Nazili Nazili
Program Studi Teknik Sipil, Fakultas Teknik Dan Perencanaan, Universitas Ekasakti, Padang, Sumatera Barat

Published : 7 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 7 Documents
Search

Kontribusi Kompetensi Profesional dan Motivasi Kerja dalam Meningkatkan Kapasitas Guru Teknik Desain dan Bangunan di SMKN 1 Padang Nazili Nazili; Danyl Mallisza
Journal on Education Vol 5 No 2 (2023): Journal on Education: Volume 5 Nomor 2 Tahun 2023
Publisher : Departement of Mathematics Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/joe.v5i2.966

Abstract

Based on the presurvey, it was found that the development the teachers’ career of design and building engineering teacher at SMKN 1 Padang was not satisfied yet. The researcher assumed that this problem occurred because of some factors, two to them were the professional competence and work motivation. The research was aimed to reveal and analyze the contribution of the professional competence and work motivation toward the development of the teachers’ career of design and building engineering teacher at SMKN 1 Padang. This research used the quantitative approach. The population of this research was all of design and building engineering teacher at SMKN 1 Padang The result of data analysis showed that the professional competence contributed significantly (13,9%) toward the development of the teachers’ career, work motivation contributed significantly (10,1%) toward the development of the teachers’ career and the professional competence and work motivation simultaneously contributed about 20,6% toward the development of the teachers’ career. Based on the result of data analysis, it could be seen that the three hypotheses were accepted empirically. The result of the research also showed that the professional competence and work motivation were two independent variables which had positive influence on the dependent variable which was the development of the teachers’ career. Therefore, the professional competence and work motivation should be improved in order to improve the development of the teachers’ career.
EVALUASI EFISIENSI DAN BIAYA ALAT BERAT PADA PROYEK PEMELIHARAAN JALAN PHJD KSPN RUAS JALAN XYZ Nazili Nazili
Journal of Scientech Research and Development Vol 2 No 2 (2020): JSRD, December 2020
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v2i2.111

Abstract

Hasil penelitian menunjukkan bahwa alat berat yang diperlukan untuk pekerjaan galian biasa adalah Excavator Komatsu PC 200 tahun 2008, sedangkan Motor Grader Cat 120K tahun 2012, dan Vibratory Roller Case 1107EX tahun 2011 dibutuhkan untuk pekerjaan timbunan pilihan dari sumber galian. Berdasarkan perhitungan analisis biaya sewa alat, efisiensi penggunaan alat Excavator diperoleh sebesar Rp. 23.933.919,-. Sedangkan untuk sewa Motor Grader dan Vibro, diperoleh efisiensi penggunaan alat dengan total biaya sewa alat sebesar Rp. 87.142.854,- untuk pekerjaan timbunan pilihan. Alat konstruksi dirancang untuk dapat melakukan fungsi atau kegiatan dalam proses konstruksi yang membutuhkan tenaga yang berat dan sulit dilakukan secara manual. Penelitian ini dilakukan pada tahun 2020 untuk pekerjaan pemeliharaan jalan PHJD KSPN Ruas Jalan XYZ. Tujuan dari penelitian ini adalah untuk mendapatkan perhitungan perbandingan produktivitas dan biaya alat berat dari Rencana Anggaran Biaya (RAB) dengan data yang diteliti. Penggunaan alat berat yang tepat dalam perencanaan konstruksi dianggap kunci untuk efisiensi dan produktivitas yang optimal.
ANALISIS EFISIENSI DAN EFEKTIVITAS MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG XYZ Nazili Nazili
Journal of Scientech Research and Development Vol 3 No 2 (2021): JSRD, December 2021
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v3i2.112

Abstract

Penelitian ini bertujuan untuk menganalisis efisiensi dan efektivitas manajemen konstruksi pada proyek pembangunan gedung XYZ dengan menggunakan metode penelitian kuantitatif. Data kuantitatif dikumpulkan dan diproses untuk menentukan faktor-faktor yang mempengaruhi penerapan manajemen konstruksi dalam pembangunan gedung. Sementara itu, data kualitatif dikumpulkan untuk menjelaskan fenomena berdasarkan aspek non-numerik. Studi ini menemukan bahwa aspek perencanaan (X1) memiliki nilai rata-rata tertinggi sebesar 0,798, sedangkan aspek biaya (X4) memiliki nilai rata-rata terendah sebesar 0,625, menunjukkan pengaruhnya yang paling sedikit terhadap faktor manajemen konstruksi. Berdasarkan hasil tersebut, dapat disimpulkan bahwa faktor utama yang mempengaruhi kinerja manajemen konstruksi pada proyek pembangunan gedung XYZ adalah aspek perencanaan (X1), diikuti oleh aspek pengendalian (X3), organisasi (X2), lingkungan (X5), dokumentasi (X6), dan biaya (X4). Studi ini merekomendasikan agar tim manajemen konstruksi fokus pada peningkatan efektivitas mereka, terutama dalam hal kontrol kualitas dan komunikasi, untuk mencapai hasil yang lebih baik pada proyek-proyek di masa depan.
KAJIAN KEBUTUHAN AIR BERSIH PADA RUMAH SAKIT XYZ Nazili Nazili
Journal of Scientech Research and Development Vol 3 No 1 (2021): JSRD, June 2021
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v3i1.113

