The Planning of Bill of Quantity for the Construction of the Sibetan Village Market Dharmastika, I Gusti Agung Gede Nodya
Jurnal Abdi Daya Vol. 4 No. 1 (2024): Jurnal Abdi Daya Vol.4 No.1 Tahun 2024
Publisher : Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/jad.4.1.2024.50-58

Abstract

The village of Sibetan in Bebandem District, Karangasem Regency, has promising potential in the agricultural sector, one of which is the snakeskin fruit. Most of the villagers in Sibetan own snakeskin fruit fields, which serve as their main source of livelihood. The distribution of this snakeskin fruit can be done by selling it at the market. However, the Sibetan village market does not yet have adequate facilities, so planning documents are needed for its development. The Bill of Quantity (BOQ) is one of the documents required to realize the construction. In this activity, the BOQ for the Sibetan village market will be prepared using the design already owned by the village authorities. The unit price method will be used to prepare the RAB for the Sibetan village market. The results of the activity indicate that the construction of the Sibetan village market requires a budget of IDR 701,950,397. The prepared BOQ will later be used to draft funding proposals, serve as a basis for decision-making, contract drafting, and cost control during the construction implementation.
Penyusunan Rencana Desain Pasar Desa Sibetan Kecamatan Bebandem Karangasem Bali Wiguna, Made Mas Surya; Prabawa, Made Suryanatha; Dharmastika, I Gusti Agung Gede Nodya
Jurnal Pengabdian Masyarakat Bangsa Vol. 2 No. 6 (2024): Agustus
Publisher : Amirul Bangun Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59837/jpmba.v2i6.1215

Abstract

Hasil dari buah salak menjadi pendapatan utama bagi Desa Sibetan. Banyak olahan buah salak dan distributor salak yang meneruskan salak dikirim ke berbagai daerah. Selain buah salak terdapat pula umbi-umbian lain yang dijual di pasar Desa. terdapat tiga pasar yang ada di Desa Sibetan diantaranya pasar Kalanganyar, pasar Telaga dan Pasar Sibetan. Dari ketiga pasar tersebut, pasar Sibetan menjadi central dari pasar lainya, namun sangat disayangkan pasar Sibetan walapun merupakan pusat dari pasar lainya, pasar Sibetan ini belum mempunyai tempat yang layak. Pasar Sibetan masih menumpang dengan balai masyarakat yang dekat dengan pura Bale Agung Desa. Hal ini menjadi masalah besar terhadap Desa dikarenakan kapasitas pasar utama tergolong kecil dan tidak dapat menampung banyaknya masyarakat yang akan datang kepasar. Baru-baru ini juga permasalahan pasar ini menjadi topik utama di Desa Sibetan dikarenakan adanya renovasi pura dan balai masyarakat yang mengakibatkan pasar Sibetan ini harus pindah ke pinggiran jalan dan membuat masalah di lalulitas Desa. Dapat disimpulkan permasalahan utama dalam Desa Sibetan ini adalah; 1) Belum adanya titik lokasi yang dapat menjadi lokasi pasar yang ideal bagi masyarakat Sibetan. 2) Belum adanya perencanaan konsep pasar ideal bagi masyarakat Sibetan; dan 3) Belum memiliki dokumen perencanaan konsep pasar Sibetan. Untuk menyelesaikan permasalahan diatas, Metode yang akan digunakan adalah observasi,wawancara, FGD dan metode SWOT sebagai tolak ukur analisis titik lokasi. Hasil desain berada pada area perempatan jalan utama dan berada pada bibir tebing sungai. Desain memiliki dua masa bangunan dengan kontruksi baja untuk menyesuaikan kondisi lahan yang ditentukan.
IDENTIFIKASI PRODUKTIVITAS TENAGA KERJA UNTUK OPTIMASI ANGGARAN BIAYA DALAM PELAKSANAAN PROYEK SKALA KECIL DI BALI: Labor Productivity Identification for Budget Cost Optimization in Small-Scale Project Implementation in Bali Ida Ayu Cri, Vinantya Laksmi; Jawat, I Wayan; Dharmastika, I Gusti Agung Gede Nodya; Dewi, Ni Kadek Ayu Cipta; Putri, Komang Pipin Indraswari Berata
PUBLIKASI RISET ORIENTASI TEKNIK SIPIL (PROTEKSI) Vol 6 No 2 (2024): Vol. 6 No. 2 (2024)
Publisher : Universitas Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26740/proteksi.v6n2.p171-176

Abstract

The implementation of a construction project is highly dependent on the availability of labor which is the main driving force in the planning stage until the realization of the project. Without labor, it is impossible to achieve the goals of the project itself. The workability of the workforce is usually called productivity. One thing closely related to labor productivity is the cost of project implementation. The higher the productivity, the smaller the possibility of excess/inflation of project implementation costs, and vice versa. Based on this, further research is needed to determine the factors influencing labor productivity in implementing small-scale construction projects in Bali. Problem-solving and data analysis in this study used the Analytical Hierarchy Process (AHP) method. The results of the study showed that the most influential factors in labor productivity in project implementation were labor skills in carrying out work in the field (14.5%), equipment used during work (12.8%), the physical condition of workers (11.4%), job and work instructions given by superiors (11.3%), time schedule or work implementation time (10.5%), coordination between workers (10.2%), worker discipline during work or project implementation (10.1%), available materials (9.9%), and the last was the workspace or space available in carrying  a job (9.4%).
Analisis Perencanaan Biaya Proyek Pembangunan Gedung Undiksha Berbasis Building Information Modeling (BIM) Arta, I Kadek Rio Parsana; Dharmastika, I Gusti Agung Gede Nodya; Eryani, I Gusti Agung Putu
Jurnal Proyek Teknik Sipil Vol 8, No 2 (2025): September
Publisher : Civil Infrastructure Engineering and Architectural Design

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/potensi.2025.28800

Abstract

One of the innovations that has received attention is Building Information Modeling (BIM). The software that applies the BIM concept is Autodesk Revit. This study compares the Cost Budget Plan (RAB) obtained through the BIM method, and the RAB calculated by conventional methods in the Denpasar Undiksha Campus Lecture Building Construction Project, to identify a more efficient method used in project cost estimation. The method used in this study is to collect project data in the form of structural work drawings, unit price analysis, and RAB, which is used as a reference for modeling with Autodesk Revit. The RAB calculated using the BIM method modeled on Autodesk Revit was obtained lower at IDR 3,003,134,274.71. while RAB was obtained from contract documents of IDR 3,425,386,712.44. The comparison between Autodesk Revit's RAB and the contract document RAB shows a difference of IDR 422,252,437.73 with an efficiency value of 12.33%. The Cost Budget Plan (RAB) generated through modeling using Autodesk Revit shows lower and more efficient values. This shows that the application of BIM methods in project cost planning can provide more accurate and optimal results