Claim Missing Document
Check
Articles

Found 20 Documents
Search

Metode Hidrograf Satuan Sintetis (HSS) Laksono-Erub untuk Banjir Rancangan pada Sungai Plumbon Laksono Djoko Nugroho; Moh Abduh
Media Teknik Sipil Vol. 21 No. 1 (2023): Februari 2023
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v21i1.14618

Abstract

Sungai Plumbon adalah sungai utama dalam DAS Plumbon yang terletak di Kota Semarang, Provinsi Jawa Tengah. DAS Plumbon memiliki luas ± 32 km2 dan panjang sungai utamanya ± 20 km. Pada sungai ini, sering terjadi banjir dan air melimpas di atas tanggul hingga menyebabkan tanggul jebol. Dengan kondisi yang ada, diperlukan metode analisis debit banjir rancangan terbaik pada Sungai Plumbon, sehingga perencanaan bangunan pada Sungai Plumbon sesuai dengan kondisi aktual dilapangan. Adapun metode Hidrograf Satuan Sintetik (HSS) yang digunakan adalah metode HSS Nakayasu, Synder, Gama I, Laksono-Erub dan perhitungan Debit banjir Rancangan dengan debit yang tercatat pada Bendung Plumbon. Dari hasil perhitungan dan analisa debit banjir rancangan pada DAS Plumbon, didapatkan metode HSS Laksono-Erub sebagai metode yang terbaik berdasarkan penyimpangan yang terkecil dari data debit yang tercatat pada Bendung Plumbon selama 10 tahun.
Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar Irwansyah Digma Pratama; Laksono Djoko Nugroho; Haris Muhammadun
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.478

Abstract

The installation of the Baggage Handling System (BHS) at Sultan Hasanuddin International Airport, Makassar, faces challenges related to cost and time inefficiencies, particularly delays in project completion. This study aims to evaluate these inefficiencies by applying the Earned Value Method (EVM) to assess project performance and identify areas for improvement. Utilizing EVM metrics, the research identifies that the Schedule Performance Index (SPI) is below 1, indicating a delay in the project timeline, with the actual duration extending to 556 calendar days compared to the planned 546 days. This delay underscores the need for a more robust project management approach. The study employs the Critical Path Method (CPM) in conjunction with Microsoft Project to improve scheduling accuracy, alongside recommendations for project acceleration using the Crashing Program method. The findings highlight that early implementation of EVM can help mitigate discrepancies in cost and time, enabling better control and monitoring throughout the project lifecycle. The study concludes that integrating advanced scheduling techniques and real-time performance metrics is essential to achieving efficiency and minimizing delays in similar infrastructure projects.
Project Performance Analysis Based on Earned Value Method on Infrastructure & Infrastructure Improvement of Yohanis Kapiyau Timika Airstrip Nazaruddin Nazaruddin; Laksono Djoko Nugroho; Haris Muhammadun
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.479

Abstract

This study analyzes the performance of construction projects using the Earned Value Method (EVM) on the Infrastructure and Facilities Improvement Project at Yohanis Kapiyau Airbase in Timika. Utilizing key performance indicators such as Cost Variance (CV), Cost Performance Index (CPI), Schedule Variance (SV), and Schedule Performance Index (SPI), the research evaluates cost and time deviations to provide a comprehensive understanding of project performance. EVM offers precise insights into the project's current status, including estimates for total costs and completion timelines, which are critical for effective decision-making and ensuring adherence to project plans. The findings demonstrate that EVM is a reliable tool for accurately monitoring and managing construction projects, enabling stakeholders to identify inefficiencies and implement corrective measures in a timely manner. By providing an in-depth evaluation of cost efficiency and schedule performance, the study contributes to the broader application of EVM in enhancing construction project management. This research is expected to benefit academics by advancing theoretical knowledge, assist contractors in optimizing project execution, and inform public stakeholders on best practices for infrastructure development, ultimately contributing to more effective and efficient management of construction projects in Indonesia.
Alternative Design Solutions For Flexible And Rigid Pavements In The Sampang-Ketapang Road Widening Project (Section 113) Muhammad Zainal Muttaqin; Esti Wulandari; Laksono Djoko Nugroho
Journal of Social Science Vol. 6 No. 1 (2025): Journal of Social Science
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Sampang-Ketapang road segment (Link 113) plays a pivotal role in regional connectivity, supporting economic and social activities in Sampang Regency, a hub for salt and tobacco production. This study compares two pavement design alternatives: flexible pavement using Class A aggregate with a thickness of 200 mm and rigid pavement with a flexural strength of 4.5 MPa and a thickness of 300 mm. The analysis evaluates cost efficiency, implementation time, and suitability for the increasing traffic demands of the region. The results show that flexible pavement requires an investment of IDR 12.8 billion and a 7-month construction duration, while rigid pavement demands IDR 19.5 billion and a 9-month duration. Flexible pavement offers lower initial costs and shorter implementation time, making it a more feasible option for segments with moderate traffic. However, it requires more frequent maintenance, increasing long-term expenses. Conversely, rigid pavement is more durable, with minimal maintenance costs, but has higher initial costs and a longer construction timeline. Considering the economic and technical aspects, flexible pavement is recommended as the optimal solution for this project due to its cost-effectiveness and shorter timeline, ensuring efficient resource utilization. Strategic implementation combining both pavement types is also proposed, with flexible pavement for moderate traffic areas and rigid pavement for segments with heavy traffic. This approach balances cost efficiency, implementation time, and long-term durability, supporting the sustainable development of road infrastructure in Sampang Regency
Analysis of Flood Discharge and Water Level of the Babon River in Semarang Fakhrurrozi, Muhamad; Wulandari, Esti; Djoko Nugroho, Laksono
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 10 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i10.284

