ANALISIS KEPUASAN KONSUMEN BETON READY MIX TERHADAP KUALITAS PELAYANAN PT. SARANA BETON PERKASA I Wayan Jawat; I N. Sutarja; Mayun Nadiasa
JURNAL SPEKTRAN Vol. 2, No.2, Juli 2014
Publisher : Master of Civil Engineering Program Study, Faculty of Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (484.241 KB) | DOI: 10.24843/SPEKTRAN.2014.v02.i02.p08

Abstract

The study about consumers satisfactions toward ready mix concrete company efforts becomes a central topic in construction in Bali. More over, each of ready mix company promotes its comittment consistency in quality and is product services. The aim of these study is to identify the factors which are influenced the services quality towards the consumer satisfaction of ready mix concrete and to know the consumers satisfactions towards services quality. This study used consumers satisfaction survey through sampling technique ( questionnaires distributions to 40 respondent ) by filling  or marking the statements provided. To measure the consumers satisfaction toward the service quality, Importance – Perfomance Analysis was used. The aim is to measure the relation between consumer perseption and product/services quality improvement. The result of questionnaires data analyzes, could be concluded that the services quality was very important but the company didn’t do it maximal.The services included : the on time product delivery, the quick services for the consumers, the trust toward the quality, the consumers quality document, the readyness toward the consumers complaint. While, the services quality which were done well by the company, including : the staff took the mixture sample for the presure test, the staff did the slump test, the consumers got the information about the mixture quality, the slump test is based on the quality requirements, the pressure test is based on the the quality requirements, the concrete pump worked well, the mixer truck worked well, the volume of the mixture is based on the order, and the staff prepared  and used the testing tool on the field.
ANALISIS FAKTOR YANG BERPENGARUH TERHADAP PEMBENGKAKAN BIAYA SELAMA PELAKSANAAN PROYEK DI MASA PANDEMI COVID-19 PADA PELAKU JASA KONSTRUKSI SKALA KECIL DI BALI Ida Ayu Cri Vinantya Laksmi; I Wayan Jawat; Ni Komang Armaeni
FROPIL (Forum Profesional Teknik Sipil) Vol 9 No 2 (2021): FROPIL (Forum Profesional Teknik Sipil)
Publisher : Jurusan Teknik Sipil Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (568.781 KB) | DOI: 10.33019/fropil.v9i2.2432

Abstract

The Covid-19 virus pandemic that hit Indonesia, especially Bali, had a huge impact on people's lives. This has an impact on several sectors, ranging from the health sector, the economy, education, tourism, including the development sector. The Corona outbreak has forced all countries to revise the development plans that have been proclaimed. Targets were realistically adjusted, assumptions were changed according to current circumstances, and short-term program priorities were shifted largely to address the Covid-19 pandemic. In the context of accelerating development to restore economic conditions, several small-scale construction service actors are still able to carry out development even though they have to experience several obstacles. During the implementation of development during a pandemic, of course, some costs undergo significant changes that can even cause cost overruns. The swelling of construction project costs is highly dependent on several factors, both internal and external factors of the project. Several factors were very influential in cost overruns during the implementation of projects carried out by small-scale construction service actors during the Covid-19 pandemic, including inaccurate cost estimates (9.33%), errors in choosing work methods (8.84%) ), low labor productivity (8.15%), dimensional error/measurement of work in progress (8.14%), frequent work delays (8.04%), schedule delays due to weather effects (8.00%), an increase in material prices (7.94%), high equipment prices/rents (7.67%), delays/lack of materials and materials (7.31%), material damage (6.81%), material specifications required unsuitable (6.52%), and untimely payment methods (6.26%).
Estimasi Biaya Proyek pada Kontrakor Skala Kecil di Bali pada Masa Pandemi COVID-19 Ida Ayu Cri Vinantya Laksmi; Ni Komang Armaeni; I Wayan Jawat
Portal: Jurnal Teknik Sipil Vol 15, No 1 (2023): Edisi April
Publisher : Politeknik Negeri Lhokseumawe

