Claim Missing Document
Check
Articles

Found 2 Documents
Search

Identifikasi Risiko Terhadap Faktor – Faktor Sumber Daya Proyek Drainase di Provinsi Aceh Agus, Suci Tiara; Mubarak, Mubarak; Fachrurrazi, Fachrurrazi
Journal of The Civil Engineering Student Vol 5, No 4 (2023): Volume 5 Nomor 4 Desember 2023
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/journalces.v5i4.20823

Abstract

Drainase termasuk ke dalam salah satu proyek infrastruktur yang berkaitan dengan masalah limpasan air permukaan. Drainase adalah fasilitas yang dibangun untuk memenuhi kebutuhan masyarakat. Selama masa pelaksanaan proyek drainase tidak terlepas dari adanya risiko yang timbul dan mempengaruhi waktu, biaya, dan kualitas. Apabila kemunculan risiko tidak ditangani dengan benar maka akan menghambat proses pelaksanaan proyek. Oleh karena itu, adanya pengelolaan risiko pada manajemen proyek sangat diperlukan untuk mengidentifikasi jenis, besar, dan sumber yang menyebabkan risiko ketika proyek berlangsung. Tujuan dari penelitian ini adalah mengetahui faktor – faktor risiko sumber daya dan potensi kemunculan pada pelaksanaan proyek drainase. Metode yang digunakan yaitu campuran dengan sumber data primer diperoleh dari kuesioner dan data sekunder diperoleh dari hasil studi literature. Pengujian data primer dilakukan dengan uji validitas menggunakan korelasi pearson product moment dan reliabilitas menggunakan rumus KR.20, sedangkan potensi kemunculan risiko dihitung menggunakan analisis deskriptif, dan analisis frequency index (FI). Dari hasil penelitian ditemui 34 variabel sumber daya proyek yang terjadi pada pelaksanaan proyek drainase di Provinsi Aceh. Faktor risiko sumber daya yang paling sering ditemui pada pelaksanaan proyek drainase di tahun 2021 adalah variabel kenaikan harga material (A1) dari faktor risiko material,  dengan nilai kriteria frekuensi “Sering”.
Measuring the Impact of External Risk Factors on Costs for Drainage Construction Projects in Aceh-Indonesia Mahmuddin, Mahmuddin; Mubarak, Mubarak; Fachrurrazi, Fachrurrazi; Ziana, Ziana; Agus, Suci Tiara
Elkawnie Vol. 12 No. 1 (2026)
Publisher : Faculty of Science and Technology Universitas Islam Negeri Ar-Raniry

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22373/ekw.v12i1.21011

Abstract

Abstract: Infrastructure projects are always faced with uncertainty and risks, both from within and outside the project, including drainage projects. An understanding of the sources and impacts of risks is required for construction implementers to minimize the negative effects of these risks. One of the impacts commonly experienced by construction companies is the emergence of cost overruns, which can potentially lead to project failure. This study aimed to analyze the impact of risk on cost for external factors in the implementation of drainage projects in Aceh Province in 2021. Employing a mixed-method approach, primary data were gathered through the distribution of questionnaires to 52 respondents actively engaged in project implementation. The questionnaire was designed to collect information on the impact of risk on costs for 3 external factors, namely social (2 variables), government policy (2 variables), and disaster (4 variables). The impact of risks was assessed using the severity index (SI) analysis. The findings revealed eight external risk variables exerting an influence on the cost of implementing drainage projects in Aceh Province in 2021. The most substantial impact on cost was categorized as "moderate" and manifested in two variables: uncertain weather conditions (SI = 0.400) and flooding (SI = 0.388). Understanding the potential impact of risks on project costs, especially those originating from external factors, will make it easier for contractors to plan risk mitigation and ensure the project is completed on target. Abstrak: Drainase merupakan salah satu proyek infrastruktur yang tidak lepas dari risiko-risiko yang dapat memengaruhi tujuan proyek. Risiko pada proyek dapat berasal dari faktor eksternal yang berasal dari luar dan tidak berhubungan dengan kegiatan proyek, namun dapat berdampak pada pencapaian tujuan proyek. Penerapan manajemen risiko perlu diaplikasikan, utamanya berkenaan dengan pemahaman terhadap potensi risiko yang dihadapi dan dampak yang ditimbulkan. Pembengkakan biaya merupakan bentuk risiko yang sering terjadi dan dapat berakhir pada kondisi terburuk berupa kegagalan proyek. Tujuan penelitian ini adalah menganalisis dampak risiko terhadap biaya pelaksanaan proyek dari faktor-faktor risiko eksternal. Objek penelitian ini difokuskan pada proyek drainase di Provinsi Aceh yang dilaksanakan pada tahun 2021. Data penelitian ini diperoleh melalui penyebaran kuesioner kepada 52 responden yang terlibat dan berperan langsung dalam pelaksanaan proyek. Kuesioner disusun untuk mengumpulkan informasi dampak dari 3 faktor eksternal, yaitu faktor sosial (2 variabel), faktor kebijakan pemerintah (2 variabel) dan faktor bencana (4 variabel). Dampak risiko terhadap biaya diukur dengan analisis severity index (SI). Dari 8 variabel yang dianalisis, dampak risiko tertinggi yang ditemukan muncul pada 2 variabel dengan level dampak "sedang." Variabel-variabel tersebut adalah kondisi cuaca yang tidak menentu (SI = 0,400) dan banjir (SI = 0,388). Dengan mengenali potensi dampak risiko terhadap biaya, khususnya pada faktor-faktor eksternal, kontraktor dapat lebih awal bersiap dan merencanakan mitigasi risiko untuk memastikan proyek dapat diselesaikan sesuai dengan sasaran.