Claim Missing Document
Check
Articles

Found 3 Documents
Search

ANALISIS PERILAKU KEKAKUAN LANTAI STRUKTUR GEDUNG HOTEL ZEST AMBON MENGGUNAKAN METODE RESPONS SPEKTRUM Victor C. M Latumeten; Pieter Lourens Frans; Vector R. R. Hutubessy
Journal Agregate Vol. 2 No. 2 (2023): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i2.1372

Abstract

Earthquakes that occur can sometimes affect the structure of the building. This research was conducted to determine the effect of the earthquake on the building of the Zest Ambon hotel building which was newly build in 2018. This study aims to analyze the behavior of floor stiffness in Zest Hotel Ambon building, resulting in a large displacement value in Zest Hotel Ambon building. Data collected in this present strudy is primary data in the form of a map of the building layout, secondary data in the form of structural drawings of the zest hotel buildings. Analysis of floor stiffness and displacement of zest hotel ambon building using ETABS (Extended three analysis building systems) software with dynamic load response spectrum based on the soil site class SNI-03-1726-2019.The result of analysis showed that the deviation value between floor is still within permit limit determined by SNI-03-1726-2019and the largest amount of displacement value found on 11th floor with an X direction of 21,6 mm and a Y direction of 21,7mm where higher the floor level in the building, the greater the displacement value.
PERHITUNGAN KAPASITAS KUDA-KUDA RANGKA ATAP BAJA RINGAN PADA PROYEK REVITALISASI SD NEGERI 160 MALUKU TENGAH Umi Rahmawati Slamat; Vector R. R. Hutubessy; Abraham Tuanakotta
Jurnal Media Akademik (JMA) Vol. 4 No. 4 (2026): JURNAL MEDIA AKADEMIK Edisi April
Publisher : PT. Media Akademik Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62281/sk0dcq71

Abstract

Revitalisasi bangunan sekolah merupakan salah satu upaya untuk meningkatkan kualitas sarana pendidikan dengan mengganti atau memperkuat elemen struktur yang sudah tidak layak pakai. Pada Proyek Revitalisasi SD Negeri 160 Maluku Tengah, rangka atap kayu yang telah rusak digantikan dengan rangka kuda-kuda baja ringan. Penelitian ini bertujuan untuk menghitung kapasitas kuda-kuda baja ringan tipe Modified Howe Pratt Truss dengan profil C75x35x0,75 berdasarkan standar SNI 1727:2020 tentang beban bangunan dan SNI 7971:2013 tentang struktur baja canai dingin. Metodologi penelitian meliputi pengumpulan data gambar kerja dan spesifikasi material, perhitungan beban mati, beban hidup, serta beban angin sesuai ketentuan SNI, kemudian dilakukan analisis struktur menggunakan perangkat lunak SAP2000 v22. Hasil analisis menunjukkan gaya tarik maksimum sebesar 2.047 kgf, gaya tekan maksimum -1.082,28 kgf, gaya geser maksimum 0,85 kgf, dan momen maksimum 0,32 kgf·m. Kapasitas rencana batang tarik adalah 5.750 kgf, batang tekan 3.850 kgf, , gaya geser 1.608,37 kgf dan momen 134,14 kgf.m dimana lebih besar dibandingkan hasil analisis. Dari hasil perhitungan dapat disimpulkan bahwa seluruh batang kuda-kuda baja ringan profil C75x35x0,75 memenuhi syarat kekuatan struktur sesuai dengan standar yang berlaku. Dengan demikian, kuda-kuda baja ringan pada proyek ini dinyatakan aman untuk menahan beban mati, beban hidup, maupun beban angin.
Perhitungan Rencana Anggaran Biaya Terhadap Struktur Gedung Hotel Nunusaku Di Wilayah Kota Ambon Semuel Huwae; Herry Henry Roberth; Vector R. R. Hutubessy
KOLONI Vol. 4 No. 1 (2025): MARET 2025
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/koloni.v4i1.714

Abstract

Hotels are also one of the complex types of buildings in terms of design, construction and cost. Before starting the construction of a hotel, it is important to have a clear understanding of the cost budget required for the structure of the building, including structural aspects such as foundations, walls and roofs. The purpose of this study is to determine the volume of each work item, determine the value of the cost budget plan required for the construction of the Nunusaku Hotel building and the estimated time for the implementation of the construction of the Nunusaku Hotel building.The methods used in this study are literature and quantitative methods. The literature method is by using the literature method, in collecting data and information through books and references as well as internet media in the design of RAB. The data collection method is in the form of a basic price. In the calculation of the Nunusaku Hotel Building Cost Budget Plan, using Work Unit Price Analysis (AHSP) for the Ministry of Public Works Cipta Karya Sector on 2023, and using the unit price of wages and materials for the city of Ambon in 2023.Based on the results of the calculation of the Nunusaku Hotel Building Cost Budget Plan, the value of the cost budget plan was obtained of Rp. 1,992,254,000.00 (One Billion Nine Hundred Ninety Two Million Two Hundred Fifty Four Thousand Rupiah), the implementation time required for the construction work of the structure of the Nunusaku hotel building is 24 weeks (6 months.)