MOTIVASI PEKERJA TERHADAP PENGGUNAAN ALAT PELINDUNG DIRI (APD) PADA PROYEK GEDUNG APARTEMEN THE UMALAS SIGNATURE IDA BAGUS GEDE INDRAMANIK; JUNIADA PAGEHGIRI; WAGE SUARTA
GANEC SWARA Vol 17, No 3 (2023): September 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i3.509

Abstract

BPJS Employment data revealed that work accidents reached 153,044 cases throughout 2020. Based on the location of the incident, in the work environment work accidents occur as many as 68.5 percent of cases. The provision and use of personal protective equipment is an effort to improve occupational safety and health. Work experience and selection behavior of PPE types affect adherence to PPE use. From the results of an initial survey conducted on August 19, 2022 using the interview method with contractor staff at The Umalas Signature Project in charge of K3, during the project which has been approximately 5 months, no training on K3 has been held for workers even though work accidents are dominant because construction workers are careless and undisciplined in the use of personal protective equipment. There are three factors that can affect the use of personal protective equipment from workers, namely psychological factors, individual factors, and organizational factors. Data was collected by questionnaire and interviews with 39 respondents, then the data was analyzed using quantitative descriptive data analysis methods and scoring analysis. Data analysis was conducted to determine the most dominant factors influencing worker motivation in using personal protective equipment (PPE) and to measure what is the level of motivation of workers in using personal protective equipment (PPE) based on individual, psychological, and organizational factors. The results of this study are the most dominant factors influencing worker motivation in using personal protective equipment (PPE) are organizational factors in the FO 3 statement item with a percentage value of 95% and an average score of 4.5 (very strong). Then based on multiple linear regression analysis tests, Individual Factors showed an influence value of 44.4%. Psychological factors show an influence value of 41.4%. Organizational factors showed an influence value of 67.1%. 
PENERAPAN PENGADAAN MATERIAL UDITCH DENGAN SISTEMMATERIAL REQUIREMENT PLANNING (MRP) PADA PROYEKKONSTRUKSI JALAN.(Study Kasus: Pembangunan Konstruksi Jalan Batas KotaSingaraja - Mengwitani Titik 7A, 7B, 7C dan Titik 8) Made Agus Pramana; I Komang Alit Astrawan Putra; I Wayan Diasa; Ni Ketut Sri Astati Sukawati; Juniada Pagehgiri
Jurnal Ilmiah Vastuwidya Vol. 6 No. 2 (2023): Jurnal Ilmiah Vastuwidya
Publisher : Universitas Mahendradatta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam tahap perencanaan proyek konstruksi, terdapat kegiatan perencanaan pengadaanmaterial yang akan digunakan pada proyek konstruksi tersebut. Perencanaan tersebut harusdirencanakan dengan baik mengingat ketersediaan material yang digunakan akan sangatberpengaruh terhadap efisiensi biaya dan waktu dalam proses konstruksi yang akan dilakukan. Salahsatu cara yang dapat digunakan dalam perencanaan kebutuhan material adalah dengan melakukananalisis Material Requirements Planning (MRP). Material Requirements Planning (MRP). ProyekPembangunan Konstruksi Jalan Batas Kota Singaraja – Mengwitani Titik 7A, 7B, 7C dan Titik 8 dibagimenjadi 4 titik pekerjaan yaitu titik 7A, titik 7B, titik 7C dan titik 8. Semua titik tersebut memilikibangunan pelengkap uditch sebagai saluran drainase. Uditch yang dipakai adalah tipe DS 4 yangmerupakan uditch dengan dimensi saluran (DS) 1000 x 1000 x 1200 mm. Dalam analisis MaterialsRequirement Planning (MRP), ada beberapa teknik yang bisa dipakai yaitu: Lot for lot merupakansebuah teknik penentuan ukuran lot yang menghasilkan apa yang diperlukan untuk memenuhirencana secara tepat. Economic Order Quantity (EOQ) adalah sebuah teknik statistic yangmenggunakan rata-rata (seperti permintaan rataan satu tahun). Dari hasil analisis diperoleh efektivitaskebutuhan material uditch DS 4 sepanjang penanganan konstruksi dari titik 7A, 7B, 7C dan titik 8.Melalui analisis Lot for lot (LOL) dan teknik Economic Order Quantity (EOQ) diperoleh selisih biayayang sama terhadap biaya actual dalam Sembilan minggu pelaksanaan. sedangkan teknik EconomicOrder Quantity (EOQ) pada minggu ke 34 sampai dengan minggu ke 42 memiliki selisih biaya lebihbesar terhadap biaya actual dibandingkan dengan teknik Lot for lot (LOL)