Reduksi Limbah Kertas dan Kardus di Kabupaten Karawang Menjadi Eko Briket Melalui Usulan Perancangan Mesin Skala Produksi Yamandito Mario Nugroho; Aksyal Abi Maulana; Gading Adithia Famella; Wahyu Fitrianto
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 3 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/eq0q5p55

Abstract

The problem of increasing waste generation in Indonesia, particularly in Karawang Regency, poses a serious environmental threat if not properly managed. One sustainable alternative is to utilize paper and cardboard waste as raw materials for eco-briquettes. This study aims to develop eco-briquette products and design a production machine capable of improving the efficiency of non-hazardous waste processing. The research method applied was experimental and engineering design. The experiment was conducted by producing several briquette samples with different compositions of paper, cardboard, and tapioca starch, which were then tested through burn duration and physical performance evaluation. The results showed that briquettes with a composition of 80% cardboard and 20% tapioca starch performed best, with a burn time of 21 minutes. Furthermore, a production system design was proposed, consisting of cutting, mixing, pressing, crushing, second mixing, and molding machines, with a production target of 100 briquettes per day. This design is projected to reduce paper and cardboard waste by approximately 1.197 tons per month. Therefore, this study demonstrates that utilizing non-hazardous waste for eco-briquette production not only provides a solution for waste reduction but also supports economic value and environmental sustainability. Keywords: Briquette, Design, Experiment, Paper, Waste  
Penentuan Komponen Kritis untuk Track Shoe Assy Excavator T200 Menggunakan Metode Analytical Hierarchy Process (AHP) di PT XYZ Aksyal Abi Maulana; Winarno Winarno; Wahyudin Wahyudin; Yamandito Mario Nugroho
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/emt48w17

Abstract

At PT XYZ, the mismatch between Procurement lead time and continuously changing production demand increases the risk of material Procurement delays, which may disrupt the assembly process of the T200 Excavator Track Shoe Assy. This study aims to identify the most critical component that has the potential to cause production delays using the Analytical Hierarchy Process (AHP) method. The evaluation was conducted based on five criteria: Procurement lead time, annual demand, Procurement frequency, usage quantity, and cost. Data were obtained from the company’s internal information system and subjective assessments provided by three experienced Procurement staff. All data were systematically analyzed using AHP to determine the priority weight of each component. The results indicate that the nut component has the highest priority weight among all alternatives, making it the primary component requiring attention in the company’s Procurement planning and strategy. All pairwise comparison matrices achieved a Consistency Ratio below 0.1, indicating that the results are valid and consistent. This study provides a quantitative basis for supporting decision-making in developing an efficient and responsiveProcurement strategy under dynamic production demand. Keywords: AHP, Critical Component, Procurement, SCM
Rekomendasi Jadwal Preventive Maintenance Mesin Gas Expander Metode Mean Time Between Failure (MTBF) dan Mean Time to Repair (MTTR) Gading Adithia Famella; Wahyudin Wahyudin; Yamandito Mario Nugroho; Daffarel Lingga Nalendra
Industrika : Jurnal Ilmiah Teknik Industri Vol. 10 No. 4 (2026): Industrika: Jurnal Ilmiah Teknik Industri
Publisher : Fakultas Teknik Universitas Tulang Bawang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37090/jwhdta62

Abstract

The issue of frequent failures in the gas expander machine at PT XYZ has resulted in significant downtime, disrupting the production process of ammonium nitrate. This study aims to provide preventive maintenance recommendations using the Mean Time Between Failure (MTBF) and Mean Time to Repair (MTTR) methods. The research was conducted over a one-month period, from January 2 to February 2, 2025, using data collection techniques such as interviews and company document analysis. The data analyzed included machine operating hours and breakdown frequency from 2019 to 2023. The calculation results showed an MTBF value of 2,158.67 hours and an MTTR value of 32 hours. The MTBF indicates that failures occur on average every 90 operating days, while the MTTR indicates that the average repair time is 1.33 days. Based on these findings, it is recommended to perform preventive maintenance every three months. This study concludes that implementing a maintenance strategy based on MTBF and MTTR can minimize unexpected breakdowns, improve machine reliability, and support the sustainability of production processes in the explosives industry. Keywords: Gas Expander, MTBF, MTTR, Preventive Maintenance