Perencanaan Struktur Tahan Gempa Gedung Laboratorium Fakultas Teknik Unhasy di Jombang mahbub abrori; abdiyah amudi; totok yulianto; titin sundari
Prosiding SENTIKUIN (Seminar Nasional Teknologi Industri, Lingkungan dan Infrastruktur) Vol 3 (2020): PROSIDING SENTIKUIN
Publisher : Fakultas Teknik Universitas Tribhuwana Tunggadewi

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Universitas Hasyim Asy'ari (UNHASY) is a private institute of higher education that is now developing facilities and infrastructure to improve and support the process of the lecture activities between lecturers and students so as to create a conducive atmosphere. The development of facilities and infrastructure that will be done is the construction of laboratory buildings. In this insulation aims to plan the structure of the building, the planning of structures includes beam structures, floor plates, columns, and foundations. In planning component structure modeled on the structural analysis program in 3 formulated to know the condition of structure with its original condition. In this building planning, the quality of the concrete plan is used at 30 MPa and the quality of the reinforcement uses a quality of 400 MPa for deformed reinforcement and 240 Mpa for plain reinforcement. Based on the research results have been obtained 3 types of beam edges and 2 types of main column types, needs reinforcement for beam B1 with dimension 35/50 at the focus area used 6D16 on the upper side and 5D16 on the lower side and for field area use 3D16 on the upper side and 4D16 for the bottom side. For column structures used a 12D19 reinforcement for columns K1(50/50) and 8D19 for column K2 (40/40). For the floor plate used basic reinforcement Ø 10-125 for the direction of X and Y. And on the foundation structure used 4 poles mini pile with a size of 25 X 25 cm.
Studi Perencanaan Gedung Rektorat Dengan Sistem Rangka Pemikul Momen Khusus (Studi Kasus Unhasy Tebuireng Jombang) Rahardjo, Fadjar Wahyu; Amudi, Abdiyah; Sundari, Titin; Yulianto, Totok
PUBLIKASI RISET ORIENTASI TEKNIK SIPIL (PROTEKSI) Vol 2, No 2 (2020)
Publisher : Universitas Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26740/proteksi.v2n2.p48-54

Abstract

Gedung rekorat terletak di lokasi kampus B Universitas Hasyim Asy’ari Tebuireng – Jombang yang difungsikan sebagai pusat akademik dan administrasi semua Fakultas. Rencana peningkatan bangunan gedung rektorat baru terdiri atas 7 lantai dengan ketinggian 32,40 m dan luas gedung 574 m2. Tujuan utama dilakukan penelitian agar dapat menghasilkan gambar perencanaan struktur gedung rektorat baru.Perencanaan struktur gedung rektorat baru menggunakan sistem tunggal berupa sistem rangka pemikul momen khusus (SRPMK) dan pemodelan menggunakan program aplikasi untuk menghitung momen dan reaksi dari komponen pelat lantai, tangga, balok, kolom, sloof dan poerplat dengan beban gempa desain menggunakan metode statik ekuivalen. Peraturan yang digunakan untuk perencanaan menggunakan SNI 1726:2012, SNI 2847:2013, SNI 1727:2013 dan PPIUG:1983.Hasil analisis dan desain pada gedung rektorat baru menghasilkan komponen struktur primer berupa balok B1 = 450 x 600, B3 = 350 x 500 dan kolom K1 = 700 x 700, K2 = 600 x 600 yang telah memenuhi syarat penampang untuk sistem rangka pemikul momen khusus dan mekanisme kolom kuat-balok lemah. Komponen struktur sekunder berupa pelat dengan tebal = 13 cm. Komponen struktur bawah berupa sloof SL = 400 x 800 dan poerplat P1 = 2100 x 2100 x 650 serta minipile 35 cm pada kedalaman 14 meter.
Perilaku Balok Baja I Non Prismastis (Tapered Beam) Titin Sundar; Agoes Soehardjono; Wisnumurti Wisnumurti
Rekayasa Sipil Vol 11, No 2 (2017)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1094.248 KB) | DOI: 10.21776/ub.rekayasasipil/2017.011.02.8

