Claim Missing Document
Check
Articles

Found 8 Documents
Search

Asesmen Kekuatan Struktur Bangunan Terkait Penambahan Lantai Gedung Asrama Pondok Pesantren Entrepreneur Muhammadiyah (PPEM) Gondanglegi Kabupaten Malang Wahyudiono, Sandi; Aulia Indira Kumalasari; Zamzami Septiropa
Jurnal Pengabdian dan Peningkatan Mutu Masyarakat (Janayu) Vol. 4 No. 1 (2023): Jurnal Pengabdian dan Peningkatan Mutu Masyarakat
Publisher : Universitas Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/janayu.v4i1.23476

Abstract

Keberhasilan program pendidikan sangat dipengaruhi oleh faktor sarana dan prasarana pendidikan yang dapat menunjang pembelajaran di pesantren, termasuk di Pondok Pesantren Entrepreneur Muhammadiyah (PPEM) Gondanglegi. Dari data awal yang didapatkan di lapangan diketahui bahwa PPEM Gondanglegi ini kekurangan sarana kelas dan penginapan karena bertambahnya jumlah santri yang mendaftar. Untuk itu pihak PPEM ingin menambah jumlah lantai di Gedung Asrama yang awalnya terdiri dari 2 lantai. Permasalahan yang dihadapi pihak PPEM adalah tidak mempunyai data-data terkait pembangunan Gedung seperti data tanah, gambar teknis, serta jenis pondasi yang digunakan karena kontraktor yang berbeda tiap pembangunan per lantainya. Untuk itu diperlukan pengecekan Gedung dan Asesmen kekuatan struktur bangunan gedung apakah layak dan aman jika nantinya ditambah 1 lantai atau bahkan 2 lantai. Target yang diharapkan dari Asesmen kekuatan struktur bangunan gedung ini adalah hasil analisis uji Hammer Test untuk mengetahui mutu beton bangunan gedung serta laporan hasil pengecekan kekuatan struktur bangunan gedung apakah aman jika dilakukan penambahan lantai bangunan. Dari hasil asesmen bangunan Gedung asrama dapat diketahui kalau bahwa mutu beton di lantai 1,2 dan 3 sudah sesuai standar SNI untuk Gedung bertingkat dan bisa mendukung jika dilakukan penambahan untuk lantai 4 serta dapat direkomendasikan untuk melanjutkan pekerjaan pembangunan di lantai 4 dengan beberapa catatan yang harus dilakukan seperti fungsi ruang dan jenis material.
Cross-Sectional Capacities of Reinforced Concrete Structures Using Abaqus and Staadpro Software Kahfi, Rizaldi Al; Andardi, Faris Rizal; Rusdianto, Yunan; Wahyudiono, Sandi
Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil Vol 12 No 2 (2024): BENTANG Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil (July 2024)
Publisher : Universitas Islam 45

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33558/bentang.v12i2.9662

Abstract

The Faculty of Computer Science building at Universitas Brawijaya is classified as a category II building because it is located in an earthquake-prone area so it is included in seismic design B. The building’s planning adheres to the regulations of SNI 2847:2019 and SNI 1727:2020. Software is required to efficiently and accurately analyze the forces acting on a structure. Generally, there are two main directions for software: structural design or planning, and research. Both design and research software are used as powerful analytical tools to solve complex problems such as structural behavior. The objective of this research is to analyze the cross-sectional capacity of the Faculty of Computer Science building at Brawijaya University using Abaqus and Staadpro software. The redesign process begins by analyzing the earthquake structure to be applied. Using the equivalent static analysis method, the redesign of this building involved obtaining design results for floor plates with dimensions of 120 mm, roof plates with dimensions of 100 mm, main beams measuring 300 x 600 mm, secondary beams with dimensions of 250x500 mm, and columns with dimensions of 600x600 mm. The analysis results of the cross-sectional capacity meet the criteria for special moment frame systems (SRPMK), specifically the Strong Column Weak Beam concept, are shear resistant, and comply with detailed requirements.
Kontribusi teknik sipil untuk pendidikan: Revitalisasi dinding serta penyusunan dokumen PBG guna mendukung lingkungan belajar yang nyaman di TK Aba 24 Wahyudiono, Sandi; Kumalasari, Aulia Indira; Septiropa, Zamzami; Darmawan, Azhar Adi
Abdimas Siliwangi Vol. 8 No. 1 (2025): Februari 2025
Publisher : IKIP SILIWANGI

