Claim Missing Document
Check
Articles

Found 1 Documents
Search

IMPLEMENTASI METODE FIXED PERIOD REQUIREMENT DAN LEAST UNIT COST DALAM MATERIAL REQUIREMENT PLANNING (MRP) UNTUK KOMPONEN SKIN D-NOSE AIRBUS A350 Setianto, Nasrul; Arianty Syamsi, Wuri; Ihsan, Tiaradia
Kohesi: Jurnal Sains dan Teknologi Vol. 6 No. 9 (2025): Kohesi: Jurnal Sains dan Teknologi
Publisher : CV SWA Anugerah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.3785/kohesi.v6i9.10313

Abstract

This study focuses on evaluating the efficiency of managing raw material inventory with the Material Requirements Planning (MRP) method to reduce inventory costs at PT DXI.This research method was carried out using quantitative methods with the data source used being secondary data through historical company demand data. The MRP method in the research is applied to identify raw material needs based on historical demand data, calculate optimal ordering schedules, and evaluate the impact on inventory costs. The Lot Sizing technique used in this MRP method is Fixed Period Requirement and Least Unit Cost. Research findings indicate that implementing the MRP Lot Sizing method significantly reduces inventory costs. The aviation manufacturing sector benefits greatly from this study, particularly within supply chain management, demonstrates significant efficiency improvements, which is intricate and ever-changing. It is envisaged that using this approach will help with attempts to keep a sustainable supply of components and optimize the production process.