Sugendra, Renaldy
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Follow-Up Queue Impact Due to The Closures of Perintis Kemerdekaan Railroad Crossing on Vehicle Velocity Decrement of Gatot Subroto Street Sugendra, Renaldy; Putra, Sasana; Ofrial, Siti Anugrah Mulya Putri; Sulistyorini, Rahayu
Jurnal Rekayasa Sipil dan Desain Vol 11, No 3 (2023): Edisi September 2023
Publisher : Jurnal Rekayasa Sipil dan Desain

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The closures of railroad crossing on Perintis Kemerdekaan Street frequently cause vehicle queues on Gatot Subroto Street. The density that happens on Perintis Kemerdekaan Street impacts on the occurrence the road constringency and vehicle velocity delay. The results with four hours of observation, the delay values can be concluded with shockwave analysis. 20,72 km/h is determined as for the value of forwarding forming shockwave (ωda) in morning observation and 9,08 km/h in the afternoon; with 1,32 km/h of backward forming shockwave (ωab) in the morning and -1,07 km/h in the afternoon; also forward recovery shockwave (ωdc) in the morning is 5,17 km/h and 1,98 km/h in the afternoon; as well with -10,64 km/h as the value for backward recovery shockwave (ωcb) in the morning and -4,10 km/h in the afternoon; as for the frontal stationary shockwave (ωac) the value is 4,73 km/h in the morning and 1,75 km/h in the afternoon. The mileage time increment is up from 4,25 to 7,6925 seconds in the morning and from 10,68 to 21,196 seconds in the afternoon.
Follow-Up Queue Impact Due to The Closures of Perintis Kemerdekaan Railroad Crossing on Vehicle Velocity Decrement of Gatot Subroto Street Sugendra, Renaldy; Putra, Sasana; Ofrial, Siti Anugrah Mulya Putri; Sulistyorini, Rahayu
Jurnal Rekayasa Sipil dan Desain Vol. 11 No. 3 (2023): Edisi September 2023
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jrsdd.v11i3.3562

Abstract

The closures of railroad crossing on Perintis Kemerdekaan Street frequently cause vehicle queues on Gatot Subroto Street. The density that happens on Perintis Kemerdekaan Street impacts on the occurrence the road constringency and vehicle velocity delay. The results with four hours of observation, the delay values can be concluded with shockwave analysis. 20,72 km/h is determined as for the value of forwarding forming shockwave (ωda) in morning observation and 9,08 km/h in the afternoon; with 1,32 km/h of backward forming shockwave (ωab) in the morning and -1,07 km/h in the afternoon; also forward recovery shockwave (ωdc) in the morning is 5,17 km/h and 1,98 km/h in the afternoon; as well with -10,64 km/h as the value for backward recovery shockwave (ωcb) in the morning and -4,10 km/h in the afternoon; as for the frontal stationary shockwave (ωac) the value is 4,73 km/h in the morning and 1,75 km/h in the afternoon. The mileage time increment is up from 4,25 to 7,6925 seconds in the morning and from 10,68 to 21,196 seconds in the afternoon.