Claim Missing Document
Check
Articles

Found 4 Documents
Search

Analisa Kebutuhan Daya Listrik Terpasang pada Gedung CC Fkip Untirta Lantai 1 sampai 3 Shafa Yuniar Yasmin; Iqbal Maulana; Hijroh Tamamil Gina; Didik Aribowo
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 2 No. 2 (2023): Mei : Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : Pusat Riset dan Inovasi Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/juprit.v2i2.1652

Abstract

In the construction of a building, it is necessary to install a good electrical installation and calculate the required electrical power to be used because this is the initial foundation for building operation so that it can be used by building users. used is still within normal limits or not. The method used by researchers is qualitative with data collection techniques from literature studies and observations. In the findings of the researchers' observations, the results obtained that the electricity demand for the CC FKIP UNTIRTA building is still within normal limits because its use is in accordance with the needs of each room.
Pelatihan Robot Soccer Bagi Siswa-Siswi SMKN 4 Kota Serang Fikri Ardiyansah; Ihsan Faturrohman; Yoga Dwi Septiyanto; Siti Sypah Fauziyah; Khaila Mardina Fauziah Awalia; Prasta Mahrifatika; Repdhi Febriyan; Yudi Syah Pratama; Hijroh Tamamil Gina; Muhammad Reza Nugraha; Deva Adelya Prestanty; Irwanto Irwanto
Jurnal Elektronika dan Teknik Informatika Terapan ( JENTIK ) Vol. 1 No. 4 (2023): Desember: Jurnal Elektronika dan Teknik Informatika Terapan (JENTIK)
Publisher : Politeknik Kampar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59061/jentik.v1i4.518

Abstract

In the era of the Merdeka Curriculum, Industry 4.0 encompasses online learning, data analysis, artificial intelligence, the Internet of Things, digital skills development, project-based learning, and innovation. This enables a more personalized, efficient, and relevant education, while prioritizing equal access to technology and student data security and privacy. Community service in this context aims to provide introduction and training packaged in the form of a one-day workshop to attract the interest and talents of students at SMKN 4 Kota Serang to the basics of robotics, hardware components, software, as well as the design of hardware and software for soccer robots. The outcome of this activity is that students are able to understand the basic components, programming concepts of soccer robots, and can assemble a soccer robot module effectively and operate it. Many students are enthusiastic about this activity and express hope that it can continue so that a new robotics team can be formed at SMKN 4 Kota Serang, preparing them for upcoming robot competition championships.
Perencanaan Panel Listrik Lift di PT Tiga Kreasi Indonesia Hijroh Tamamil Gina; Mustofa Abi Hamid
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 2 No. 4 (2024): Agustus : Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v2i4.398

Abstract

The main purpose of this study is to investigate in depth regarding the planning of electrical panels to be used in elevator systems. The method used is a literature study followed by the creation of panels and data collection. This process starts from the initial stage, namely making drawings of the electrical panel series, then continues with construction planning and installation of the overall elevator system. Selain itu, pengecekan berkala terhadap kualitas lift yang dipasang juga menjadi fokus utama dalam penelitian ini. This is important to ensure that elevators operating in these tall buildings can maintain safety and comfort when used by people and in the process of transporting goods to various floors of the building. Thus, it is hoped that the results of this study can make a meaningful contribution in improving the efficiency and safety of vertical transportation within modern high-rise buildings.
SIMULASI JARINGAN METRO ETHERNET DENGAN APLIKASI CIS-CO PACKET TRACER VERSI 6.2.0 Naufal Taufiqul Hakim; Hijroh Tamamil Gina; Apriliano Chandra Diva; Gilang Gemilang; Didik Aribowo
Jurnal Sains dan Teknologi Vol. 2 No. 1 (2023): Juni : Jurnal Sains dan Teknologi
Publisher : Fakultas Teknik Universitas Cenderawasih

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58169/saintek.v2i1.130

Abstract

Metro ethernet is an ethernet-based high-capacity data network solution service that provides flexibility, simplicity and quality of service (qos) to business customers of internet service providers (isp) and other licensed service providers (olo). Ethernet has speeds of up to 10 gbps and with distances of tens or even hundreds of kilometers. The method used in writing this journal is to use the literature review method, namely the method used is the result of an analysis of various previously published scientific article information. Utilization of metro ethernet in its benefits, namely managing risk intelligently, in its management functioning and running independently, namely utilization for each operational, functional and administrative. Reliability, in operation metro ethernet will detect and track discovery to report that it is in a connection failure situation in its performance measurement. Flexibility, support for various services and transportation. Cost-efficiency, simple and highly maintainable metro ethernet network scalability, supports speeds up to 10 gbps. This research was made to find out more about the uses of the metro ethernet network and the configuration on metro ethernet.