Bambang Pujo Purwoko
Unknown Affiliation

Published : 4 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 4 Documents
Search

Analisis Komposisi Anggaran Pembangunan Terhadap Pertumbuhan Pendapatan Daerah Di Kabupaten Lebak Dede Suharna; Liesna Halimutusa; Bambang Pujo Purwoko
E-Journal Studia Manajemen Vol 1 No 2 (2012)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Regional development as part of national development is essentially an effort to increase the capacity of regional growth and which will generate revenue growth areas, especially revenue. Revenue swampy district is still larger transfers from central funds as grants. Composition of the Development expenditure that budgeting is directly affected by the program or activity is expected to increase local revenue growth. Besides the fiscal decentralization brings more benefits for the regions to manage their own fiscal capacity. This study examined the impact of the composition of the development budget to the revenue growth in the district swampy area using the case study method. The population in this study is Lebak district budget with sample budget and realization of the budget year 1999-2009, a technique using linear regression analysis. This study found that the composition of the development budget has a negative impact on revenue growth. The coefficient of determination variable X does not provide significant effect on variable Y. The results of the analysis obtained by the composition of the development budget does not influence or no significant effect on local revenue growth of Lebak.
Analisis Penjadwalan Proyek Terhadap Waktu Penyelesaian Proyek Pada Wisma Koperasi Sugri di Rangkasbitung Bambang Pujo Purwoko; Siti Aminah; Jauhar latifah; Andri Susilo
E-Journal Studia Manajemen Vol 1 No 3 (2012)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The aim of the study to determine how the process of project scheduling and project completion time. Analysis of projects using PERT (Program Evaluation Review Technique). To determine the time of completion using the two calculations, forward and backward calculation. From all calculations start from ground, first, second and the third floor, note that all activities of critical experience caused delayed completion of the project. Thus there is effect on project schedule project on completion time of project.
Analisis Biaya Pembelian Bahan Baku Terhadap Jumlah Produksi Pada CV. Shaniqua Marigold Bamboo Di Rangkasbitung Bambang Pujo Purwoko; Ratna Handayani; Yumhi .; Jauhar Latifah
E-Journal Studia Manajemen Vol 2 No 1 (2013)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Purchasing is one of the important functions in the success of the company's production, because this function has the responsibility to obtain raw materials at the quantity and quality is good and according to need. The study population was all over raw material purchasing data since the founding of the company and the sample is a raw material purchasing data and the amount of production for 10 months ie from January to October 2010 using the research instrument Likert scale (1-5). Data analysis techniques used are (1) the correlation coefficient, (2) the coefficient of determination, and (3) testing the hypothesis by using t test. The results showed that there is a strong relationship between the cost of purchase of raw materials and production quantities.
Pengaruh Insentif Terhadap Produktivitas Kerja Karyawan Pada Pabrik Kopi Cap Gajah Di Rangkasbitung Yumhi .; Rendi Dwi Rahmat; Hurriyah Agustini; Bambang Pujo Purwoko
E-Journal Studia Manajemen Vol 3 No 3 (2014)
Publisher : E-Journal Studia Manajemen

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

An incentive is one very good way applied to direct employees at the company's goals. Incentive is seen as one of the elements that can affect employee productivity. The purpose of this study was to analyze the effect of incentives on work productivity. This study uses a method used by this author is a quantitative method. The sampling technique using saturated sample of 40 respondents. Results of this study are: There is a positive and significant impact on performance incentives.