Claim Missing Document
Check
Articles

Found 6 Documents
Search

OPTIMALISASI ALOKASI AIR UNTUK IRIGASI DENGAN MENGGUNAKAN PROGAM LINIER (STUDI KASUS DAERAH IRIGASI AIR BENDUNGAN LAREN LAMONGAN JAWA TIMUR) Efendi, Hendrawan Zunaidi; PRASETYO, DONNY JULY
DEARSIP : Journal of Architecture and Civil Vol 1 No 2 (2021): November 2021
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v1i2.2905

Abstract

Daerah Irigasi Laren berada di wilayah Kabupaten Lamongan yang melewati Kecamatan Laren dengan luas baku sawah 1.457 Ha. Sumber air irigasi dari Sungai Bengawan Solo melalui Bendung Laren. Terbatasnya jumlah air di musim kemarau dapat mengurangi pemberian air ke sawah. Untuk memaksimalkan produksi tani perlu peningkatan produktivitas lahan dan pemberian air yang teratur sesuai dengan kebutuhan dan persediaan. Untuk analisa ini digunakan program linier Quantity Methods for Windows 2 dengan input kebutuhan air tiap jenis tanaman dan volume andalan sebagai kendala/batasan untuk pengoperasian program linier. Output dari program ini ialah luas sawah maksimum tiap jenis tanaman, musim tanamnya dan keuntungan hasil tani yang didapat. Dari beberapa alternatif rencana, didapat pola tanam yang menghasilkan keuntungan terbesar yaitu pola tanam padi-palawija, padi, palawija pada awal tanam Desember III dengan pendapatan Rp 37.135.920.000 dan keuntungan Rp 697.807.000 dari kondisi tanam eksisting serta intensitas tanam 242,41 %.
ANALISA PENGARUH KINERJA MANDOR TERHADAP KUALITAS PROYEK KONTRUKSI DI KOTA SURABAYA Khusna, Nuqi Ikhwanul; Mayasari, Intan; PRASETYO, DONNY JULY
DEARSIP : Journal of Architecture and Civil Vol 2 No 1 (2022): Mei 2022
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v2i1.3350

Abstract

Kualitas proyek adalah totalitas penampilan dan karakteristik produk atau jasa yang berusaha semaksimal mungkin untuk memenuhi kebutuhan proyek. Output mandor adalah pekerjaan yang dilakukan mandor dalam melaksanakan tugas dan tanggung jawabnya. Penelitian ini bertujuan untuk mengetahui pengaruh kinerja mandor terhadap kualitas proyek di kota Surabaya. Besar sampel adalah 79 orang dengan metode pengambilan sampel yang digunakan adalah intensional sampling. Alat yang digunakan adalah kuesioner. Hasil penelitian menunjukkan pengaruh kinerja mandor terhadap kualitas proyek berdasarkan perhitungan yang dilakukan bahwa korelasi antara kinerja mandor dan kualitas proyek adalah 0,663 dan koefisien determinasi adalah 0,663 yang ditetapkan sebesar 42,6%. Artinya ada pengaruh positif dan signifikan antara kinerja mandor dengan kualitas proyek.
ANALISIS PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) (Studi Kasus Pada Proyek Pembangunan Gedung Urusan Kesehatan (URKES) POLRES Lamongan ) Kurniawan, Arif Budi; PRASETYO, DONNY JULY
DEARSIP : Journal of Architecture and Civil Vol 2 No 2 (2022): November 2022
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v2i2.3538

Abstract

Penelitian ini bertujuan untuk melakukan analisis apakah Proyek Pembangunan Gedung Sarana Kesehatan (Urkes) Polres Lamongan yang dilaksanakan sudah menerapkan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) sesuai dengan UU yang berlaku, serta untuk mengetahui sejauh mana implementasi dan faktor-faktor yang mempengaruhi pencapaian implementasi SMK3 sesuai dengan peraturan UU dan pencegahan kecelakaan di tempat kerja. Penelitian ini menggunakan metode deskriptif kualitatif. Penelitian ini dilaksanakan di Proyek Pembangunan Gedung Urusan Kesehatan (URKES) POLRES Lamongan, terletak di Jl. Kombes Pol Moh, Duryat, Jetis, Kec. Lamongan, Kab. Lamongan. Instrumen penelitian yang digunakan adalah daftar pertanyaan wawancara, alat perekam, dan buku catatan. Prosedur pengumpulan data dilakukan dengan wawancara, dokumentasi, dan observasi. Teknik analisis data dilakukan dengan cara reduksi data, penyajian data, dan verifikasi atau penarikan kesimpulan. Hasil dari penelitian ini adalah bahwa Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) pada Proyek Pembangunan gedung urusan kesehaaatan polres lamongan Tingkat penerapan yang diterapakan dalam penelitian ini sudah baik dengan melihan nilai kontrak dan resiko pekerjaan sudah termasuk baik namun dari hasil wawancara pada proyek pembangunan gedung Urusan Kesehatan (URKES) Polres Lamongan terdapat faktor yang menyebabkan tidak terpenuhinya penerapan penerapan SMK3 yaitu kurangnya kesadaran para pekerja tentang keselamatan kerja, dan juga terbatasnya anggaran dana dalam pelaksanaan SMK3.
KRITIK KENYAMANAN BANGUNAN RUMAH KOS DI LOWOKWARU KOTA MALANG Carina, Annisa'; Abidin, Zainul; Wijaya, Anugrah Lustri; PRASETYO, DONNY JULY
DEARSIP : Journal of Architecture and Civil Vol 3 No 01 (2023): Mei 2023
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v3i01.4058