Abstract

This study aims to determine the toll rates desired by the people of Gresik Regency based on the value of Ability to Pay (ATP) and Willingness to Pay (WTP) on the Krian – Legundi – Bunder (KLB) Toll Road. Through traffic count surveys and Road Side Interviews (RSI) at toll gates and arterial roads, data on vehicle population, payment ability, and user preferences for existing toll rates were obtained. The analysis employed a Logit model to evaluate the relationship between the ATP and WTP values and their correlation with the current toll rates. The results revealed that both the WTP and ATP of the community were lower than the existing toll tariff. Specifically, the study found that the optimal toll rate for users would be Rp. 1,100/km, which is 26.96% lower than the current rate of Rp. 1,506/km. This adjustment not only aligns better with the financial capacities of the users but also presents an opportunity for revenue optimization. By lowering the toll rate, it is predicted that increased traffic volume could compensate for the reduced fee, ultimately benefiting both the toll operator and the community. In conclusion, establishing a toll rate that reflects user preferences is crucial for enhancing accessibility and ensuring sustainable revenue generation for infrastructure development.
Safety Implementation Analysis and Occupational Health at Kretek 2 Bridge Work In Bantul Regency Nashrullah Arifin, Isyraq; Oetomo, Wateno; Djoko Nugroho, Laksono
Devotion : Journal of Research and Community Service Vol. 4 No. 2 (2023): Devotion: Journal of Research and Community Service
Publisher : Green Publisher Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36418/dev.v4i2.391

Abstract

Construction work includes the implementation of construction work and the community organizing the construction work itself. The implementation of this construction work must comply with the provisions regarding engineering, occupational safety and health, labor protection, and local environmental regulations to ensure the realization of an orderly implementation of construction work. The construction of the Kretek 2 Bridge in Bantul Regency, Special Region of Yogyakarta Province has its own challenges, because the location of the bridge is in an area prone to earthquakes and liquefaction or ground movement. With so many workers on this very high-risk project, there is a high probability of an accident occurring. The purpose of the study was to analyze (1) the risky work that could occur in bridge construction work, (2) the work that has the highest possible risk, (3) risk control, (4) the amount of investment costs required. The method used is the HIRADC method. The results of the study were (1) Risky work that can occur was a. High level of risk, including drowning, being dragged by the river current, being hit by heavy equipment maneuvers and falling from a height. b. Moderate risk level, including being crushed by formwork, falling material, scratched hands. c. Low level of risk, including landslides, heavy equipment maneuvers, iron puncture. (2) Work that has the highest possible risk is Pile Cap Excavation Work, Work Floor Work and Pier Head Ironing Work. (3) Risk control in bridge work consists of: Using a boat when measuring in rivers, Conducting briefings before starting activities, Using PPE life vests and placing life ring buoys on boats, Installing signs and placing officers in areas that intersect with roads, Installing guardrail of the project area, installing scaffolding as a working platform and inspecting its feasibility, communicating hazards through signs, conducting refresh training for workers. (4) The investment cost required for implementing K3 on the Kretek 2 Bridge work in Bantul Regency was Rp. 6,545,998,310 or 1.795% of the contract value.
Measurement of Project Cost and Time Efficiency with Earned Value Approach In The Implementation of Baggage Handling System at Sultan Hasanuddin International Airport Makassar Digma Pratama, Irwansyah; Djoko Nugroho, Laksono; Muhammadun, Haris
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.478

Abstract

The installation of the Baggage Handling System (BHS) at Sultan Hasanuddin International Airport, Makassar, faces challenges related to cost and time inefficiencies, particularly delays in project completion. This study aims to evaluate these inefficiencies by applying the Earned Value Method (EVM) to assess project performance and identify areas for improvement. Utilizing EVM metrics, the research identifies that the Schedule Performance Index (SPI) is below 1, indicating a delay in the project timeline, with the actual duration extending to 556 calendar days compared to the planned 546 days. This delay underscores the need for a more robust project management approach. The study employs the Critical Path Method (CPM) in conjunction with Microsoft Project to improve scheduling accuracy, alongside recommendations for project acceleration using the Crashing Program method. The findings highlight that early implementation of EVM can help mitigate discrepancies in cost and time, enabling better control and monitoring throughout the project lifecycle. The study concludes that integrating advanced scheduling techniques and real-time performance metrics is essential to achieving efficiency and minimizing delays in similar infrastructure projects.
Project Performance Analysis Based on Earned Value Method on Infrastructure & Infrastructure Improvement of Yohanis Kapiyau Timika Airstrip Nazaruddin, Nazaruddin; Djoko Nugroho, Laksono; Muhammadun, Haris
Asian Journal of Social and Humanities Vol. 3 No. 4 (2025): Asian Journal of Social and Humanities
Publisher : Pelopor Publikasi Akademika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59888/ajosh.v3i4.479

