Claim Missing Document
Check
Articles

Found 15 Documents
Search

Penerapan Metode Seven Tools Dalam Pengendalian Kualitas Produk Diyaa Aaisyah Salmaa Putri Atmaja; Purbawati Purbawati; Mad Yusup
Jurnal Sistem Informasi dan Ilmu Komputer Vol. 2 No. 1 (2024): Februari : Jurnal Sistem Informasi dan Ilmu Komputer
Publisher : Universitas Katolik Widya Karya Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59581/jusiik-widyakarya.v2i1.2303

Abstract

Borneo Conblock Mandiri faces significant challenges in its monthly production, with an average of more than 50,000 paving units, but the number of defects exceeds 4,500 units. These defects include cracks, breaks, and uneven or jagged surfaces. To overcome this problem, a quality control analysis is proposed using the seven tools method to reduce defects and improve overall product quality. The research results show that in the production of Holand-type paving, the primary defects include 4,965 units (53%) cracks, 2,661 units (29%) broken, and 1,660 units (18%) the surface is not smooth. Human and machine factors were identified as the leading causes of defects in paving. The proposed solution is the addition of a foreman as an additional supervisor, especially in the production process. The new foreman inspects the material more intensively before it is put into the mixer. Hopefully, these steps can reduce the number of defects and improve overall product quality. The expected result of this research is that it can positively impact the productivity and reputation of Borneo Conblock Mandiri. By addressing the root causes of defects and implementing appropriate solutions, companies can improve their production processes and deliver higher-quality products in line with market demands.
Optimasi Kondisi Operasi Proses Elektroplating Nikel-Khrom Untuk Ketahanan Korosi Baja Profile L Mad Yusup; Diyaa Aaisyah Salmaa Putri Atmaja; Purbawati Purbawati; Ida Rosanti
Jurnal Kendali Teknik dan Sains Vol. 2 No. 3 (2024): Juli : Jurnal Kendali Teknik dan Sains
Publisher : Universitas Katolik Widya Karya Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59581/jkts-widyakarya.v2i3.3904

Abstract

This research aims to optimize the operating conditions of nickel-chrome electroplating to increase the corrosion resistance of L profile steel materials. Nickel-chrome electroplating is a metal coating method used to protect steel surfaces from corrosion and improve the aesthetic appearance. The electroplating process involves several variables such as solution concentration, temperature, current density, and plating time. In this research, various operating conditions were optimized to obtain maximum corrosion resistance. The experimental method was carried out with variations of these parameters and the results were evaluated using corrosion tests and microscopic analysis. The research results show that certain operating conditions produce a protective layer that is more effective in preventing corrosion on L profile steel. This optimization is expected to make a significant contribution in industrial applications that require high corrosion protection.
Penerapan Metode Seven Tools Dalam Pengendalian Kualitas Produk Diyaa Aaisyah Salmaa Putri Atmaja; Purbawati Purbawati; Mad Yusup
Jurnal ilmiah Sistem Informasi dan Ilmu Komputer Vol. 3 No. 3 (2023): November : Jurnal ilmiah Sistem Informasi dan Ilmu Komputer
Publisher : Lembaga Pengembangan Kinerja Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/juisik.v3i3.732

Abstract

Borneo Conblock Mandiri faces significant challenges in its monthly production, with an average of more than 50,000 paving units, but the number of defects exceeds 4,500 units. These defects include cracks, breaks, and uneven or jagged surfaces. To overcome this problem, a quality control analysis is proposed using the seven tools method to reduce defects and improve overall product quality. The research results show that in the production of Holand-type paving, the primary defects include 4,965 units (53%) cracks, 2,661 units (29%) broken, and 1,660 units (18%) the surface is not smooth. Human and machine factors were identified as the leading causes of defects in paving. The proposed solution is the addition of a foreman as an additional supervisor, especially in the production process. The new foreman inspects the material more intensively before it is put into the mixer. Hopefully, these steps can reduce the number of defects and improve overall product quality. The expected result of this research is that it can positively impact the productivity and reputation of Borneo Conblock Mandiri. By addressing the root causes of defects and implementing appropriate solutions, companies can improve their production processes and deliver higher-quality products in line with market demands.
Penerapan Diagram Sebab Akibat (Fishbone Diagram) pada Identifikasi Kerusakan Mekanisme Pengumpan dan Penyusuana Standard Operating Procedure Mesin Skrap Mad Yusup; Purbawati Purbawati; Diyaa Aaisyah Salmaa Putri Atmaja; Ida Rosanti
Mars : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer Vol. 3 No. 1 (2025): Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer
Publisher : Asosiasi Riset Teknik Elektro dan Informatika Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/mars.v3i1.619

