AKSELERASI PENTAHELIX PENGEMBANGAN DESA WISATA “PANDANSILI” BERBASIS PARTISIPASI MASYARAKAT Meriana Wahyu Nugroho; Totok Yulianto; Fahrisal Gunawan; Rizka Mudyanti
ABIDUMASY Vol 4 No 1 (2023): ABIDUMASY : JURNAL PENGABDIAN KEPADA MASYARAKAT
Publisher : LPPM UNIVERSITAS HASYIM ASY'ARI TEBUIRENG JOMBANG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/abidumasy.v4i1.3890

Abstract

Pengabdian kepada masyarakat dosen dan mahasiswa Program Studi Teknik Sipil yang bekerja sama dengan BAPPEDA Kabupaten Jombang dalam program PPMBK (Penelitian dan Pengabdian Masyarakat Berbasis Kinerja) Tahun 2022, yang bertujuan untuk meningkatkan pemahaman dan keterampilan masyarakat dalam pembuatan paving ramah lingkungan di Desa Ngampungan khususnya dalam pengembangan desa wisata pandansili bermitra dengan POKDARWIS (Kelompok Sadar Wisata), dengan pemanfaatan limbah ampas tebu yang dijadikan sebagai bahan campuran pada produk paving ramah lingkungan sehingga memiliki tingkat porositas tinggi. Pelatihan dan sosialisasi pemanfaatan limbah sebagai bahan paving juga menambah pengetahuan tentang konservasi lingkungan. Metode Mix Design yang digunakan dalam proses percampuran bahan penyusun beton untuk menghasilkan takaran bahan yang sesuai serta dapat menghasilkan kualitas paving yang sesuai dengan (SNI 03-0691-1996) paving block. Selanjutnya dilakukan pengujian paving yaitu uji kuat tekan dan kuat aus, sehingga menghasilkan paving dengan mutu 10.216 MPa (K-123). Hasil tersebut membuktikan bahwa mutu paving meningkat sebesar 0.216 MPa (K-3). Penerapan pada proses produksi menggunakan metode Taguchi dengan komposisi bahan 3.916 (Kg) semen, 9.033(Kg) pasir, 0.120 (Kg) ampas tebu. Kegiatan ini juga menghibahkan alat cetak paving yang telah di desain sedemikian rupa untuk memudahkan produksi paving agar produk tersebut dapat di implementasikan menjadi fasilitas umum yang lain.
Perencanaan Jalan Rigid Pavement Pada Kawasan Perumahan Bunda Asri Kecamatan Bandarkedungmulyo Kabupaten Jombang Ahmad Irwan Hanafi; Totok Yulianto; Titin Sundari
JURNAL RISET RUMPUN ILMU TEKNIK Vol. 2 No. 2 (2023): Oktober : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v2i2.1545

Abstract

. In fulfilling occupancy eligibility, it is necessary to support facilities and infrastructure. The Bunda Asri housing complex, located in Bandarkedungmulyo, has a land area of ​​32 hectares with a planned construction of 3,000 residential units with 8 types of housing. Residential areas must have infrastructure with a minimum road width of 6 meters as stated in article 15 paragraph 3 of the 2019 Jombang Regency Regional Regulation concerning road infrastructure in residential areas. In this study, the planning used the pd T-2003 method which aims to determine the structure of the rigid pavement of the road at Bunda Asri housing. The results of this study are two types of roads, namely village roads and local roads. On rural roads, the thickness of the rigid pavement layer is 165 mm, the specification for the width of the plate is 2x3.5 m, the length of the plate is 4 m, and the tie rods use D13 threaded reinforcement (0.13 cm), 57.3 cm long, 0.75 cm spacing without using dowel spokes. Whereas for local roads, the thickness of the rigid pavement layer is 170 mm, the specifications for the width of the plate are 2x5 m, the length of the plate is 4 m, and the reinforcement thread D13 (0.13 cm) is used as tie rods, the length is 70 cm and the spacing is 0.75 cm using dowel spokes.
Analisis Waktu dan Biaya Berdasarkan Acuan Produktivitas Lapangan Menggunakan Metode Estimasi Biaya Aktual Rahmat Tri Prasetya; Totok Yulianto; Meriana Wahyu Nugroho; Titin Sundari
JURNAL RISET RUMPUN ILMU TEKNIK Vol. 2 No. 2 (2023): Oktober : Jurnal Riset Rumpun Ilmu Teknik
Publisher : Pusat riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/jurritek.v2i2.1570

Abstract

The improvement of the Cukir-Jombang road section requires heavy equipment. There is an increase in the road section at the STA. 0+000-STA. 0+936 and STA. 1+912 – STA. 2+790. In order to obtain cost and time efficiency, it is necessary to analyze the productivity of heavy equipment. This study uses the field productivity method with the aim of knowing the maximum productivity of heavy equipment and asphalt costs starting from STA 0+000 to completion. The results of this study obtained the rental time of heavy equipment for 8 hours with the number of each heavy equipment Asphalt Finisher 2 units, Dump Trucks 20 units, Tandem Roller 3 units, Pneumatic Tire Roller 2 units, Asphalt Sprayer 1 unit. Meanwhile, the cost of renting heavy equipment is IDR 4,180,000.00 for Asphalt Finisher, IDR 34,200,000 for Dump Trucks, IDR 5,700,000.00 for Tandem Rollers, IDR 3,800,000 for Pneumatic Tire Rollers, and IDR 532,000 for Asphalt Sprayers.