Manajemen Komunikasi Proyek Konstruksi di Masa Pandemi Covid-19 Indra Jaya; Gina Cynthia Raphita Hasibuan; Dian Morfi Nasution
TEKNIK Vol. 44, No. 1 (2023): May 2023
Publisher : Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/teknik.v44i1.45512

Abstract

Pejabat Pembuat Komiten (PPK) merupakan utusan dari pemerintah dalam menjalankan kegiatan konstruksi mulai dari perencanaan, pelaksanaan, dan pengawasan. Dalam menjalankan kegiatannya diperlukan suatu manajemen komunikasi yang baik agar seluruh kegiatan proyek dapat dipertanggungjawabkan dengan baik. Penelitian ini menggunakan pendekatan kualitatif, menggunakan metode wawancara mendalam semi-terstruktur (semi-structured in-depth interview) kepada PPK tentang bagaimana sistem manajamen komunikasi di saat sebelum pandemi dan saat pandemi sedang berlangsung. Permasalahan yang ditemukan saat ini adalah sistem manajemen komunikasi proyek belum terlaksana dengan baik. Hal ini terbukti dengan adanya hal-hal yang tidak sesuai harapan PPK ketika menghadapi dan mengarahkan penyedia barang dan jasa. Untuk mendukung sistem manajemen komunikasi yang baik diperlukan suatu sistem terintegrasi mulai dari pembuatan firma/perusahaan, verifikasi lapangan dalam pemilihan penyedia jasa, evaluasi perpanjangan izin perusahaan. Ini bertujuan agar pengguna jasa mendapatkan calon penyedia jasa yang tepat dan, sesuai harapan. Untuk itu diperlukan sistem informasi teknologi yang mampu mengintegrasikan seluruh mekanisme yang dibuat. Selain itu diperlukan payung hukum terkait adanya usulan dan mekanisme baru yang dibuat.
The Impact of COVID-19 Pandemic on The Construction Projects in Indonesia: Identifying the Risks from the Stakeholders’ Perspective Gina Cynthia Raphita Hasibuan; Indra Jaya; M. Thoriq Al Fath
International Journal of Architecture and Urbanism Vol. 7 No. 2 (2023): International Journal of Architecture and Urbanism
Publisher : Talenta Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/ijau.v7i2.13510

Abstract

Covid-19, which is declared as a pandemic by the World Health Organisation (WHO) on March 11 2020 has significant impacts in many sectors around the world. Nevertheless, there is a lack of research which analyses the impact of Covid-19 in the construction projects risks in developing countries. Given the lack of research related to the construction projects risks due to Covid-19, the overall aim of the study is to identify and classify the risk in a construction project as a result of Covid-19 Pandemic in Indonesia. The methodology which is used in this study is by implementing the questionnaire approach with the targets from the related construction industry stakeholders. The findings identified five risks which have the highest possibility to occur in a construction project as a result of Covid-19, in which the highest risk is delayed funding on construction project design (Score: 0,2523) while the lowest risk is unknown threat or vandalism from the neighborhood gangster (score: 0,0136). Further study will focus on the way in which we could develop a new framework model for risk management and preventive measures of these risks adjusted to Covid-19 impact.
Quantity Take Off Comparison Using Building Information Modelling (BIM) with Autodesk Revit Software and Traditional Method Fredrick Jeremia Simatupang; Gina Cynthia Raphita Hasibuan; Indra Jaya; Syahrizal; Rezky Ariessa Dewi; Gea Geby Aurora Syafridon
International Journal of Architecture and Urbanism Vol. 8 No. 2 (2024): International Journal of Architecture and Urbanism
Publisher : Talenta Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32734/ijau.v8i2.16146

Abstract

Nowadays, the development of technological advances and information has grown rapidly in various aspects including the development of construction projects. One of the construction technology innovations is Building Information Modeling (BIM). Obstacles that are often or commonly encountered in the implementation of construction projects are delays or delays in work, rework, and inaccuracies in the calculation of the required quantity. The problems caused by conventional methods can be minimized by utilizing construction technology, namely BIM at the construction stage. This research aims to compare the volume of traditional (conventional methods) and BIM methods. This research uses a comparative research method and quantitative approach. In this research, a comparative analysis between conventional methods and BIM methods is carried out. Based on the data analysis that has been carried out, it is found that the BIM results are smaller than the conventional project results with a percentage comparison difference of 8.61% for the volume of concrete work, and 6% for the weight of reinforcement.