Optimization of Road Handling Priorities Using Provincial/District Roads Management System Integration and Analytical Hierarchy Process at UPT PJJ Surabaya, East Java Nur Aini Farida; Laksono Djoko Nugroho; Haris Muhammadun
TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES Vol. 4 No. 1 (2025): JANUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/tires.v4i1.1568

Abstract

This study aims to identify the priority order for road maintenance on road sections under the Surabaya Road and Bridge Management Unit (UPT PJJ Surabaya) in East Java Province by utilizing the Provincial/District Roads Management System (PKRMS) application integrated with the Analytical Hierarchy Process (AHP) method. Additionally, the study seeks to estimate the required costs for implementing the road maintenance. The research adopts a quantitative approach with a positivist philosophy. The study population consists of 123 employees from the East Java Provincial Public Works and Highways Agency, with a sample of 33 respondents selected using purposive sampling techniques. Data were collected using a mixed-method approach, involving road condition surveys conducted through the Moving Car Observer (MCO) method and a literature review. Data analysis was conducted systematically using a combination of PKRMS and AHP. The results indicate that the top-priority road section for maintenance, based on the integration of PKRMS and AHP, is the Sumberwudi–Karang Geneng section, which obtained the highest Priority Index Score (TPI) of 56. The estimated cost required for maintaining this road section is Rp16,475,545,104.98. The integration of PKRMS and AHP provides an objective, efficient, and data-driven approach, enabling local governments to optimize budgets and extend the lifespan of road infrastructure. This study recommends that local governments consistently adopt the combination of PKRMS and AHP in road infrastructure management to ensure more targeted budget allocation and enhance transparency in decision-making processes.
Analysis of Road Infrastructure Condition Based on Traffic Density in Bengkulu City Sugeng Pujiyono; Laksono Djoko Nugroho; Haris Muhammadun
TRANSPUBLIKA INTERNATIONAL RESEARCH IN EXACT SCIENCES Vol. 4 No. 1 (2025): JANUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/tires.v4i1.1590

Abstract

The purpose of this research is to explain the analysis of road infrastructure conditions, in terms of traffic density and road quality in Bengkulu City. The research method uses descriptive with qualitative approach, Research Subjects, are people and government institutions, key informants are all people or officials related to road infrastructure policy makers, traffic density and road quality, such as traffic police, transportation department, PUPR department, BPS Bengkulu City. Informants are people or government institutions/institutions that are the object of research, the number is determined based on the criteria of this research. in the form of structured questions for interviews to Informants, Key informants and Triangulation of data. Data Collection Techniques present the sampling methods and data collection techniques used, such as field surveys, direct observation, or the use of secondary data. The results of the analysis using Neil S. Grigg's Infrastructure Management theory state that the condition of Road Infrastructure in Bengkulu City is good based on the criteria of the transport system (roads and bridges), clean water and sanitation systems and energy and other public facilities.
Analysis of Road Damage Using the Bina Marga Method on the Lamongan City - Mojokerto Border Road Section Anang Mashudi; Haris Muhammadun; Risma Marleno
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.15

Abstract

Road as an important facility for the community to achieve a desired goal both mobilizing goods and services. On the Lamongan City – Mojokerto Regency Border Road Section of STA 20+000 - 26+000 based on the field has experienced a decrease in road services that are not stable / comfortable with a lot of damage to the road. This study aims to determine the priority order value of road surface damage based on the Bina Marga method, determine the handling of road maintenance and the cost of handling road maintenance based on the two methods. From the results of the research, the priority order value of road damage on the Lamongan City - Mojokerto Border Road Section of STA 20+000 - 26+000 with the Bina Marga method is the priority order value of road damage 5.5, this includes a periodic maintenance handling program, the cost of handling road maintenance with the Bina Marga method is Rp. 9,479,663,479.46.
Analysis of Remaining Project Cost Estimate Temporary Schedule (ETS) & Final Project Time Estimate All Schedule (EAS) Edwin Octavianto Saputra; Haris Muhammadun; Risma Marleno
International Journal of Social Science and Community Service Vol. 2 No. 3 (2024): JULY
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i3.18