Abstract

This study analyzes the performance of construction projects using the Earned Value Method (EVM) on the Infrastructure and Facilities Improvement Project at Yohanis Kapiyau Airbase in Timika. Utilizing key performance indicators such as Cost Variance (CV), Cost Performance Index (CPI), Schedule Variance (SV), and Schedule Performance Index (SPI), the research evaluates cost and time deviations to provide a comprehensive understanding of project performance. EVM offers precise insights into the project's current status, including estimates for total costs and completion timelines, which are critical for effective decision-making and ensuring adherence to project plans. The findings demonstrate that EVM is a reliable tool for accurately monitoring and managing construction projects, enabling stakeholders to identify inefficiencies and implement corrective measures in a timely manner. By providing an in-depth evaluation of cost efficiency and schedule performance, the study contributes to the broader application of EVM in enhancing construction project management. This research is expected to benefit academics by advancing theoretical knowledge, assist contractors in optimizing project execution, and inform public stakeholders on best practices for infrastructure development, ultimately contributing to more effective and efficient management of construction projects in Indonesia.
Alternative Design Solutions For Flexible And Rigid Pavements In The Sampang-Ketapang Road Widening Project (Section 113) Muhammad Zainal Muttaqin; Esti Wulandari; Laksono Djoko Nugroho
Journal of Social Science Vol. 6 No. 1 (2025): Journal of Social Science
Publisher : Syntax Corporation Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Sampang-Ketapang road segment (Link 113) plays a pivotal role in regional connectivity, supporting economic and social activities in Sampang Regency, a hub for salt and tobacco production. This study compares two pavement design alternatives: flexible pavement using Class A aggregate with a thickness of 200 mm and rigid pavement with a flexural strength of 4.5 MPa and a thickness of 300 mm. The analysis evaluates cost efficiency, implementation time, and suitability for the increasing traffic demands of the region. The results show that flexible pavement requires an investment of IDR 12.8 billion and a 7-month construction duration, while rigid pavement demands IDR 19.5 billion and a 9-month duration. Flexible pavement offers lower initial costs and shorter implementation time, making it a more feasible option for segments with moderate traffic. However, it requires more frequent maintenance, increasing long-term expenses. Conversely, rigid pavement is more durable, with minimal maintenance costs, but has higher initial costs and a longer construction timeline. Considering the economic and technical aspects, flexible pavement is recommended as the optimal solution for this project due to its cost-effectiveness and shorter timeline, ensuring efficient resource utilization. Strategic implementation combining both pavement types is also proposed, with flexible pavement for moderate traffic areas and rigid pavement for segments with heavy traffic. This approach balances cost efficiency, implementation time, and long-term durability, supporting the sustainable development of road infrastructure in Sampang Regency
Design Analysis of Flexible and Rigid Pavements For The Sampang-Ketapang Road (Link 113): A Cost and Time Perspective Muhammad Zainal Muttaqin; Esti Wulandari; Laksono Djoko Nugroho
Journal of Social Research Vol. 4 No. 3 (2025): Journal of Social Research
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/josr.v4i3.2474

Abstract

This study evaluates the costs and implementation times for flexible and rigid pavement designs for the Sampang-Ketapang road (Link 113) using the 2024 Pavement Design Manual. The flexible pavement design, using Class A aggregate with a thickness of 200 mm, costs IDR 12,804,591,492 and requires a 7-month implementation period. In contrast, the rigid pavement design, with 300 mm concrete and a flexural strength of 4.5 MPa, costs IDR 19,513,787,534 and takes 9 months to complete. While flexible pavement is more cost-efficient and quicker to implement, making it suitable for projects with budget and time constraints, rigid pavement offers greater durability and reduced maintenance over time, which may justify its higher initial cost for roads with heavy traffic. This study emphasizes the importance of selecting the appropriate pavement type based on traffic conditions, subgrade characteristics, and budget limitations. Flexible pavement is recommended for segments with moderate traffic and short-term construction needs, while rigid pavement is better suited for high-traffic areas requiring long-term durability. The research suggests a strategic combination of both pavement types to optimize cost and efficiency while ensuring sustainability. The findings provide practical guidance for stakeholders in road infrastructure projects, offering a framework to balance initial costs, construction timelines, and long-term maintenance to achieve optimal outcomes in road widening projects like the Sampang-Ketapang road expansion.