Claim Missing Document
Check
Articles

Found 6 Documents
Search

Analysis Of Factors Affecting The Effectiveness Of Handling Over-Dimension And Overloading (Odol) In East Java At Uppkb Trosobo Sidoarjo And Uppkb Singosari Malang I Made Buda Atmajaya; Haris Muhammadun; Wateno Oetomo
Jurnal Ekonomi Teknologi dan Bisnis (JETBIS) Vol. 2 No. 8 (2023): JETBIS : Journal Of Economics, Technology and Business
Publisher : Al-Makki Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57185/jetbis.v2i8.51

Abstract

The problem of Overdimension and Overloading (ODOL) freight transportation has become a national issue.  Various impacts caused by ODOL freight transportation include a decrease in vehicle speed, a decrease in road technical life, loss of road maintenance budget, vehicle damage, and the occurrence of traffic accidents on the road. East Java Province has a fairly high economic activity by using freight transportation in various conditions including Overdimension and Overloading. The Ministry of Transportation through the UPPKB Service Unit throughout East Java has made various efforts to handle ODOL freight transportation, but the level of violations of freight transportation still occurs. This study aims to determine the factors that affect the effectiveness of handling Overdimension and Overloading (ODOL) in freight transportation so that it can provide recommendations for appropriate ODOL handling. The data collection method used interviews and questionnaires to Korsatpel, UPPKB Operational Staff, and freight transport drivers. While the analysis method used fishbone diagram analysis and multiple linear regression analysis using field data. Based on the results of the study, it is known that the dominant factors that affect the effectiveness of handling Overdimension and Overloading (ODOL) in freight transportation are the enforcement of Tilang (X1) and Transfer of Cargo / Transfer of Excess Load (X3) with the value of coefficient determination at UPPKB Trosobo and Singosari of 96.1% and 92.3%. The handling recommendations given are the need to increase ticket fines and provide transportation services for excess cargo in the form of vehicles and transportation personnel as well as forklifts and cranes at the UPPKB Satpel to move heavy loads.
Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar Irwansyah Digma Pratama; Laksono Djoko Nugroho; Haris Muhammadun
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.478

Abstract

The installation of the Baggage Handling System (BHS) at Sultan Hasanuddin International Airport, Makassar, faces challenges related to cost and time inefficiencies, particularly delays in project completion. This study aims to evaluate these inefficiencies by applying the Earned Value Method (EVM) to assess project performance and identify areas for improvement. Utilizing EVM metrics, the research identifies that the Schedule Performance Index (SPI) is below 1, indicating a delay in the project timeline, with the actual duration extending to 556 calendar days compared to the planned 546 days. This delay underscores the need for a more robust project management approach. The study employs the Critical Path Method (CPM) in conjunction with Microsoft Project to improve scheduling accuracy, alongside recommendations for project acceleration using the Crashing Program method. The findings highlight that early implementation of EVM can help mitigate discrepancies in cost and time, enabling better control and monitoring throughout the project lifecycle. The study concludes that integrating advanced scheduling techniques and real-time performance metrics is essential to achieving efficiency and minimizing delays in similar infrastructure projects.
Project Performance Analysis Based on Earned Value Method on Infrastructure & Infrastructure Improvement of Yohanis Kapiyau Timika Airstrip Nazaruddin Nazaruddin; Laksono Djoko Nugroho; Haris Muhammadun
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.479

Abstract

This study analyzes the performance of construction projects using the Earned Value Method (EVM) on the Infrastructure and Facilities Improvement Project at Yohanis Kapiyau Airbase in Timika. Utilizing key performance indicators such as Cost Variance (CV), Cost Performance Index (CPI), Schedule Variance (SV), and Schedule Performance Index (SPI), the research evaluates cost and time deviations to provide a comprehensive understanding of project performance. EVM offers precise insights into the project's current status, including estimates for total costs and completion timelines, which are critical for effective decision-making and ensuring adherence to project plans. The findings demonstrate that EVM is a reliable tool for accurately monitoring and managing construction projects, enabling stakeholders to identify inefficiencies and implement corrective measures in a timely manner. By providing an in-depth evaluation of cost efficiency and schedule performance, the study contributes to the broader application of EVM in enhancing construction project management. This research is expected to benefit academics by advancing theoretical knowledge, assist contractors in optimizing project execution, and inform public stakeholders on best practices for infrastructure development, ultimately contributing to more effective and efficient management of construction projects in Indonesia.
EVALUATION OF PROJECT COST AND TIME USING EARNED VALUE APPROACH: A CASE OF MILITARY INFRASTRUCTURE PROJECT Nazaruddin Nazaruddin; Laksono Djoko Nugroho; Haris Muhammadun
Interdiciplinary Journal and Hummanity (INJURITY) Vol. 4 No. 1 (2025): INJURITY: Journal of Interdisciplinary Studies.
Publisher : Pusat Publikasi Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58631/injurity.v4i1.1390