Abstract

This study aims to use the fishbone diagram as a tool to identify the causes of damage to the feeder mechanism of scrap machines and to develop Standard Operating Procedures (SOP) that can improve performance and reduce the level of damage. This diagram is used to evaluate various elements that contribute to the damage of the feeder mechanism, such as human, machine, material, method, and environmental factors. Through this evaluation, the main causes of the damage can be identified, and appropriate corrective actions can be formulated. In addition, this research also aims to design SOPs that ensure more efficient operation of the scrap machine and reduce the likelihood of operational errors. The implementation of mechanism improvements and SOPs is expected to enhance the reliability of the scrap machine, reduce downtime, and increase productivity in the mechanical technology laboratory. The findings of this study are expected to make a significant contribution to the development of management systems and equipment maintenance in both industrial and educational sectors.
Teknologi Dalam Proses Produksi Sumur Gas di Pertamina Hulu Mahakam Area South Mahakam Endra Endra; Ida Rosanti; Diyaa Aaisyah Salmaa Putri Atmaja
Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri Vol. 3 No. 2 (2025): Manufaktur : Publikasi Sub Rumpun Ilmu Keteknikan Industri
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/manufaktur.v3i2.962

Abstract

Mahakam Working Area (WK Mahakam) is one of the largest oil and gas working areas in Indonesia managed by PT Pertamina Hulu Mahakam (PHM). WK Mahakam has large gas reserves, making it one of the largest contributors to national gas production. This study aims to determine the process of gas well production and know the technology used in the gas production process and know the efforts in increasing gas production in the Mahakam working area. The methods used are direct observation, interviews and literature studies. The results showed that the gas well production process consists of several stages, namely drilling, pipe installation, and gas processing.The technology used in the gas well production process includes directional drilling technology, horizontal drilling technology, Artificial Lift technology and Enhanced Oil Recovery technology. The efforts made by the company to increase gas production include exploration of new gas wells, development of gas production technology, improvement of production production, development of Artificial Lift technology, Enhanced Oil Recovery technology, a n d worker skills and implementation of digital technology.
Pengendalian Kualitas Air Limbah Industri Migas di Pertamina Hulu Mahakam (PHM) CPU Tambora Samarinda Gusti Firman Noor; Khoirul Huda; Mad Yusup; Diyaa Aaisyah Salmaa Putri Atmaja
Manufaktur: Publikasi Sub Rumpun Ilmu Keteknikan Industri Vol. 3 No. 2 (2025): Manufaktur : Publikasi Sub Rumpun Ilmu Keteknikan Industri
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/manufaktur.v3i2.963

Abstract

The research was conducted directly at the Pertamina Hulu Mahakam CPU Tambora Samarinda Company. The problem in this study is how to control the quality of wastewater and what factors affect the quality of wastewater in the PHM CPU Tambora Samarinda area, while the purpose of the study was to determine the control of wastewater quality and determine the factors that affect the quality of wastewater. Wastewater sampling was carried out in bottles for 31 days at 06.00 am and then sent to the laboratory for analysis of oil content in wastewater. The method used is the control map approach and fish bone diagram. The results of the study showed that the quality of wastewater was still within the standard quality limit of 12.5 ppm (still below the maximum standard of 40 ppm) and the dominant factor affecting the quality of wastewater was the equipment factor, namely due to damage to the pump
Penerapan Metode CPM (Critical Path Method) dalam Manajemen Servis Ganset Caterpillar di PT. Sigma Quantum Insani Balikpapan Kalimantan Timur Erwin Erwin; Purbawati Purbawati; Diyaa Aaisyah Salmaa Putri Atmaja; Ida Rosanti
Mars : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer Vol. 3 No. 4 (2025): Agustus : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer
Publisher : Asosiasi Riset Teknik Elektro dan Informatika Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/mars.v3i4.921

Abstract

Generator Set Service Management is the process of organizing maintenance, repair, and upkeep activities of generator sets, starting from planning, implementation, evaluation, control, and improvement of services to ensure the generator machine continues to operate effectively and efficiently. The research was conducted at PT. Sigma Quantum Insani, located in Balikpapan, East Kalimantan. The problem addressed in the research is the frequent delays in completing scheduled tasks within the generator set service management activities. The purpose of the study is to determine the critical path of activities and identify the duration of the critical path. From the analysis using the Critical Path Method (CPM) assisted by MS Project software, the identified critical path activities are: A1-B1-B2-B3-B4-B5-B6-B7-B8-B9-B10-B14-B16-B17-C1-C2-D1-D2-D3, which include DO approval, engineering scope, painting scope, and delivery scope. The total time obtained for the critical path is 38 days, resulting in a time efficiency of 8 days in the generator set service process.
Optimalisasi Strategi Bisnis UMKM: Analisis SWOT dan QSPM pada Yoga Barbershop di Palaran Diyaa Aaisyah Salmaa Putri Atmaja; Purbawati Purbawati; Adhe Dalle Tri Saputro; Desi Puspitasari; Muhammad Syarif; Muhammad Ilham Syahranie; Salma Maulina Wardhani
Mars : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer Vol. 3 No. 4 (2025): Agustus : Jurnal Teknik Mesin, Industri, Elektro Dan Ilmu Komputer
Publisher : Asosiasi Riset Teknik Elektro dan Informatika Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/mars.v3i4.923