Abstract

The use of bending structure components becomes economical if the cross section of the beam follows the moment-diagram form. In this research is a simple beam with concentrated load in the middle of the span, so that the height of the beam is maximum in the middle of span, too. The research purpose is to obtain the bending capacity and to know the buckling behavior for optimum design. The results are compared with theoretical calculations, and ANSYS validation. Concluded of this research that the larger the tapered constant, the greater the bending capacity. The smaller the tapered angle the greater bending capacity. For the same tapered angle with higher h max, the bending capacity is also greater. The collapse occurring on this beam is the lateral torsional buckling. 
ANALISIS STATIK BEBAN GEMPA PADA PERENCANAAN STRUKTUR GEDUNG REKTORAT UNHASY TEBUIRENG JOMBANG Titin Sundari; Abdiyah Amudi; Totok Yulianto; Rahma Ramadhani
Rekayasa Sipil Vol 14, No 3 (2020)
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2020.014.03.7

Abstract

Static analysis is a simplification of dynamic analysis. Earthquake vibrations cause lateral forces at the base of the structure, and will be distributed on each floor of the building as lateral level forces. This analysis is suitable for regular building shapes. In accordance with SNI 1726: 2012, the value of the base shear force V is 103,039 kg for the X and Y directions. The displacement value is 54 mm and drift ratio ∆ < ∆a (allowable)
The Analisis Kinerja Ruas Jalan Luar Kota Di Kabupaten Jombang: Analisis Kinerja Ruas Jalan Syawaluddin Efendi Lubis; Agus Wiyono; Totok Yulianto; Titin Sundari
JURNAL TECNOSCIENZA Vol. 6 No. 1 (2021): TECNOSCIENZA
Publisher : JURNAL TECNOSCIENZA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51158/tecnoscienza.v6i1.585

Abstract

Bertumbuhnya jumlah penduduk di kabupaten jombang menjadi salah satu faktor perkembangan lalulintas. jumlah volume kendaraan yang meningkat dapat membuat kinerja ruas jalan mengalami penurunan tingkat pelayanan Dari bertumbuhnya jumlah penduduk ada beberapa faktor yaitu faktor lingkungan, faktor kenaikan pendapatan perkapita serta minat dari masyarakat untuk membeli kendaraan pribadi. Penelitian ini bertujuan untuk menganalisa kinerja ruas jalan luar kota di kabupaten jombang dan memproyeksikan pertumbuhan jumlah kendaraan 10 tahun mendatang dengan menggunakan metode MKJI 2014. Dimana hasil Analisa menunjukan pada lokasi penelitian ruas jalan Ploso-Gedeg, ruas jalan Polorejo-bts.Kediri (pare), ruas jalan Polorejo-bts.Kediri (Kandangan), memiliki nilai tingkat pelayanan A, ruas jalan Ploso-Jombang memiliki nilai tingkat pelayanan B, untuk hasil prediksi tahun ke 10 dari ke empat lokasi penelitian menunjukkan nilai tingkat pelayanan (LOS) tidak mengalami perubahan dalam nilai tingkat pelayanan.
U-DITCH PRACETAK BERDASARKAN SNI 1725: 2016 SEBAGAI STANDAR DESAIN Titin Sundari; Fatma Ayu Nuning Farida Afiatna
Rekayasa Sipil Vol. 17 No. 1 (2023): Rekayasa Sipil Vol. 17 No. 1
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2023.017.01.4

