Ike Rahma Vindra
Politeknik STIA LAN Jakarta, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

The Mechanism for Disposal of Equipment and Machinery Assets Owned by the University of Indonesia through Auction Sales at Auction Houses/Class II Auction Officers Ike Rahma Vindra; Neneng Sri Rahayu; Asropi Asropi
International Journal of Economics Development Research (IJEDR) Vol. 4 No. 2 (2023): International Journal of Economics Development Research (IJEDR)
Publisher : Yayasan Riset dan Pengembangan Intelektual

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37385/ijedr.v4i3.3477

Abstract

Implementing guidelines for the elimination of equipment and machinery assets through auction sales at Class II Auction Halls/Auction Officials is the latest breakthrough for UI as a Legal Entity State University (PTN-BH). This guide not only guarantees transparency, integrity, and regulatory compliance when delisting assets, but also becomes an important part of UI's asset management strategy. Having equipment and machinery asset write-off guidelines that set time limits is a very important step. However, in reality, the absence of guidelines related to the elimination of special assets of equipment and machinery and the absence of standards for the time or duration of implementation related to the asset write-off flow process make asset managers tend to be reluctant to write off assets. The reason for this is because of the lengthy administrative procedures and considerable time required for each asset write-off process. Qualitative research has been conducted to understand the implementation mechanism of the removal of equipment and machinery assets in UI through auction sales that are already underway. The results showed that this process took significant time. Therefore, it is very important to develop specific guidelines that are in accordance with Rector's Regulation no.11 of 2020, as well as set realistic time standards. The approach is carried out with three methods in making standard time / duration of activities (PMBOK guide 5, 2013), namely with Analogue Estimating, Group Decision Making Technique and Reserve Analysis with the main aim of ensuring that the process of removing equipment and machinery assets owned by UI through auction does not exceed six months. Through this research, we emphasize the need for a focused and efficient flow in the elimination of equipment and machinery assets through auction sales at Class II Auction Halls/Auction Officials. Thus, UI can improve process effectiveness, ensure regulatory compliance, and achieve Good University Governance optimally.