Abstract

This research aims to optimize the performance of construction projects at Yohanis Kapiyau Airbase so that the work can be completed on time, meet quality standards, and in accordance with the predetermined budget. This research addresses key questions regarding the evaluation of project cost and time control, specifically examining project cost performance through Cost Variance and Cost Performance Index (CPI) indicators, as well as project time performance using Schedule Variance (SV) and Schedule Performance Indices (SPI) indicators. The implementation of the Earned Value Management (EVM) method has proven its effectiveness as an analytical instrument that integrates cost and cost dimensions comprehensively. Through the comprehensive analysis that has been conducted, the method successfully identified with precision that the fundamental challenge of the project lies in the aspect of time management, while cost management shows excellent efficiency. It can be concluded that the achievement of excellent cost efficiency has a positive impact on the overall project performance. Based on the results of the comprehensive evaluation, several strategic recommendations can be formulated for the optimization of project implementation in the future.
PROJECT COST ANALYSIS THROUGH EARNED VALUE METHOD ON THE INSTALLATION OF BAGGAGE HANDLING SYSTEM (BHS) PPUPG (PROJECT CASE STUDY AT SULTAN HASANUDIN INTERNATIONAL AIRPORT MAKASSAR) Irwansyah Digma Pratama; Laksono Djoko Nugroho; Haris Muhammadun
Interdiciplinary Journal and Hummanity (INJURITY) Vol. 4 No. 1 (2025): INJURITY: Journal of Interdisciplinary Studies.
Publisher : Pusat Publikasi Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58631/injurity.v4i1.1391

Abstract

This research is aimed at analyzing the cost performance of the Ppupg Baggage Handling System (BHS) Installation project at Sultan Hasanudin Makassar International Airport. This research focuses on two key questions: (1) how to assess cost performance during monitoring using indicators such as Cost Variance and Cost Performance Index, and (2) what the estimated total project cost will be upon completion, specifically through the Estimated All Completion (EAC). The research is conducted from October Week 2 to the field in January 2025 which began in stages from research preparation, initial survey, literature review, data collection, proposal preparation, data analysis, and thesis preparation. The research was conducted in the form of observations, namely, the PPUPG baggage handling system installation project. The study was conducted using a multidisciplinary approach. The analysis of the EAC serves to enhance understanding of projected total project costs, allowing for better financial forecasting and budget management. The findings from this study can help practitioners optimize budgeting processes and improve project outcomes, thereby advancing the overall understanding of cost management in infrastructure projects. Future research can contribute to more effective cost management strategies and improved project performance outcomes by integrating findings from both CPM analysis and comprehensive literature.
Analysis Of Factors Affecting The Effectiveness Of Handling Over-Dimension And Overloading (Odol) In East Java At Uppkb Trosobo Sidoarjo And Uppkb Singosari Malang I Made Buda Atmajaya; Haris Muhammadun; Wateno Oetomo
Jurnal Ekonomi Teknologi dan Bisnis (JETBIS) Vol. 2 No. 8 (2023): Jurnal Ekonomi, Teknologi dan Bisnis
Publisher : Al-Makki Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57185/jetbis.v2i8.51

Abstract

The problem of Overdimension and Overloading (ODOL) freight transportation has become a national issue.  Various impacts caused by ODOL freight transportation include a decrease in vehicle speed, a decrease in road technical life, loss of road maintenance budget, vehicle damage, and the occurrence of traffic accidents on the road. East Java Province has a fairly high economic activity by using freight transportation in various conditions including Overdimension and Overloading. The Ministry of Transportation through the UPPKB Service Unit throughout East Java has made various efforts to handle ODOL freight transportation, but the level of violations of freight transportation still occurs. This study aims to determine the factors that affect the effectiveness of handling Overdimension and Overloading (ODOL) in freight transportation so that it can provide recommendations for appropriate ODOL handling. The data collection method used interviews and questionnaires to Korsatpel, UPPKB Operational Staff, and freight transport drivers. While the analysis method used fishbone diagram analysis and multiple linear regression analysis using field data. Based on the results of the study, it is known that the dominant factors that affect the effectiveness of handling Overdimension and Overloading (ODOL) in freight transportation are the enforcement of Tilang (X1) and Transfer of Cargo / Transfer of Excess Load (X3) with the value of coefficient determination at UPPKB Trosobo and Singosari of 96.1% and 92.3%. The handling recommendations given are the need to increase ticket fines and provide transportation services for excess cargo in the form of vehicles and transportation personnel as well as forklifts and cranes at the UPPKB Satpel to move heavy loads.