Abstract

Penelitian ini bertujuan untuk melakukan kajian terhadap kebutuhan air bersih di Rumah Sakit XYZ. Ketersediaan air bersih yang cukup dan berkualitas sangat penting dalam menjaga kebersihan dan kesehatan pasien, tenaga medis, dan pengunjung di rumah sakit. Penelitian ini dilakukan dengan mengumpulkan data dari beberapa departemen di Rumah Sakit XYZ, termasuk instalasi pengolahan air, sistem distribusi air, dan penggunaan air dalam kegiatan sehari-hari di rumah sakit. Data tersebut dianalisis untuk menentukan kebutuhan air bersih yang sesuai dengan standar kesehatan dan kebutuhan operasional rumah sakit. Hasil dari penelitian ini menunjukkan bahwa pemakaian air bersih yang cukup besar terjadi pada pemakaian air bersih untuk pasien. Jumlah kedatangan pasien rawat jalan mencapai 125.167 orang dan jumlah pasien rawat inap mencapai 39.252 orang, dengan total pemakaian air bersih untuk pasien sebesar 1.399.195 liter/orang/hari. Berdasarkan hasil perhitungan, kebutuhan air bersih Rumah Sakit XYZ tahun 2021 mencapai 524.345,4 m3/tahun. Hasil dari penelitian ini diharapkan dapat memberikan rekomendasi untuk perbaikan sistem air di Rumah Sakit XYZ agar dapat memenuhi kebutuhan air bersih yang optimal dan memastikan keamanan dan kesehatan pasien dan tenaga medis. Dalam mengelola kebutuhan air bersih Rumah Sakit XYZ, perlu diperhatikan aspek kualitas air bersih dan efisiensi penggunaan air agar dapat menjamin kesehatan dan keselamatan pengguna rumah sakit serta meminimalisir biaya pengelolaan air.
STUDY OF THE IMPACT OF FLOOD AND ITS MANAGEMENT ON PUBLIC INFRASTRUCTURE AND FACILITIES IN KOTO PARIK GADANG Nazili Nazili
Journal of Scientech Research and Development Vol 4 No 2 (2022): JSRD, December 2022
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v4i2.114

Abstract

Floods are a complex problem that often occurs in parts of Indonesia, especially in densely populated areas such as cities and villages. Batang Lolo District, South Solok Regency is one of the areas that is frequently flooded. Floods can cause significant losses, both in terms of material and human life, and can affect agricultural production in the area. Therefore, flood management is a serious concern. This study aims to calculate rainfall and flood discharge data for the next 25 years, as well as determine the impact caused by flooding based on information from the local community in Koto Parik Gadang Diateh District, Solok Selatan District. Based on the results of the calculation of rainfall and flood discharge, it was found that the maximum rainfall with a return period of 25 years in Batang Lolo, Koto Parik Gadang Diateh District, South Solok Regency, using the Normal Distribution, Gumbel, and Log-Pearson Type III methods are respectively 126.55 mm/hour, 6.902 mm/hour and 156.990 mm/hour. Meanwhile, the calculation of the flood discharge with a 25-year return period in Batang Lolo, Koto Parik Gadang Diateh District, Solok Selatan Regency, using the Melchoir and Hasper methods, yielded data of 1616.45 seconds/second and 445.85 seconds/second. This is expected to help in efforts to deal with flooding in the area.
EVALUASI KELANCARAN LALU LINTAS DI PERSIMPANGAN TAK BERSINYAL SIMPANG TAROK BUKITTINGGI Nazili Nazili
Journal of Scientech Research and Development Vol 4 No 1 (2022): JSRD, June 2022
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v4i1.115