Abstract

Generally, local precast U-ditch does not yet have consistent dimensions and quality. The dimensions of the u-ditch are too large or too small with low power, making the u-ditch inefficient. This is because there is no design standard for U-ditch. This study aims to determine the strength of local precast U-ditch based on SNI 1725: 2016. The results of this analysis show that the flexural resistance of local U-ditch products is smaller than the external loads (𝝓 Mn < Mu).
PELATIHAN PEMBUATAN BIOPORI SEBAGAI PENGELOLAAN SAMPAH ORGANIK DI DESA MADIOPURO KABUPATEN JOMBANG Andhika Mayasari; Titin Sundari; Rahma Ramadhani
ABIDUMASY Vol 4 No 1 (2023): ABIDUMASY : JURNAL PENGABDIAN KEPADA MASYARAKAT
Publisher : LPPM UNIVERSITAS HASYIM ASY'ARI TEBUIRENG JOMBANG

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33752/abidumasy.v4i1.3894

Abstract

Abstrak: Pemerintah Desa Madiopuro, Kecamatan Sumobito, Kabupaten Jombang merupakan sebuah desa dengan jumlah dusun 4, jumlah RW 5 dan jumlah RT 15. Ketinggian < 500 m, dan luas daerah 1,88 km2. Salah satu permasalahan penting adalah saat musim hujan terjadi banjir dan air genangan tidak meresap ke dalam tanah. Tujuan dari penyuluhan ini adalah menyampaikan informasi kepada warga untuk menjadikan pemukiman yang ramah lingkungan, sampah dan air menjadi tanggungjawab setiap warga, serta masyarakat peduli lingkungan. Kegiatan ini dilaksanakan dengan memberikan penyuluhan dan edukasi penggalian sumur resapan (saluran biopori). Kegiatan ini dilaksanakan untuk mencapai hasil bahwa masyarakat Desa Madiopuro peduli dan memahami akan pentingnya sumber daya air dan pengelolaan sampah, serta mampu mempraktekkan cara pembuatan lubang resapan (biopori), baik disaat musim kemarau maupun musim hujan.
Studi Perencanaan Ulang Bangunan Pelimpah (Spillway)Bendungan Tiu Suntuk Kabupaten Sumbawa Barat Diah Palupi, Budi Rahayu; Titin Sundari; Meriana Wahyu Nugroho; Rahma Ramadhani
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 3 No. 2 (2023): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2023.003.02.063

Abstract

Perencanaaan bangunan pelimpah bendungan Tiu Suntuk melalui tahapan analisis hidrologi, hidrolika dan stabilitas. Analisis hidrologi dilakukan untuk mendapatkan besaran debit banjir rencana yang digunakan untuk mendesain dimensi pelimpah yang efektif. Analisis hidrolika dilakukan untuk mendapatkan desain hidrolis bangunan pelimpah dan kolam olak. Analisis stabilitas bertujuan untuk mengetahui kontrol keamanan konstruksi bendungan terhadap gaya-gaya yang bekerja. Hasil perhitungan hidrologi didapatkan debit banjir rancangan metode Nakayasu kala ulang 1000 tahun sebesar 986,8 m3/dtk. Hasil perhitungan hidrolika didapatkan lebar pelimpah efektif sebesar 39,17 m dengan tinggi muka air diatas mercu (H) = 3,05 m. Tipe kolam olak yang cocok untuk meredam energi airl impasan dari pelimpah yakni kolam olak USBR Type III dengan panjang kolam olak = 26 m, lebar 20 m dan tinggi jagaan kolam olak = 10,60 m. Setelah dilakukan analisis stabilitas pada tubuh pelimpah terhadap gaya guling dan geser dapat di nyatakan bahwa bangunan pelimpah Bendungan Tiu Suntuk aman terhadap gaya-gaya tersebut dalam keadaan kosong maupun terisi air.
Manajemen Kualitas Pekerjaan Proyek Jaringan Irigasi (Studi Kasus : Daerah Irigasi Mrican Kabupaten Jombang Tahap3) Pranayudha, Agusti Samsu Pranayudha; Meriana Wahyu Nugroho; Titin Sundari; Rahma Ramadhani
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 4 No. 1 (2024): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2024.004.01.043