Abstract

Malang is a student city, marked by the many universities in Malang, but many boarding houses do not provide comfort to the residents. Comfort which is the focus of research is lighting, ventilation and circulation settings. The method used is descriptive deductive architectural criticism, namely departing from theory to gain substantive knowledge and its parameters. Based on the analysis of comfort, it was found that the area of the lighting opening in room 1 was 2.61m2, and in rooms 2, 3 and 4 it was 1.26m2. This means that the lighting in room 1 meets the standard, while rooms 2, 3 and 4 do not meet the standard. In terms of ventilation, room 1 has a ventilation area of 4.74m2 and rooms 2, 3 and 4 have an ventilation area of 2.04m2. Means that all rooms have met the standard. In terms of human and vehicle circulation, the object has a width of 1m which functions as access for motorbikes from the gate to the parking lot, and the motorbike parking area for the object has a size of 1.5m x 3m for 2 motorbikes, meaning it does not meet the standards.
THE METHOD OF IMPLEMENTING COLUMN WORK IN THE AL MUKHLISIN MOSQUE CONSTRUCTION PROJECT, BABAT VILLAGE Firmansyah H., Aida Riski; PRASETYO, DONNY JULY; shohib, Muhammad
DEARSIP : Journal of Architecture and Civil Vol 4 No 02 (2024): Volume 04 No. 02 (November) 2024
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v4i02.7855

Abstract

Metode pelaksanaan pekerjaan kolom merupakan bagian integral dari konstruksi yang mempengaruhi kekuatan dan stabilitas bangunan. Skripsi ini membahas penerapan metode pelaksanaan kolom pada proyek pembangunan masjid menggunakan metode in situ. Metode in situ, yang melibatkan pengecoran beton langsung di lokasi konstruksi, dipilih karena kemampuannya untuk menghasilkan elemen struktur yang kuat dan sesuai dengan desain arsitektural yang spesifik. Melalui studi kasus pada proyek pembangunan masjid Al Mukhlisin Kelurahan Babat, penelitian ini memberikan wawasan tentang penerapan metode in situ dalam konteks konstruksi bangunan religius, termasuk pertimbangan khusus yang perlu diperhatikan untuk mencapai hasil yang optimal. Dengan pendekatan ini, diharapkan dapat memberikan kontribusi praktis bagi para profesional konstruksi dalam merencanakan dan melaksanakan pekerjaan kolom dengan metode in situ secara efektif dan efisien.
THE ROLE OF DEMOCRACY IN SUPPORTING INFRASTRUCTURE DEVELOPMENT IN EAST JAVA Zamzam, Alif Firdaus; Mabruri, Mahmud Aprian; Surur, Midkholus; Prasetyo, Donny July
Indonesian Journal of Social Sciences, Policy and Politics Vol. 2 No. 2 (2024): June 2024, Indonesian Journal of Social Sciences, Policy and Politics (IJSSPP)
Publisher : Yayasan Wayan Marwan Pulungan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.69745/ijsspp.v2i2.113

Abstract

Infrastructure is an important element to facilitate the community in developing the level of Productivity and economic development. such as in East Java itself is one of the provinces with a fairly large area, so that infrastructure development in East Java still faces various challenges, such as disparities in development between regions, budget constraints, and coordination between the central and regional governments. Many factors influence it, one of which is Democracy which is implemented because this is a vital thing in running a government system, especially in Indonesia. With this phenomenon, researchers are interested in seeing the Condition, Infrastructure Development and the extent of the role of Democracy, this study uses the Literature Study method with a Qualitative Approach. This shows the fact that democracy needs to continue to be improved because the role of democracy itself aims to involve the participation of the community who directly feel the facilities from the government. Political participation of the community, the quality of political leadership, and the application of democratic principles, such as transparency, accountability, and law enforcement, are factors that contribute to encouraging infrastructure development in this area.