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30811/portal.v15i1.3203

Abstract

Perencanaan proyek merupakan bagian dari realisasi pelaksanaan proyek. Dalam tahap perencanaan ini ada beberapa kegiatan yang dilakukan, salah satunya adalah estimasi biaya. Estimasi biaya memegang peranan penting dalam penyelenggaraan proyek, mengingat kesalahan dalam membuat estimasi proyek bisa berakibat kesalahan dalam pengambilan keputusan menjalankan proyek. Di masa pandemi Covid-19, banyak hal yang harus dipertimbangkan dalam merencanakan estimasi biaya proyek. Untuk menyelesaikan permasalahan terkait estimasi biaya proyek, dilakukan penelitian untuk mengetahui faktor serta metode yang digunakan dalam melakukan estimasi biaya. Analisis data dalam penelitian ini menggunakan metode Analytical Hierarchy Process (AHP). Hasil penelitian menunjukkan jika urutan faktor yang paling berpengaruh pada proses estimasi biaya yang dilakukan oleh kontraktor skala kecil di Bali selama pandemi Covid-19 antara lain, harga bahan dan material (14,6%), faktor harga upah (13,8%), spesifikasi proyek (12,8%), tipe bangunan (11,5%), durasi pekerjaan (10,4%), lokasi proyek (11,4%), metode yang digunakan (9,80%), sumber daya (9,50%), dan tahapan kegiatan (7,30%).
Identifikasi Faktor Yang Mempengaruhi Besaran Biaya Dalam Pelaksanaan Proyek Skala Kecil Di Bali Ida Ayu Cri Vinantya Laksmi; I Wayan Jawat; I Gusti Agung Gede Nodya Dharmastika
Borneo Engineering : Jurnal Teknik Sipil Volume 7 Nomor 3 Tahun 2023
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Borneo Tarakan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35334/be.v7i3.4548

Abstract

The realization of the implementation of a project must be within the initial project planning stage. In the planning stage, various types of activities are carried out, starting from forming the project team, preparing the schedule, planning project resources, and preparing project cost estimates. Cost estimation activities are one of the main processes in a construction project to determine the amount of funds that must be provided for a building. Without costs, the project will not be able to be implemented even if other resource elements are met. Costs in construction projects consist of direct costs and indirect costs. Based on these 2 (two) types of costs, research needs to be carried out to determine the factors that influence the nominal amount of these types. Data analysis in this research uses the Analytical Hierarchy Process (AHP) method. The results of the research show that the order of factors that have the most influence on the two types of costs include force majeure factors, availability of labor, detailed design plans, work methods, technical specifications, distance to the place where materials/tools are purchased, location of work/project, the environment around the project, and road conditions leading to the project.
IDENTIFIKASI PRODUKTIVITAS TENAGA KERJA UNTUK OPTIMASI ANGGARAN BIAYA DALAM PELAKSANAAN PROYEK SKALA KECIL DI BALI: Labor Productivity Identification for Budget Cost Optimization in Small-Scale Project Implementation in Bali Ida Ayu Cri, Vinantya Laksmi; Jawat, I Wayan; Dharmastika, I Gusti Agung Gede Nodya; Dewi, Ni Kadek Ayu Cipta; Putri, Komang Pipin Indraswari Berata
PUBLIKASI RISET ORIENTASI TEKNIK SIPIL (PROTEKSI) Vol 6 No 2 (2024): Vol. 6 No. 2 (2024)
Publisher : Universitas Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26740/proteksi.v6n2.p171-176

Abstract

The implementation of a construction project is highly dependent on the availability of labor which is the main driving force in the planning stage until the realization of the project. Without labor, it is impossible to achieve the goals of the project itself. The workability of the workforce is usually called productivity. One thing closely related to labor productivity is the cost of project implementation. The higher the productivity, the smaller the possibility of excess/inflation of project implementation costs, and vice versa. Based on this, further research is needed to determine the factors influencing labor productivity in implementing small-scale construction projects in Bali. Problem-solving and data analysis in this study used the Analytical Hierarchy Process (AHP) method. The results of the study showed that the most influential factors in labor productivity in project implementation were labor skills in carrying out work in the field (14.5%), equipment used during work (12.8%), the physical condition of workers (11.4%), job and work instructions given by superiors (11.3%), time schedule or work implementation time (10.5%), coordination between workers (10.2%), worker discipline during work or project implementation (10.1%), available materials (9.9%), and the last was the workspace or space available in carrying  a job (9.4%).
PERENCANAAN PELAKSANAAN PROYEK KONSTRUKSI KANTOR KPU KABUPATEN BADUNG Pramesti, I Gusti Ayu Dina; Jawat, I Wayan; Eryani, I Gusti Agung Putu
Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja) Vol 13 No 2 (2025): Jurnal Ilmiah MITSU
Publisher : Fakultas Teknik, Universitas Wiraraja