Abstract

Tujuan penelitian ini Mengidentifikasi pertumbuhan populasi yang semakin tinggi dapat secara tidak langsung memengaruhi pertumbuhan suatu wilayah dan mempengaruhi perekonomian masyarakat. Namun, perkembangan ini juga dapat menyebabkan peningkatan aktivitas manusia, barang dan jasa yang pada gilirannya dapat mengakibatkan berbagai masalah termasuk masalah dalam bidang transportasi. Masalah transportasi yang umum dialami adalah ketika orang-orang melakukan kegiatan di jalan yang dilakukan secara bersamaan. Masalah ini biasanya hanya terjadi pada waktu-waktu tertentu, namun dengan meningkatnya penggunaan kendaraan, permasalahan ini dapat menjadi lebih sering terjadi, terutama jika perkembangan pengguna kendaraan tidak diiringi dengan fasilitas yang memadai. Seperti yang terjadi pada persimpangan tiga simpang Tarok di kota Bukittinggi, di mana terjadi kepadatan lalu lintas menuju pusat kota dan pusat perbelanjaan, serta sebaliknya. Metode ini melibatkan penghitungan jumlah kendaraan yang melintas pada waktu-waktu tertentu dalam sehari. Penghitungan dapat dilakukan secara manual atau menggunakan alat bantu seperti sensor lalu lintas. Penelitian ini bertujuan untuk mengevaluasi kinerja persimpangan tak bersinyal Simpang Tarok Kota Bukittinggi dalam melayani arus lalu lintas. Melalui hasil penelitian ini, diharapkan dapat dilakukan analisis untuk mengetahui kinerja dan tingkat pelayanan yang terjadi di persimpangan tersebut. Salah satu faktor yang menyebabkan terjadinya kemacetan dan kecelakaan di persimpangan tersebut adalah rendahnya kesadaran pengemudi dalam mematuhi peraturan lalu lintas, kurangnya rambu-rambu, serta tingginya aktivitas di persimpangan tersebut. Oleh karena itu, penelitian ini juga akan mengkaji faktor-faktor tersebut dan memberikan rekomendasi untuk meningkatkan kesadaran pengemudi dan efisiensi lalu lintas di Simpang Tarok.
PENINGKATAN SISTEM IRIGASI DI KABUPATEN PADANG PARIAMAN: STUDI KASUS SALURAN IRIGASI SEKUNDER DI KORONG KAMPUNG LINTANG Nazili Nazili
Journal of Scientech Research and Development Vol 5 No 1 (2023): JSRD, June 2023
Publisher : Ikatan Dosen Menulis

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56670/jsrd.v5i1.116

Abstract

Padang Pariaman merupakan sebuah kabupaten di Provinsi Sumatera Barat, Indonesia, dengan ibu kota Kabupaten Padang Pariaman yang terletak di Nagari Parit Malintang, Kecamatan Enam Lingkung. Kegiatan utama masyarakat di daerah tersebut adalah bertani. Salah satu faktor penting dalam keberhasilan kegiatan pertanian adalah tersedianya sarana dan prasarana pendukung, seperti bangunan irigasi. Korong Kampung Lintang sering mengalami kekeringan saat bercocok tanam, terutama di musim kemarau, yang berdampak pada hasil pertanian warga. Oleh karena itu, pemerintah berinisiatif memecahkan permasalahan tersebut dengan membuat saluran irigasi sekunder yang akan mengaliri lahan seluas ±114 ha. Untuk mencapai tujuan tersebut, perlu dilakukan perencanaan saluran irigasi sekunder di Korong Kampung Lintang, Kabupaten Padang Pariaman. Tujuan dari perencanaan ini adalah untuk memperoleh kebutuhan air irigasi dan merencanakan dimensi saluran irigasi sekunder. Untuk mendapatkan hal tersebut, dilakukan perhitungan analisis hidrologi dan kebutuhan air irigasi dengan menggunakan buku panduan KP 01 dan 04. Dari hasil perhitungan, diperoleh kebutuhan air irigasi maksimum terjadi pada Bulan Agustus kedua dengan debit 0,172 m3/dtk. Selain itu, ukuran dimensi saluran irigasi sekunder juga dihitung dengan hasil h = 1,649 m, b = 1,649 m, kemiringan talud = 1, tinggi jagaan air = 0,40 m, dan lebar tanggul = 1,5 m. Penelitian ini diharapkan dapat memberikan kontribusi positif bagi pengembangan pertanian di Kabupaten Padang Pariaman serta memberikan solusi dalam meningkatkan efisiensi penggunaan air irigasi secara berkelanjutan di Korong Kampung Lintang.