Abstract

This study ais to formulate development strategies for Yoga Barbershop in Palaran, East Kalimantan, using SWOT analysis and the Quantitative Strategic Planning Matrix (QSPM). SWOT analysis is utilized to assess internal and external factors,combned with QSPM to determine priority strategies. The study reveals that Yoga Barbershop’s strengths nclude customer loyalty, a strategic location, modern haircut styles,and ownership of the business premises, which reduces operational costs.However, identified weaknesses consist of limited service facilities, inflexible operating hours, restricted space, noise issues, and insufficient staff. Meanwhile, opportunities for Yoga Barbershop include opening new braches and recruiting additional employees. Threats arise from similiar business competitors and changes in hairstyle trends. Based on the findings, Yoga Barbershop’s IE matrix places the business in quadrant V, with a total IFE score of 2,72 and an EFE score of 2,71, indicating a stable position that requires stability strategies. The recommended strategy is the weakness-opportunity (WO) approach. Priority strategic recommendations, in order of importance, are opening a new branch, training new staff, and increasing the flexibility of operational hours.
Pengaruh Beban Kerja dan Lingkungan Kerja Terhadap Produktivitas Karyawan di PT. Putra Tunggal Mandiritama Samboja-Kutai Kartanegara-Kalimantan Timur Muhammad Ridwan; Purbawati Purbawati; Diyaa Aaisyah Salmaa Putri Atmaja; Mad Yusup
Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika Vol. 3 No. 4 (2025): Juli: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/jupiter.v3i4.967

Abstract

The research was conducted in the construction department which has around 90 employees with a high workload and a less supportive work environment. The problem in this study is how the workload and work environment affect employee productivity, while the purpose of the study is to determine the effect of workload and work environment on employee productivity. The method used in the study is the multiple linear regression analysis method with a sample of 65 employees. Testing was carried out using the F test and t test and calculating the determination factor. From the results of the t test calculation, the calculated t-value for X1 (workload) was obtained in succession of 3,743 and the calculated t-value for X2 (work environment) was 6.187. These values ​​are greater than the value in the t-table of 1,999, which means that the workload affects employee productivity and the work environment affects employee productivity.The result of the F test calculation produces 14,872 > from the value in the F-table (3,143), it can be concluded that Workload (X1) and Work Environment (X2) have an effect on Employee Productivity (Y) at PT. Putra Tunggal Mandiritama. From the determination coefficient test, the Adjusted R Square value is 0.455 or 45.5%, meaning that the work productivity variable is influenced by the workload and work environment variables by 45.5%. Furthermore, the remaining value of 54.5% is caused by other factors.
Implementasi Predictive Maintenance Menggunakan Metode Infrared Thermography Pada Peralatan Listrik di PT Pertamina Hulu Mahakam Aji Sayuthi Ramadhan; Mad Yusup; Diyaa Aaisyah Salmaa Putri Atmaja
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 3 No. 3 (2025): Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v3i3.960

Abstract

Predictive Maintenance is a maintenance activity that focuses on monitoring equipment conditions in real-time and analyzing data to predict potential failures before they occur, allowing repairs to be made in a timely manner before major damage occurs. One of the methods used in predictive maintenance is "Infrared Thermography” or use of technology thermal imaging technology. In the context of predictive maintenance, thermography can be used to identify problems that are not visible to the naked eye, such as poor electrical connections, excessive heat buildup, or damage to components that cause heat leakage The purpose of this study was to determine the implementation of Predictive Maintenance with Infrared Thermography method on electrical equipment at PT PHM. The method used in this research is the observation method with primary and secondary data collection. The results showed that the implementation of predictive maintenance with the Infrared Thermography method on electrical equipment and systems at PT PHM was effective in helping the company avoid unnecessary costs and improve operational efficiency. Predictive maintenance allows companies to perform maintenance to identify potential damage before it occurs and can take preventive action so as to reduce repair costs, and operational productivity.