Time Analysis on the Kuningan Eastern Ring Road Prasetyo, Sigit Widiyatmo; Darmawan, Dicky; Firdaus, Dinda; Kusumastuti, Aryati Indah
Indonesian Journal of Advanced Research Vol. 4 No. 12 (2025): December 2025
Publisher : PT FORMOSA CENDEKIA GLOBAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55927/ijar.v4i12.15876

Abstract

This analysis aims to identify delay factors and reduce the risk of delay in construction projects using the CPM method in the construction project of the East Ring Road Kuningan. The results of the study show that common factors that can have an impact on delays include the provision of materials, workforce readiness, and schedule adjustment to weather conditions. Therefore, supervision and control on critical routes must be carried out intensively to ensure that the project can be completed on time according to plan because delays in one activity alone will have a direct impact on the overall project completion.
Irrigation Modernization Readiness in Environmental Quality Management Framework: Case Study of Range Irrigation, West Java Kusumastuti, Aryati Indah; Perkasa, Windy Dwi
Industrial and Domestic Waste Management Volume 5 - Issue 2 - 2025
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/idwm.v5i2.961

Abstract

The quality of irrigation projects in supporting sustainable development was achieved through modernization in aspects of technology, information, irrigation system management, and governance. This study aimed to develop a measurement model to evaluate irrigation modernization in supporting the quality of irrigation system management. The study was conducted in two stages. The first stage involved developing a measurement tool based on a literature review. The second stage involved testing the measurement tool to evaluate the modernization of irrigation network quality using a case study of the Rentang Irrigation Area in West Java. The evaluation was based on the preferences of staff from 14 construction service providers involved in the Rentang irrigation network improvement project. Data were analyzed using Confirmatory Factor Analysis (CFA) and multiple linear regression analysis. The results identified several important elements in the modernization of irrigation network quality, including the quality of water supply reliability, irrigation infrastructure, irrigation management systems, irrigation management institutions, and human resources. The modernization of irrigation network quality comprising improvements in water supply reliability, irrigation network reliability, irrigation management systems, irrigation management institutions, and human resources, had a positive effect on irrigation system performance. The findings provide implications for developing an irrigation modernization readiness model within a quality management framework.
Measuring Supply Chain Performance on Residential Construction Faqih Ramadhan; Muhamad Rizki; Nazrudin Fadilah; Aryati Indah Kusumastuti
Interdiciplinary Journal and Hummanity (INJURITY) Vol. 5 No. 2 (2026): Injurity: Interdiciplinary Journal and Humanity
Publisher : Pusat Publikasi Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58631/injurity.v5i2.1517

Abstract

Supply chain management in residential construction projects requires a performance measurement system that supports effective evaluation, control, and decision-making. This study aims to analyze the effect of supply chain performance measurement on the performance of the housing development supply chain. The research was designed using an explanatory quantitative approach with a structured, questionnaire-based survey method. Data were collected cross-sectionally from 50 respondents who are the main actors in the housing supply chain, including project managers, contractors, subcontractors, procurement staff, and material suppliers. Supply chain performance measurement is operationalized through the dimensions of cost efficiency, timeliness, quality, flexibility, collaboration, risk management, and sustainability. Data were analyzed using descriptive statistics and linear regression analysis with the help of SPSS. The results show that supply chain performance measurement has a positive and significant effect on the performance of the housing development supply chain (? = 0.791; p < 0.001), with a coefficient of determination (R²) value of 0.651. These findings indicate that approximately 65.1% of the variations in housing supply chain performance can be explained by supply chain performance measurement. This research makes a theoretical contribution by positioning supply chain performance measurement as a strategic construct tested inferentially, rather than merely an evaluative tool. Practically, the results confirm the importance of implementing a structured supply chain performance measurement system to improve the operational performance of housing projects. All data presented are processed survey data, allowing replication and retesting in different research contexts.
Cbr Values in the Sub-Grade Layer of Reclamation Fill (Case Study: Patimban Port Project Package 6) Elza Timur Maindah; Herry Hermawan; Aryati indah kusumastuti
Greenation International Journal of Engineering Science Vol. 4 No. 1 (2026): (GIJES) Greenation International Journal of Engineering Science (March - May 20
Publisher : Greenation Research

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/gijes.v4i1.881

Abstract

Reclamation work on port projects requires embankment materials with adequate bearing capacity, particularly in soaked areas that are saturated with water and potentially subject to soil strength degradation. In the Patimban Port Development Project (Phase 1–2) Package 6: Container Terminal No. 2 Construction, the use of sand as reclamation embankment requires further assessment using the California Bearing Ratio (CBR) parameter to ensure the soil's suitability as a subgrade layer. Variations in soil characteristics due to the layered embankment process and the potential for liquefaction are important factors influencing soil stability. This study aims to determine the suitability of the subgrade layer's CBR value to existing theory, analyze the effect of the reclaimed material's CBR value on subgrade performance, and assess the suitability of the reclaimed soil as a subgrade layer based on CBR technical parameters. The research method used is quantitative with a descriptive approach. Data were obtained through laboratory testing and field testing using Dynamic Cone Penetration (DCP) at 20 test points. The results of the study indicate that: (1) the CBR value of the subgrade layer is in accordance with existing theory, where all values ​​are above the minimum limit of 6% and follow the theoretical pattern in the form of a decrease in the saturated layer and an increase in depth due to overburden pressure; (2) the CBR value of the reclaimed material has a direct effect on subgrade performance, where a lower CBR value in a particular layer becomes a controlling layer that affects the potential for deformation and overall soil stability; and (3) the reclaimed soil meets the technical requirements as a subgrade layer, with CBR values ​​ranging from 8.98% to 22.64% at various depths, making it suitable for use as a supporting layer for construction.
Integrasi Penerapan Prinsip Lean Construction dan Sirkular 3R dalam Pengelolaan Material untuk Mewujudkan Konstruksi Berkelanjutan Salsa Ameliya Putri; Aryati Indah Kusumastuti
ARMADA : Jurnal Penelitian Multidisiplin Vol. 4 No. 7 (2026): ARMADA : Jurnal Penelitian Multidisplin, July 2026
Publisher : LPPM Sekolah Tinggi Ilmu Ekonomi 45 Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55681/armada.v4i7.3099