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Guna memberikan pelayanan pendidikan yang mampu mendukung pembentukan karakter, kemampuan kognitif, serta kemampuan sosial pada anak-anak, tim pengabdi melakukan kegiatan revitalisasi dinding halaman TK ABA 24 Malang serta penyusunan dokumen Persetujuan Bangunan Gedung (PBG). Kegiatan tersebut didasari pada kondisi bangunan sekolah khsusunya pada dinding area halaman bermain yang sudah mengalami kerusakan akibat terpapar kondisi cuaca. Akibatnya, hal tersebut mengurangi estetika serta kenyamanan lingkungan sekolah. Selain itu, belum tersedianya dokumen PBG juga menjadi perhatian mengingta pentingnya kelengkapan dokumen administratif untuk menghindari potensi sanksi di masa depan. Tahapan kegiatan yang dilakukan meliputi survey lokasi mitra untuk mengidentifikasi permasalahan, diskusi dengan pihak sekolah untuk merancang solusi yang tepat, serta melaksanakan revitalisasi fisik serta membuat gambar kerja sebagai bagian dari dokumen PBG. Hasil kegiatan menunjukkan keberhasilan dalam memperbaiki didning halaman melalui pengecatan sekaligus melengkapi dokumen PBG yang mencakup siteplan, layout, serta denah. Revitalisasi ini tidak hanya meningkatkan kondisi fisik bangunan, tetapi juga mendukung terciptanya lingkungan belajar yang aman, nyaman m,serta kondusif bagi para siswa.
Earned Value Management (EVM) Analysis for Maintenance Projects: Insights from GKB 4 at Universitas Muhammadiyah Malang Wahyudiono, Sandi; Utari, Rini Pebri
Bentang : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil Vol 13 No 2 (2025): BENTANG Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil (July 2025)
Publisher : Universitas Islam 45

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33558/bentang.v13i2.10632

Abstract

Building maintenance is a critical element of asset management to ensure functional feasibility, safety, and operational efficiency. This study evaluates the effectiveness of implementing Earned Value Management (EVM) in the maintenance project of Building 4, Universitas Muhammadiyah Malang (GKB 4 UMM), based on the Building Maintenance and Care Guidelines (Permen PU No. 24/PRT/M/2008). The research method includes collecting actual project data, analyzing EVM metrics such as Planned Value (PV), Earned Value (EV), and Actual Cost (AC), as well as calculating variance and performance indices. The results demonstrate that EVM effectively detects cost inefficiencies, with a total Cost Variance (CV) of Rp -70,012,501 and an average Cost Performance Index (CPI) of 0.88, highlighting low cost efficiency in key components such as brick walls and lifts. The project is on schedule with an average Schedule Performance Index (SPI) of 1.01. This study concludes that EVM serves as a reliable tool for identifying cost deviations, enabling quicker and more accurate evaluations, and supporting budget optimization for building maintenance projects.
Pendampingan Perencanaan Desain Kanopi dan Renovasi Kamar Mandi Masjid Asy Syuuura Pengurus Ranting Muhammadiyah (PRM) Jatimulyo Malang Wahyudiono, Sandi; Septiropoa, Zamzami; Andardi, Faris Rizal; Ali, Mohammad Hisyam; Putra, Pradipta Triska Mada; Farisandi, Akbradianto Dwi
Abdimas Galuh Vol 7, No 2 (2025): September 2025
Publisher : Universitas Galuh

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25157/ag.v7i2.18688

Abstract

Pendampingan perencanaan desain kanopi dan renovasi kamar mandi Masjid Asy Syuura dilaksanakan untuk membantu masyarakat di lingkungan Jalan Pisang Kapas Dalam 2-D Kelurahan Jatimulyo. Renovasi pembangunan masjid di lingkungan Jalan Paisang Kipas Dalam 2-D ini dilakukan karena kapasitas jamaah, khususnya pada waktu ibadah sholat Jum’at yang selalu meluber ke jalan raya dan terpampang sinar matahari langsung. Dan juga keadaan kamar mandi dan tempat wudhu yang sudah waktunya untuk direhabilitasi/renovasi. Kesulitan atau masalah yang dialami oleh masyarakat kampung Jalan Pisang Kapas Dalam 2-D kita membuat desain kanopi dan RAB untuk melakukan kegiatan ini. Sehingga keberadaan tim Pengabdian Masyarakat oleh Mahasiswa (PMM) dari program studi Teknik Sipil Universitas Muhammadiyah Malang (UMM), diharapkan mampu untuk perencanaan desain kanopi dan kegiatan renovasi kamar mandi ini. Dengan desain perencanaan dan rehabilitasi yang baik, diharapkan masjid ini akan menjadi kebanggaan warganya dan akan dapat menumbuhkan kenyamanan ibadah dan kegiatan keagamaan bagi seluruh warganya. Tim pengabdian telah mendampingi di dalam perencanaan Gambar desain kanopi dan RAB seluruh kegiatan pengabdian ini. Tahap berikutnya adalah terkait pelaksanaan renovasi yang membutuhkan ± Rp3.500.000.
Cost and Time Control Using The Earned Value Concept (EVM) Method : Case Study of Ahmad Dahlan Hospital Development Project, Kediri Utari, Rini Pebri; Wahyudiono, Sandi; Amal, Andi Saiful; Ardian, Langgeng
G-Tech: Jurnal Teknologi Terapan Vol 9 No 4 (2025): G-Tech, Vol. 9 No. 4 October 2025
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/g-tech.v9i4.8132

