A Fuzzy Approach on Earned Value Method to Evaluate Project Performance in Solojebres Commuter Depot Ahmad Kahfi Firdausi; M. Ruslin Anwar; Arief Rachmansyah
Rekayasa Sipil Vol. 18 No. 3 (2024): Rekayasa Sipil Vol. 18 No. 3
Publisher : Department of Civil Engineering, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.rekayasasipil.2024.018.03.3

Abstract

The high level of public interest in using the Solo-Jogja commuter needs to be accompanied by an effort to improve the services and reliability of facilities, one of which is the establishment of a Commuter Depot located at Solojebres Station. In the 18th month of work, the construction of the Commuter Depot experienced delays in work performance with a deviation between plan progress and actual progress of -3.5415%. This research aims to evaluate project performance, including the project's cost and schedule performances, and estimate the cost and schedule of the project at completion due to delays that occur using the Earned Value Method with a fuzzy approach. The required data are the Budget Plan, Weekly Project Report, S-curve, and Actual Cost data. Based on the analysis result, until the 18th month of work, obtained the total Planned Value of IDR 64,581,925,585 (simplified to IDR 6,458.2), the total Actual Cost of IDR 63,954,955,399 (simplified to IDR 6,395.5), the total Fuzzy Earned Value of IDR 62,740,381,379.42 (simplified to IDR 6,274.0), the Cost Performance Index indicates that the project is ahead of budget condition, the Schedule Performance Index indicates that the project is behind schedule condition, the Cost Estimate at Completion of IDR 96,048,508,686 with the cost needed to complete the rest of work of IDR 32,093,553,287 and the Schedule Estimate at Completion of 27.03 months with the time required to complete the rest of work of 9.03 months.
EKSPERIMENTAL PENYEMPURNAAN TUMPUAN JENIS BASE ISOLATION UNTUK MEREDUKSI PENGARUH GEMPA PADA MODEL PORTAL BAJA. Ahmad Kahfi Firdausi; Taufiq Rochman; Sunarto Suryanto
Jurnal Online Skripsi Manajemen Rekayasa Konstruksi (JOS-MRK) Vol. 1 No. 3 (2020): DESEMBER 2020
Publisher : Jurusan Teknik Sipil Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Salah satu dampak yang paling terlihat akibat dari gempa bumi adalah kerusakan pada struktur bangunan gedung. Tujuan dari skripsi ini adalah untuk merancang base isolation yang tahan terhadap gaya gempa lateral dengan varian roll dan menghitung perkiraan biaya dari pengerjaan base isolation baja. Data yang dibutuhkan adalah desain portal baja lima lantai, sepuluh lantai, limabelas lantai, desain base isolation baja dan daftar harga satuan. Proses perekaman percepatan menggunakan software AndroSensor dan analisis menggunakan Microsoft Excel. Berdasarkan hasil analisis pengujian meja getar, diperoleh sebuah respon tereduksi pada kondisi kerusakan sedang pada atap portal sepuluh lantai dengan base isolation dua roda dimana percepatan rata-rata berkurang 20%, menyebabkan percepatan maksimum berkurang 22% dan pada atap portal lima lantai dengan base isolation tiga roda dimana percepatan rata-rata berkurang 38%, menyebabkan percepatan maksimum berkurang 35%, serta estimasi biaya pengerjaan pemodelan base isolation baja dengan satu roda sebesar Rp 273.200, dua roda sebesar Rp 275.700, dan tiga roda sebesar Rp 278.300.