Abstract

Penelitian ini bertujuan mengevaluasi penerapan Lean Construction dan prinsip 3R (Reduce, Reuse, Recycle) dalam pengelolaan material serta kontribusinya terhadap konstruksi berkelanjutan pada Proyek Pembangunan Gedung Parkir dan Fasilitasnya (Tower B) RSK Dharmais. Penelitian menggunakan pendekatan evaluatif dengan metode deskriptif kuantitatif berbasis studi kasus. Data diperoleh dari dokumen aktual proyek dan dianalisis melalui sistem scoring berdasarkan indikator Lean Construction dan 3R. Hasil penelitian menunjukkan bahwa penerapan Lean Construction mencapai 93,75% dan termasuk kategori sangat tinggi. Indikator Waste Control & Reduction, Process Transparency, dan People Involvement memperoleh nilai 100%, sedangkan Planning & Continuous Improvement serta Flow Efficiency & Pull System masing-masing mencapai 87,5% dan 83%. Penerapan prinsip 3R mencapai 83%, dengan pelaksanaan penuh pada Reduce dan Reuse, sementara Recycle masih terbatas. Lean Construction mendukung penerapan 3R melalui pengurangan pemborosan, peningkatan perencanaan, pengendalian aliran material, dan optimalisasi penggunaan kembali material untuk mendukung konstruksi berkelanjutan.
Analisis Efektivitas Manajemen Keselamatan dan Kesehatan Kerja (K3) pada Proyek Patimban Port Development Project Phase 1-2 Hilaliyah Nurliani; Aryati Indah Kusumastuti
ARMADA : Jurnal Penelitian Multidisiplin Vol. 4 No. 7 (2026): ARMADA : Jurnal Penelitian Multidisplin, July 2026
Publisher : LPPM Sekolah Tinggi Ilmu Ekonomi 45 Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55681/armada.v4i7.3100

Abstract

Penelitian ini bertujuan menganalisis faktor-faktor Keselamatan dan Kesehatan Kerja (K3), mengevaluasi efektivitas manajemen K3 berdasarkan identifikasi risiko, penggunaan Alat Pelindung Diri (APD), dan fasilitas pendukung, serta merumuskan upaya perbaikan pada Patimban Port Development Project Phase 1–2. Penelitian menggunakan metode deskriptif kuantitatif melalui observasi lapangan, wawancara, telaah dokumen, dan kuesioner terhadap 44 pekerja di area berth. Data dianalisis menggunakan statistik deskriptif, uji instrumen, uji asumsi klasik, regresi linier berganda, uji hipotesis, dan koefisien determinasi. Hasil penelitian menunjukkan bahwa identifikasi risiko K3 berpengaruh positif dan signifikan terhadap efektivitas manajemen risiko (t = 5,617; p < 0,001), demikian pula penggunaan APD (t = 2,937; p = 0,005). Kedua variabel secara simultan menjelaskan 69,7% variasi efektivitas manajemen risiko. Meskipun penerapan K3 tergolong baik, pengawasan APD, disiplin pekerja, dan mitigasi risiko maritim perlu diperkuat melalui pelatihan, pembaruan penilaian risiko, dan pengawasan konsisten.
Implementation of a Geographic Information System in Monitoring The Implementation of Housing Construction Bukhori Bukhori; Aryati Indah Kusumastuti
Journal of Green Science and Technology Vol 7 No 3 (2023): Journal of Green Science and Technology Vol.7 No.3 Special Edition : Applied scie
Publisher : Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jgst.v7i3.88

Abstract

Building the 864-unit housing complex was a significant construction undertaking. Within an implementation period of 18 months and a project area of approximately 34 hectares, this project demanded efficient management to control the time and budget that had been set. To achieve this goal, it is necessary to implement effective planning, organization, management and resource allocation processes. This process aims to break down project management into simpler tasks or activities, provide time estimates for each task, and continuously monitor their progress. Although conventional planning tools such as Primavera and Msproject can provide a time representation of the tasks to be performed, they are not yet able to provide spatial or geographic monitoring of these tasks within the scope of the project. By integrating Geographic Information Systems (GIS), this project can gain additional benefits. GIS allows identifying data about the progress of construction tasks, and then presenting them in the form of maps. This not only visualizes overall progress graphically and geographically, but also makes it easy to extract useful summaries to support project decision making. With GIS, construction project monitoring not only becomes more efficient, but also more up-to-date and relevant to the scope of the project involving various dispersed structures. It is hoped that GIS integration can improve project management control and optimize the final results of the construction of the 864 housing complexes.