Claim Missing Document
Check
Articles

Found 3 Documents
Search

ECONOMIC VALUATION STUDY OF GEMBIRA LOKA YOGYAKARTA ZOO Fallo, Trisno; Nugroho, Andri Prasetyo; Setyowati, P. Ratna; Edi Laksono, Gangsar; Doni, Doni; Farras, Farras
Quantitative Economics Journal Vol 13, No 1 (2024): APRIL 2024
Publisher : Universitas Negeri Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24114/qej.v13i1.61030

Abstract

The aim of this study is to analyze the potential total economic value of the Gembira Loka Zoo tourist area and also as input and consideration in making policies regarding the management of the Gembira Local Zoo tourist area, both for the management and the government. Primary data collection techniques were carried out through survey and interview methods in the form of onsite using questionnaires. This research uses a direct approach with market value, surrogate market costs through the travel cost method and contingent valuation method (CYM) as well as to assess the benefits produced (products and services) by the Gembira Loka Zoo. Based on the results of the analysis, a study of the total economic value of the Gembira Loka Zoo zoo area, it can be concluded that the direct use value of the Gembira Loka Zoo zoo in 2023 is IDR. 333,585,267,958.80, and was obtained from calculating travel costs incurred by respondents with total ticket income. The indirect use value of the Gembira Loka Zoo zoo in 2023 was IDR 1,419,904,680.12, and was obtained from an economic assessment of the ecological benefits of forest areas in zoos, namely as a carbon absorber and water catchment, while the economic value of preservation aims to calculate respondents' willingness to participate in preserving animals at Gembira Loka Zoo. The total preservation value is IDR 39,264,801,732 and the total economic valuation of Gembira Loka Zoo is IDR. 374,269,974,370.92.
KESELAMATAN DAN KESEHATAN KERJA (K3): PILAR UTAMA DALAM PRODUKTIVITAS DAN KEBERLANJUTAN Farras, Farras; Jumhana, Enjum; Fadilah, Anis; Adha, Adha; Novrio, Muhammad Jiddan Anugrah; Haki, Ubay
Bureaucracy Journal : Indonesia Journal of Law and Social-Political Governance Vol. 5 No. 1 (2025): Bureaucracy Journal : Indonesia Journal of Law and Social-Political Governance
Publisher : Gapenas Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53363/bureau.v5i1.548

Abstract

Occupational Safety and Health (OSH) is a vital component in creating a safe, healthy, and productive work environment while protecting workers from the risks of accidents and work- related illnesses. This article provides an in-depth review of the basic concepts of OSH, the underlying regulations, workplace risk factors, and effective implementation strategies. In Indonesia, OSH implementation is governed by Law No. 13 of 2003 on Manpower and Law No. 1 of 1970 on Occupational Safety. Despite the availability of regulations, OSH implementation still faces various challenges, particularly in the informal sector and small and medium enterprises. This article identifies various risk factors that can affect the safety and health of workers, including physical, chemical, biological, ergonomic, and psychosocial risks. Strategies such as strong policy formulation, continuous training, routine audits, and active worker participation can help minimize these risks. The use of modern technology, such as automated detection devices and safety sensors, also supports more effective risk management. The findings of this study reveal that optimal OSH implementation not only reduces workplace accidents and work-related illnesses but also provides significant benefits for companies. These benefits include increased productivity, operational efficiency, worker motivation, and the organization's reputation as an entity that cares about employee welfare. Therefore, OSH is not merely a legal obligation but also a strategic investment that supports business sustainability and long-term worker welfare
IMPLEMENTASI BUILDING INFORMATION MODELING (BIM-5D) PADA ANALISIS CLASH DETECTION DAN PERHITUNGAN MUTUAL CHECK 0% (MC 0%) PROYEK PEMBANGUNAN POLDER SUNTER C (STUDI KASUS: PEMBANGUNAN POLDER / POMPA KBN, SUNTER C, GREENVILLE (RW13), DAN IKPN BINTARO) Farras, Farras; Apdeni, Risma
Jurnal Applied Science in Civil Engineering Vol 6 No 2 (2025): Jurnal Applied Science in Civil Engineering
Publisher : Teknik Sipil Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/asce.v6i2.126283

Abstract

Penelitian ini dilatarbelakangi oleh permasalahan yang sering terjadi dalam pembangunan infrastruktur, yaitu perubahan volume pekerjaan atau penambahan anggaran yang disebabkan oleh ketidaksesuaian antara volume kontrak dengan volume pada gambar desain rencana. Proses Mutual Check 0% (MC 0%) diperlukan untuk mendapatkan volume riil berdasarkan gambar rencana, namun seringkali terlambat dilaksanakan dan dilakukan bersamaan dengan konstruksi berjalan. Hal ini menuntut estimator untuk bekerja dengan waktu yang singkat dan hasil yang akurat. Selain itu, adanya potensi clash (tabrakan) antara desain bangunan baru dengan utilitas eksisting juga dapat mengganggu proses pembangunan konstruksi. Untuk mengatasi masalah-masalah tersebut, perlu dilakukan upaya untuk meningkatkan efektivitas dan efisiensi perhitungan MC 0% dalam proyek konstruksi dengan menerapkan teknologi berbasis Building Information Modelling (BIM). Tujuan utama dari penelitian ini adalah menganalisis terjadinya potensi clash pada desain bagunan baru dan untuk menyusun perhitungan volume MC 0% serta estimasi biaya pekerjaan struktur menggunakan teknologi berbasis BIM. Dengan mengumpulkan data berupa Detail Engineering Desain (DED), Rancangan Anggaran Biaya (RAB) dan Kurva S maka dapat dilakukan pemodelan 3D menggunakan bantuan software Autodesk Revit. Pemodelan 3D secara otomatis dapat mengeluarkan hasil dari volume pekerjaan (Quantity Take-Off) dan menganalisis potensi terjadinya clash antar elemen bangunan. Dengan Analisis Harga Satuan Pekerjaan (AHSP) yang telah ada maka dapat dilakukan perhitungan estimasi biaya. Hasil dari penelitian ini menunjukkan bahwa pada proyek pembangunan polder Sunter C ini, terdapat identifikasi terjadinya clash sebanyak 7 elemen antara desain struktur bangunan baru dengan kondisi eksisting bangunan dan selisih perhitungan estimasi biaya yang lebih rendah senilai Rp. 3.123.473.431,75 dari total estimasi biaya MC 0% konvensional (manual), dengan tetap mempertahankan lingkup pekerjaan yang sama dan data pemodelan yang lebih akurat.