Inventory = 304 kg; Safety Stock = 7 kg; Reorder Point = 12 kg.