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24929/ft.v13i2.3574

Abstract

Construction project implementation planning is an important stage that aims to optimize time, cost, and quality of work. In the construction project of the Badung Regency KPU Office Building, implementation planning is very crucial considering the location of the project which is in a densely populated area, so that an appropriate and efficient implementation method is needed. The problems faced are how to prepare an implementation schedule, calculate resource requirements, and plan costs systematically so that the project can run according to plan. This study uses the Precedence Diagram Method (PDM) to prepare the project schedule and Microsoft Project as a visualization tool. In addition, an analysis of human resource needs, materials, and tools was carried out as well as the preparation of the Implementation Cost Plan (RBP) and Budget Plan (RAB). The results of the study show that implementation planning using the PDM method produces a structured and efficient project schedule. The total cost obtained from the RBP analysis results is IDR 4,159,270,327.34, while the RAB reaches IDR 4,623,397,141.26, with a cost difference of IDR 464,126,813.93. This research is expected to be a reference for planning the implementation of similar building construction projects, especially in the context of using the PDM method.
Strengthening Pengejaran Tourism Village through the Design of a Sustainable, Tourism-Based Information Centre in Kintamani I Kadek Merta Wijaya; I Wayan Jawat; I Made Surya Kumara
AJARCDE (Asian Journal of Applied Research for Community Development and Empowerment) Vol. 10 No. 1 (2026)
Publisher : Asia Pacific Network for Sustainable Agriculture, Food and Energy (SAFE-Network)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29165/ajarcde.v10i1.952

Abstract

Pengejaran Village in Kintamani District has significant natural and cultural potential. It can be developed as a community-based tourist village. However, realizing this potential faces substantial limitations in tourism support facilities, particularly regarding destination information provision and promotion of local resources. This research aims to strengthen Pengejaran Tourism Village development through the design of an Information Center to serve as an information hub and promotional space for the village's potential. The methodology employed includes field observations, interviews with community members and village officials, focused group discussions (FGD), and digital-based architectural design planning. The research findings demonstrate that the village center area holds a strategic position suitable for development as a gateway to village tourism activities. The Information Center design accommodates multiple functions, including a tourism information center, village potential gallery, MSME product promotion space, cultural performance venue, and public open space . Sustainable architecture principles are applied through optimized natural lighting, cross-ventilation, the use of local materials, and the integration of the building with open spaces. The design incorporates elements of Balinese vernacular architecture based on the Tri Hita Karana philosophy to maintain balance among humans, the environment, and local cultural values Contribution to Sustainable Development Goals (SDGs):SDG 8: Decent Work and Economic GrowthSDG 9: Industry, Innovation and InfrastructureSDG 11: Sustainable Cities and CommunitiesSDG 12: Responsible Consumption and Production
METODE PELAKSANAAN PEKERJAAN TIANG PANCANG SISTEM HIDRAULIC JACK IN (STUDI: PROYEK KCU BCA SUNSET ROAD BALI) Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 5 No. 1 (2016)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.5.1.243.43-52

Abstract

Metode konstruksi adalah bagian yang sangat penting dalam proyek konstruksi untuk mendapatkan tujuan dari proyek, yaitu biaya, kualitas dan waktu. Aspek teknologi, sangat berperan dalam suatu proyek konstruksi. Penggunaan metode yang tepat, praktis, cepat, dan aman, sangat membantu dalam penyelesaian pekerjaan pada suatu proyek konstruksi. Sehingga target waktu, biaya dan mutu sebagaimana ditetapkan akan dapat tercapai. Tujuan yang ingin dicapai dalam penulisan ini adalah :Untuk mengetahui metode pelaksanaan pekerjaan tiang pancang sistem hidraulic jack in. Hidrolik Sistem adalah suatu metode pemancangan pondasi tiang dengan menggunakan mekanisme hydraulic jacking foundation system. Sistem ini terdiri dari suatu hydraulic ram yang ditempatkan pararel dengan tiang yang akan dipancang, dimana untuk menekan tiang tersebut ditempatkan sebuah mekanisme berupa plat penekan yang berada pada puncak tiang dan juga ditempatkan sebuah mekanisme pemegang (grip) tiang, kemudian tiang ditekan ke dalam tanah. Dengan sistem pemancangan hidraulik dinilai efektif karena lebih ramah lingkungan (tidak menimbulkan suara bising, tidak menimbulkan asap dan tidak menimbulkan getaran pada tanah). Pengerjaan relatif lebih cepat dan dalam pelaksanaanya lebih mudah. Dapat langsung diketahui daya dukung tiang pancangnya. Kata kunci: metode, hidrolik sistem, tiang pancang
METODE PELAKSANAAN PEKERJAAN PONDASI (STUDI: PROYEK FAVE HOTEL KARTIKA PLAZA) Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 4 No. 2 (2015)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.4.2.247.22-34