Abstract

The wheat silo and pellet silo structure repair project phase 3 by PT ISM Bogasari Surabaya is an annual infrastructure maintenance and strengthening activity aimed at supporting the smooth production process. Therefore, it is crucial to complete the project on time according to the contract to proceed to the next stage of repair and avoid delays that could result in cost overruns. This study uses Earned Value Method (EVM) analysis to address these issues and assess the performance of costs and implementation time as the project progresses. The indicators used in the analysis include the calculation of Estimated To Complete (ETC) and Estimated At Complete (EAC) for forecasting project completion costs, and Estimated Temporary Schedule (ETS) and Estimated All Schedule (EAS) for forecasting project completion time. Based on the results of the cost and time performance analysis, the EAC value is 0.77% smaller, which is Rp. 21,825,605,678, compared to the contract value. The time to complete the EAS project is 481 days, with an addition of 26 days, resulting in a 0.6% longer project completion time.
Cost, Time and Pavement Alternatives Analysis of Technical and Costs Arief Budiyanto; Haris Muhammadun; Risma Marleno
International Journal of Social Science and Community Service Vol. 2 No. 2 (2024): APRIL
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i2.20

Abstract

The research on the Teuku Umar Road - Rajawali Road Preservation project aims to find out the technical calculations, costs and time so that a more efficient alternative can be chosen. The calculation analysis on Rigid Pavement and Flexible Pavement uses the Road Pavement Design Manual Method No. 02 / M / BM / 2017 with a 20-year plan life. In the calculation of the AHSP cost analysis of the Highways Sector in accordance with Permen PUPR No. 8 of 2023. Periodic maintenance costs for rigid pavement are 6% and routine maintenance costs on flexible pavement are 2% while periodic maintenance costs are 8% of the initial budget. The results of this research analysis show the cost of rigid pavement is Rp. 11,349,200,000 and the implementation time is 120 calendar days. While the cost of flexible pavement is Rp. 8,414,500,000 and the implementation time is 95 calendar days. The results of the calculation of choosing a more efficient alternative based on the calculation of Capitalized Cost show that rigid pavement in terms of cost is smaller than flexible pavement, so rigid pavement alternatives are chosen.
Investment Sensitivity Analysis of Transjatim Corridor I Luxury Sidoarjo-Surabaya-Gresik Route Kiki Devita Novalia; Haris Muhammadun; Risma Marleno
International Journal of Social Science and Community Service Vol. 2 No. 2 (2024): APRIL
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i2.21

Abstract

Based on the recapitulation of Transjatim Corridor I passengers in 2023, the average load factor is 120%, with an average of 5-6 thousand passengers per day, leading to the addition of a fleet with luxury services. This study aims to analyze the financial feasibility of investment in the Transjatim Luxury Bus Corridor I by comparing income and expenditure variables using the Net Present Value (NPV), Benefit-Cost Ratio (BCR), Internal Rate of Return (IRR), and Payback Period (PP) methods. With a 6% discount rate, the analysis yielded NPV values > 0 (Rp. 5,204,972,631 for alternative 1, Rp. 2,466,479,592 for alternative 2, and Rp. 640,817,566 for alternative 3), IRR values > 6% (19.42% for alternative 1, 12.54% for alternative 2, and 7.74% for alternative 3), and BCR values > 1 (1.30 for alternative 1, 1.19 for alternative 2, and 1.11 for alternative 3). The PP values were 4 years for alternative 1, 5 years for alternative 2, and 6 years for alternative 3, indicating that all three alternatives are financially feasible. Sensitivity analysis confirmed the financial feasibility of all three alternatives, considering the effect of the discount rate on NPV.
Comparative Analysis of Road Network Simulation Model Performance of Pahlawan Road Area Fikri Haikal Zein; Haris Muhammadun; Risma Marleno
International Journal of Social Science and Community Service Vol. 2 No. 2 (2024): APRIL
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i2.22

Abstract

The solution to the transportation problem lies in assessing the performance of related road sections and intersections, and analyzing different traffic management schemes to optimize efficiency. This study aims to compare the performance of a road network simulation model for the Pahlawan road area. Data analysis includes examining origin-destination matrices, vehicle free speeds, vehicle behavior, and intersection control. The simulation model, calibrated and validated using Vissim, represents real-world conditions. Implementing SLFF (Single Lane Free Flow) and MLFF (Multi Lane Free Flow) systems at toll gates (scenarios 1 and 2) reduced queues, particularly at the Pancasila Monument Roundabout and Jalan Jati Raya. Adding a new toll gate via Jalan Kahuripan further improved traffic on Jalan Pahlawan compared to scenarios 1 and 2. However, converting the Gelora Delta roundabout into an underpass without additional measures worsened toll gate queues. Effective traffic performance can be achieved by combining the Gelora Delta roundabout underpass with either the SLFF toll payment system (scenario 5), MLFF (scenario 6), or the addition of a new toll gate (scenario 3).