Claim Missing Document
Check
Articles

Found 2 Documents
Search

RANCANG BANGUN SISTEM PEMANTAUAN DATA PENGUJIAN PERFORMA TRANSMISI KOMATSU HD785-7 PADA MESIN MARUMA MH-125D BERBASIS MICROCONTROLLER Setiawan, Leo; Syaifullah, Herry; Hidayat, Rafiq; Haryadi, Setyo; Kacaribu, Brim Ernesto
Jurnal Inovasi Teknik Industri Vol 3, No 1 (2024): JURNAL INOVASI TEKNIK INDUSTRI
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat Universitas Muhammadiyah Gombong

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26753/jitin.v3i1.1368

Abstract

PT X merupakan salah satu perusahaan di bidang industri alat berat yang berdomisili di Balikpapan Kalimantan Timur. Bidang alat berat yang dimaksud ada remanufaktur komponen alat berat. Salah satu komponen alat berat yang diremanufaktur adalah transmisi. Transmisi alat berat yang menjadi objek penelitian kami adalah Torqflow Transmission Komatsu HD785-7 dengan menggunakan alat uji performa Maruma MH-125D. Dengan alat ini transmisi dikondisikan layaknya transmisi yang dipasang di unit alat berat, transmisi diputar 1200-1950 RPM dan diberikan tekanan oli hidrolik 1,7-33,5 kg/cm2. Adapun nilai rpm dan tekanan oli hidrolik tersebut merujuk pada nilai standar yang tercantum pada Shop Manual Komatsu HD465-7. Untuk pengukuran tekanan oli yang diberikan ke transimisi masih menggunakan analog pressure gauge. Sehingga hasil ukur harus dicatat secara manual, operator harus terus mengamati setiap perubahan jarum pressure gauge, mencatat tekanan minimumĀ  dan maksimum. Pada akhirnya akuisisi data secara manual, ini dinilai tidak efisien. Sehingga diperlukan cara mengakuisisi data secara digital agar analisis data sampai dengan penyajian data berupa testing report dapat lebih cepat dan akurat.
OPTIMIZATION OF THE REPLACEMENT PROCESS FOR THE BRAKE SHOES ISUZU GIGA TRUCK AT PT AI-ISO DM JAKARTA BRANCH Manurung, Vuko A T; Dwicahyo, Mohammad R.; Wibowo, Yohanes T.; Haryadi, Setyo
AUSTENIT Vol. 15 No. 1 (2023): AUSTENIT: April 2023
Publisher : Politeknik Negeri Sriwijaya, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53893/austenit.v15i1.6621

Abstract

PT AI-ISO workshop on DM Jakarta provides various repair and periodic maintenance services. In periodic maintenance, brake repair jobs have problems replacing the brake pads (brake shoe set) of Isuzu Giga Trucks, which takes about 9 hours. To reduce the processing time, an improvement process is carried out to shorter processing time, so the customer feels more satisfied with repairing his vehicle. From observations, the length of work time was due to the process of changing the brake pads outside the workshop due to the absence of tools to install the brake pads. The repair shop offers to replace a set of brake pads, but the price is higher than just replacing the brake pads, so the customer makes this choice. The improvement made was the manufacture of a rivet installation tool on the brake pads based on the workings of a rivet machine. First, it is necessary to make a brake pad holder so that it does not shift when pressed and ensures that the pressure acting on the rivet is as requested. This tool is also equipped with a Standard Operation Procedure to make it easier for technicians to replace brake pads. The result is a decrease in processing time for the brake pad replacement process from an average of 9 hours to 5 hours. With these tools, repairing the brake system can be accelerated and within the safe limits required in the vehicle's manual, and the customer will be more satisfied.