Abstract

Tahap konstruksi merupakan tahap yang perlu mendapat perhatian agar tujuan utama menghasilkan proyek yang berkualitas dapat tercapai. Dalam tahap konstruksi, pengelola proyek hendaknya mempertimbangkan aspek positif dan negatif yang akan terjadi pada tahap berikutnya, yaitu tahap operasional.Keuntungan kontraktor akan diperoleh bila tepat dalam menerapkan metode konstruksi di lokasi proyek. Berbeda metode konstruksi pasti berbeda pula kebutuhan sumberdayanya, limbah yang dihasilkan, dan hampir dapat dipastikan berbeda dalam capaian tujuan proyek dalam aspek biaya, mutu dan waktu. Metode pelaksanaan konstruksi merupakan kunci untuk dapat mewujudkan seluruh perencanaan menjadi bentuk bangunan fisik. Pada dasarnya metode pelaksanaan konstruksi merupakan penerapan konsep rekayasa berpijak pada keterkaitan antara persyaratan dalam dokumen pelelangan (dokumen pengadaan), keadaan teknis dan ekonomis yang ada dilapangan, dan seluruh sumber daya termasuk pengalaman kontraktor Peranan metode pelaksanaan pekerjaan proyek konstruksi adalah untuk menyusun cara – cara kerja dalam melaksanakan suatu pekerjaan dan suatu cara untuk memenuhi, menentukan sarana – sarana pekerjaan yang mendukung terlaksananya suatu pekerjaan misalnya : menetapkan, memilih peralatan yang akan digunakan dalam pekerjaan yang sesuai dengan jenis pekerjaan yang efektif dan efisien dalam biaya operasi. Cara kerja juga dapat membantu dalam menentukan urutan pekerjaan, menyusun jadwalnya sehingga dapat menentukan penyelesaian suatu pekerjaan. Pondasi adalah bagian terendah dari bangunan yang meneruskan beban bangunan ke tanah atau batuan yang ada di bawahnya.Terdapat dua klasifikasi pondasi, yaitu pondasi dangkal dan pondasi dalam. Pondasi dangkal didefinisikan sebagai pondasi yang mendukung bebannya secara langsung, seperti: pondasi telapak, pondasi memanjang. Pondasi yang dipilih untuk gedung ini yaitu pondasi telapak. Metode pekerjaan proyek ini dilakukan dengan membagi dua zone pekerjaan, yaitu zona 1 yang dikerjakan terlebih dahulu kemudian zona 2. Terdapat dua pekerjaan tambah yaitu pekerjaan Sumpit di antara grid 10 dan grid 9 dibuat sumpit dengan ukuran 2 meter x 2 meter dan dalamnya 2,5 meter dari elevasi lantai basement dan pondasi mesin genset yang berada di Grid. Kata kunci: metode, konstruksi, pondasi
PENERAPAN METODE KONSTRUKSI DALAM MEWUJUDKAN GREEN CONSTRUCTION ( STUDI KASUS: PEKERJAAN TANAH PADA PROYEK JALAN ) Wayan Jawat
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 3 No. 2 (2014)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.3.2.263.61-80

Abstract

Setiap proyek konstruksi selalu membutuhkan sumberdaya proyek(project resource) sebagai komponen input dalam proses konstruksi. Ada 5 (lima) sumber daya proyek, yaitu pekerja (man), material (material), metode ( methode ), alat (machine), uang (money). Material bangunan dan alat bersifat tetap pada bangunan yang merupakan faktor penting jika suatu proyek diharapkan termasuk proyek hijau (green construction). Pemilihan metode konstruksi yang tepat akan menghasilkan keuntungan efisiensi proses konstruksi berupa keuntungan finansial. Dalam aspek lingkungan, efisiensi proses konstruksi berpotensi untuk memperpendek durasi konstruksi dan mereduksi waktu operasional berbagai peralatan yang terkait, sehingga konsumsi energi menjadi lebih sedikit dan berpengaruh pada menurunnya emisi CO2 ekivalen. Dalam mewujudkan green construction sebagai bagian dari sustainable construction hendaknya memperhitungkan dampak terhadap operasional bangunan maupun proses desain berupa umpan balik (feed back) yang bersumber dari pengalaman konstruksi. Kata kunci: proyek konstruksi, metode, green construction.