Abstract

Time delays and cost overruns are frequent problems in construction projects. To evaluate these issues, this study applies the Earned Value Management (EVM) method to assess cost and schedule performance in the Muhammadiyah Ahmad Dahlan Hospital project in Kediri. The analysis focuses on three key indicators—Budgeted Cost of Work Performed (BCWP), Budgeted Cost of Work Scheduled (BCWS), and Actual Cost of Work Performed (ACWP)—evaluated during weeks 10, 17, and 32. Results show that in week 10, project performance indicated delays and cost overruns (CPI = 0.75; SPI = 0.97). In week 17, the schedule improved (SPI = 1.50) but cost performance remained inefficient (CPI = 0.996). By week 32, both indices were positive (CPI = 1.011; SPI = 1.03), showing that the project finished earlier and more efficiently. The Budget Estimate at Completion (BEAC) was IDR 57,919,253,725, with an estimated duration of 39.79 weeks, slightly faster than planned. This study contributes to enhancing project efficiency evaluation through periodic EVM analysis, providing insights for better cost and time control in construction management.
Solusi Alternatif Keterlambatan Pembangunan Rumah Sakit Gedung Inspektorat Provinsi Jawa Timur Tahap II dengan Metode TCTO Andardi, Faris Rizal; Wahyudiono, Sandi; Wibisono, Wiku Darmawan
Rekayasa Sipil Vol 12, No 2 (2023)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/jrs.2023.v12.i2.04

Abstract

Keterlambatan merupakan salah satu kendala dalam pelaksanaan pekerjaan proyek konstruksi yang menyebabkan bertambahnya waktu pelaksanaan dan biaya. optimasi dilakukan di lokasi pembangunan gedung Rumah Sakit Inspektur Provinsi Jawa Timur. Tujuan dari penelitian ini adalah memberikan solusi untuk mengatasi keterlambatan pelaksanaan proyek. Penelitian ini menggunakan metode TCTO (Time-Cost Trade-off) dengan mempertimbangkan pekerjaan penting dan tidak penting dalam melakukan analisis. Hasil penelitian menunjukkan bahwa program darurat dengan kerja lembur dapat menghasilkan efisiensi waktu sebesar 32,15% dengan keuntungan proyek sebesar 0,96%.
Revitalisasi Sarana Kamar Mandi dan Pembangunan Area Parkir SD Muhammadiyah 5 Sukun Malang Andardi, Faris Rizal; Wahyudiono, Sandi; Tamzi Kurniawan, Iyan Prasetyo; Aqli, Rasiful; Romadlon, Muhammad Rizqi; Taqiyuddin, Muhamad Hilmi; Binnawa, Achmad Adlan; Adibah, Amalia Nur
Abdimas Galuh Vol 6, No 1 (2024): Maret 2024
Publisher : Universitas Galuh

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25157/ag.v6i1.13450

Abstract

SD Muhammadiyah 5 adalah salah satu satuan pendidikan dengan jenjang SD di Tanjungrejo, Kec. Sukun, Kota Malang, Jawa Timur. Data awal yang didapatkan di lapangan, diketahui bahwa SD Muhammadiyah 5 Sukun Malang ini kurang optimal untuk perawatan dan pemeliharaan bangunan. Kegiatan ini bertujuan untuk memperbaiki sarana dan prasarana yang rusak dan membangun sarana atau prasarana yang belum tersedia. Kegiatan dimulai dengan diadakannya survey di sejumlah lokasi toko bangunan dan sekolah untuk mendapatkan data data yang berguna saat eksekusi pekerjaan nantinya. Kegiatan pengabdian dimulai dengan pengecatan dinding dilakukan pada kamar mandi guru yang berjumlah 2 ruang, lalu pembuatan lahan parkir dilakukan di lahan kosong pada lingkungan sekolah, lalu pergantian keramik juga dilakukan dikarenakan kondisi keramik yang sudah pecah dan rusak, penggantian jendela juga dilakukan dikarenakan jendela sudah rusak dan tidak layak. Perbandingan siswa dan jumlah kamar mandi serta tempat wudhu yang tidak sebanding maka diperlukan perencanaan kamar mandi dan tempat wudhu. Untuk itu diperlukan perencanaan gambar 2D dan 3D kamar mandi serta tempat wudhu yang baru. Berdasarkan pengabdian masyarakat yang kami lakukan kami berhasil menyelesaikan pembuatan lahan parkir, perbaikan keramik, perbaikan kusen jendela, dan pengecatan ulang kamar mandi, serta perencanaan gambar kamar mandi dan tempat wudhu.