Claim Missing Document
Check
Articles

Found 2 Documents
Search

Penentuan Waktu Istirahat Untuk Meminimalisir Kelelahan Petani Menggunakan Metode Fisiologi Putri Widia Agustina; Meri Andriani; Dewiyana
JURNAL ILMIAH TEKNIK INDUSTRI DAN INOVASI Vol. 1 No. 3 (2023): Juli
Publisher : CV. ALIM'SPUBLISHING

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59024/jisi.v1i3.287

Abstract

The work of farmers is prone to the risk of health problems such as pain in the joints and fatigue. The research problem is that farmers complain of rapid fatigue, so the purpose of the study is to determine the physiological workload on rice farmers when planting rice and determine the best time for farmers. Methods used are Cardiovascular Load (%CVL) and Energy Consumption to determine the weight of the workload of farmers, and rest time to determine the length of rest. Results and discussion, %CVL is 7 people with action no fatigue and 46 people with action needed improvement. Energy consumption is the smallest percentage of 4.14 kcal / minute with a mild classification and the largest percentage of 6.14 kcal / minute with a moderate classification. In the second measurement, the smallest percentage was 4.49 kcal/min with a mild classification, and the largest percentage was 6.90 kcal/min with a moderate classification. In the third measurement, the smallest percentage was 3.96 kcal/min with a mild classification, and the largest percentage was 6.39 kcal/min with a moderate classification. The smallest rest time was 12.65 minutes and the largest rest time was 120.39 minutes. In conclusion, the mean %CVL was 13.21% with no fatigue, 86.79% with improvement needed. Average energy consumption with mild classification with a percentage of 4.21% and moderate classification with a percentage of 6.26%. The smallest rest time is 12.65 minutes while the largest is 120.39 minutes
IMPLEMENTATION OF AN ENTERPRISE RESOURCE PLANNING (ERP)-BASED WORKSHOP INVENTORY MANAGEMENT INFORMATION SYSTEM AT PT. ANUGRAH FAJAR REZEKI Dewiyana; Nurmalawati; Muhammad Abdul Rahman
Multidiciplinary Output Research For Actual and International Issue (MORFAI) Vol. 6 No. 1 (2026): Multidiciplinary Output Research For Actual and International Issue
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54443/morfai.v6i1.4876

Abstract

Anugrah Fajar Rezeki is a palm oil processing company located in Merbau Dua village, Birem Bayeun sub-district, East Aceh Regency. This research focuses on designing a workshop inventory management information system . This research aims to design a system that is integrated with the workshop inventory management information system using Enterprise Resource Planning (ERP) and implementing the ERP system. The conclusion of the research is that this workshop inventory management information system can help the company, where the previous company policy in recording goods management can only be done one by one manually so it takes a long time, after implementing the ERP system the data is easier to input and is immediately updated automatically for real-time goods management so it does not take a long time . In addition, the implementation of this workshop inventory management information system is very helpful in the process of collecting, managing data and making better decisions so as to increase efficiency, effectiveness, and development in operational processes at PT. Anugrah Fajar Rezeki.