Abstract

Penelitian ini melakukan evaluasi kualitas daya dukung tanah, kualitas tanah, dan kualitas beton pada proyek rehabiltas jaringan daerah irigasi Mrican Kabupaten Jombang tahap 3, Berdasarkan pengujian sondir dengan alat sondir diperoleh tekanan konus 24516,5 Kn/m2 yang artinya terdapat tanah keras. Diperoleh nilai daya dukung tanah (Q ijin) diambil nilai yang terkecil dari 5 titik yaitu 2964,22 Kn/m2 > 498,5 Kn/m2 (Qu) daya dukung aksial ultimite. yang berarti memenuhi dari beban yang bekerja pada pondasi dalam. Berdasarkan nilai pengujian sondir laboratorium nilai daya dukung tanah (Q ijin), yaitu 162,98 Kn/m2, > 140,991 Kn/m2 (Qu) daya dukung Ultimite yang artinya memenuhi dari beban yang berkerja pondasi dangkal pada kedalaman 1 m. Pada kontrol kualitas pekerjaan beton yaitu pengujian beton segar (Slump) didapatkan rata – rata 8,2 cm < ± 10 cm toleransi 2 cm SNI 7656 2012 yang artinya memenuhi, Untuk hasil pengujian kuat tekan dengan alat Hammer test didapatkan rata – rata 22,78 Mpa > 18,68 Mpa yang artinya telah memenuhi kualitas yang direncanakan, pada saat beton sudah berumur 28 hari
ANALISIS PROYEK PEMBANGUNAN JEMBATAN PELABUHAN PATIMBAN MENGGUNAKAN METODE EARNED VALUE Anita Anjani; Meriana Wahyu Nugroho; Titin Sundari; Rahma Ramadhani
JURNAL SIPIL SAINS Vol 13, No 2 (2023)
Publisher : Program Stud Teknik Sipil Fakultas Teknik Universitas Khairun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33387/sipilsains.v13i2.6488

Abstract

Abstrak: Pembangunan jembatan penghubung di Pelabuhan Patimban menjadi salah satu alternatif mobilitas yang penting karena pembangunan jembatan penghubung ini ditargetkan untuk memperbesar pasar ekspor dengan mengurangi lalu lintas yang ada di Pelabuhan Priok. Metode Earned Value dalam penelitian ini digunakan untuk menentukan estimasi biaya dan waktu penyelesaian proyek. Dari hasil analisis metode Earned Value diperoleh nilai BCWS sebesar Rp. 53.292.804.315, nilai BCWP sebesar Rp. 81.032.611.919, nilai ACWP Rp. 73.665.101.745 pada minggu ke 21 sampai minggu ke 30 dengan nilai cost variance (CV) negatif dan nilai schedule variance (SV) serta nilai cost performance index (CPI) dan nilai schedule performance index (SPI) kurang dari 1 menunjukkan bahwa pekerjaan mengalami penambahan biaya dan keterlambatan waktu dari perencanaan.  Kata kunci:  Earned Value, BCWS, BCWP, ACWP, Analisis Varian.  Abstract: The construction of a connecting bridge at Patimban Port is one of the essential mobility alternatives because the construction of this connecting bridge is targeted to enlarge the export market by reducing the existing traffic at Priok Port. The Earned Value method in this study is used to determine the estimated cost and time to complete the project. From the results of the analysis of the earned value method, the BCWS value is Rp. 53,292,804,315, the BCWP value is Rp. 81,032,611,919, ACWP value Rp. 73,665,101,745 at week 21 to week 30 with a negative cost variance (CV) value and schedule variance (SV) value as well as a cost performance index (CPI) value and a schedule performance index (SPI) value of less than 1, indicating that the work has experienced additional costs and time delays from planning. Keywords: Earned Value, BCWS, BCWP, ACWP, Analysis of Varians.