Analisis Keterlambatan Pembangunan Gedung Kampus Poltekkes Banten Raharjo, Muji; Azhar, Moh.
Jurnal Ilmiah Universitas Batanghari Jambi Vol 24, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v24i1.4393

Abstract

In order to achieve maximum development, supervisory work is needed. Facilities and infrastructure are very vital and very important things in supporting the smoothness or convenience of the learning process, in relation to education that requires facilities and infrastructure and also their utilization both in terms of intensity and creativity in their use by lecturers and students in learning activities teach. Educational facilities are all the facilities needed in the teaching and learning process, both movable and immovable so that the achievement of educational goals can run smoothly, regularly, effectively and efficiently. In the 2021 fiscal year the Banten Poltekes campus received a budget of 9,779,346,000. The allocation of these funds was intended to continue the construction of the Phase VII Poltekes building, there were delays caused by disputes. These disputes stem from several factors between stakeholders, in which each stakeholder has different problems and this requires quite a long time to identify the causative factors and find the right solution. The purpose of this study was to analyze the factors causing delays in the construction of the Polytechnic Health Campus building in Banten. The research was conducted using a qualitative method by means of a narrative description, in which the researcher conducted interviews with the Director of PT. Rahandika Nusa Perkasa. The results of the study found that the factors causing the delay in the construction of the Poltekkes campus building in Banten were due to the very short time given, the selection of workers who were not good, the frequent exchange of workers, the lack of material transportation equipment.
Analisis Penerapan Manajemen Proyek dalam Perencanaan Instalasi Pengolahan Air Limbah (IPAL) di Perkotaan (Studi Kasus di Kawasan Tb. Simatupang) Rachmatama, Riesky; Azhar, Moh.
Jurnal Ilmiah Universitas Batanghari Jambi Vol 24, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v24i1.4373

Abstract

Urban WWTP development in the Simatupang area will integrating water life cycle, from managing waste water flow to reservoir, and then the raw water will be treated for drinking water. The most important effluent of waste water must be store first in the reservoir, and then treated for drinking water; it is possible direct converted from waste water to drinking water, however, the culture and religion of the community was not accepted. Construction of WWTP will be applied for business/mixuse area along 8 km and utilize 9 Ha land in the commercial area. The formulation of the problem of analyzing the application of project management in urban WWTP planning in the TB Simatupang area, is how the application of project management can affect the smoothness and success of the planning process for Urban WWTP development in the TB Simatupang area. In this problem formulation, the focus is placed on the effect of project management implementation on Simatupang WWTP planning. This led to research on evaluating the project management steps taken and their impact on the smoothness and success of the WWTP planning.
Analisis Kinerja Tender dengan Sistem Penilaian Kualifikasi “Nilai Pengalaman Tertinggi” pada Perusahaan Konstruksi Lisa, Ulfa Sama; Azhar, Moh.; Sembiring, Kristina; Maharani, Sri
Jurnal Ilmiah Universitas Batanghari Jambi Vol 24, No 1 (2024): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v24i1.4047

Abstract

Bidding activities in a job are carried out through a tender offer to select up to the process of appointing which company is appropriate in carrying out a work package. The method for determining the winner of the tender can be done by knockout method, value or cost assessment. Bidding that is usually made by companies can have several problems, while the main thing that often arises is that bids are made too high in the hope that bidders can get a large profit, or vice versa they cannot offer prices that are too low due to the hope of getting a project opportunity. the greater it is. Companies that procure both goods and services are carried out efficiently, effectively, transparently, openly, competitively, fairly and accountably. Based on BPS data by DataIndonesia.ID, there are 131,414 companies in Indonesia in 2021. This number has increased by 1.76% compared to the previous year of 129,137 companies. The large number of construction companies has the impact of increasing competition between companies in winning an auction/tender. The purpose of this study was to analyze the Tender Performance With the Highest Experience Value Qualification Rating System in Construction Companies. The method used in this research is descriptive method with purposive sampling technique. The sample of this research is 88 companies located in Jabodetabek. The results showed that there was an effect of the highest experience value on winning tenders in construction companies in Jakarta with a p value <0.005. The conclusion in this study is that the highest experience value rating system affects the evaluation of tender acceptance qualifications in construction companies.