Christman, Christman
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PENENTUAN UPAH INSENTIF MONTIR BENGKEL CAT BERDASARKAN OUTPUT STANDAR PRODUKSI Christman, Christman; Sumantika, Arsyad
Computer Science and Industrial Engineering Vol 9 No 4 (2023): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v9i4.7711

Abstract

As a gesture of appreciation for successful accomplishments or performance, incentives might take the shape of higher pay, bonuses, prizes, or other rewards. Giving incentives is mostly done to boost the receivers' productivity, motivation, and performance. The Gantt Task and Bonus System method requires the workshop to spend Rp. 5,320,000 and Rp. 5,590,000 in the third and fourth weeks of May, respectively. The method used in this study is production standard output, which results in the calculation of each method being that the workshop needs to spend these amounts. The workshop must pay Rp. 4,864,000 and Rp. 5,044,500 for the Taylor Piece Wage method in the third and fourth weeks of May, respectively. The workplace only pays minimum wage to those who fall short of the goal they were assigned, and those who meet or surpass the goal are awarded an incentive worth 20% of their regular pay